Attachment_J-2_Price_Proposal_Worksheet_YC-800_and_804.xls
XLS spreadsheet 63 KB Posted
- Solicitation number
- N4523A18R0002
About this file
Attachment J-2, Price Proposal Worksheet YC-800 and 804
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
YC-800
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | YC-800 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | LABOR PRICE | MATERIAL PRICE | M/H | LABOR PRICE | MATERIAL PRICE | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0.00 | |||||||||
| 1.5 | Required Documents | $0.00 | |||||||||
| 1.6 | Progress Meeting | $0.00 | |||||||||
| 1.7 | Availability Requirements | $0.00 | |||||||||
| 1.8 | Care of Vessel | $0.00 | |||||||||
| 1.11 | CFR Reports | $0.00 | |||||||||
| 1.13 | Safety Requirements | $0.00 | |||||||||
| 1.16 | Preservation OQE | $0.00 | |||||||||
| 1.17 | Environmental/Hazwaste Managemment | $0.00 | |||||||||
| 1.20 | Gas Free | $0.00 | |||||||||
| 1.21 | Develop & Maintain Test Plan | $0.00 | |||||||||
| 3.1.3 | Blocking Plan | $0.00 | |||||||||
| 3.1.4 | Crib and Brace Blocking | $0.00 | |||||||||
| 3.1.5 | Setting and Alignment of Docking Blocks | $0.00 | |||||||||
| 3.1.6 | Docking Conference | $0.00 | |||||||||
| 3.1.7 | Docking the Vessel | $0.00 | |||||||||
| 3.1.8 | Post Docking | $0.00 | |||||||||
| 3.1.9 | Undocking the Vessel | $0.00 | |||||||||
| 3.2.1 | Identify Distinguishing Figures & Markings | $0.00 | |||||||||
| 3.2.2 | Steel Half Pipe Fender | $0.00 | |||||||||
| 3.2.3 | Zinc Anodes | $0.00 | |||||||||
| 3.2.4 | Hull Blasting & Preservation | $0.00 | |||||||||
| 3.2.5 | Hull and Freeboard Visual Inspection | $0.00 | |||||||||
| 3.2.6 | Hull and Freeboard UT Inspection | $0.00 | |||||||||
| 3.3.1 | Access Cover Repairs | $0.00 | |||||||||
| 3.3.2 | Structural Repair Tank #3 | $0.00 | |||||||||
| 3.3.3 | Cleanout Ring #3 Repair | $0.00 | |||||||||
| 3.3.4 | Cleanout Rings Broken Studs | $0.00 | |||||||||
| 3.4.1 | Open, Pump, Clean, Vent, Gas free | $0.00 | |||||||||
| 3.4.2 | Tank/Void Visual Inspection | $0.00 | |||||||||
| 3.4.3 | Indentify Color Schemes and Markings | $0.00 | |||||||||
| 3.4.4 | Preliminary Air Tests | $0.00 | |||||||||
| 3.4.5 | Tank/Void Preservation | $0.00 | |||||||||
| 3.4.6 | Access Cover Preservation | $0.00 | |||||||||
| 3.4.7 | Final Air Test | $0.00 | |||||||||
| 3.4.8 | Closeout Inspection | $0.00 | |||||||||
| 3.5.1 | Inspect Roller Chocks | $0.00 | |||||||||
| 3.5.2 | Stanchion Sockets Removals | $0.00 | |||||||||
| 3.5.3 | Pin Fixture Removals | $0.00 | |||||||||
| 3.5.4 | Port Cleat Replacement | $0.00 | |||||||||
| 3.5.5 | Main Deck Preservation | $0.00 | |||||||||
| 3.5.6 | Main Deck Visual Inspection | $0.00 | |||||||||
| 3.5.7 | Main Deck U/T Inspection | $0.00 | |||||||||
| Column Totals | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.
YC-804
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | YC-804 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | LABOR PRICE | MATERIAL PRICE | M/H | LABOR PRICE | MATERIAL PRICE | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0.00 | |||||||||
| 1.5 | Required Documents | $0.00 | |||||||||
| 1.6 | Progress Meeting | $0.00 | |||||||||
| 1.7 | Availability Requirements | $0.00 | |||||||||
| 1.8 | Care of Vessel | $0.00 | |||||||||
| 1.11 | CFR Reports | $0.00 | |||||||||
| 1.13 | Safety Requirements | $0.00 | |||||||||
| 1.16 | Preservation OQE | $0.00 | |||||||||
| 1.17 | Environmental/Hazwaste Managemment | $0.00 | |||||||||
| 1.20 | Gas Free | $0.00 | |||||||||
| 1.21 | Develop & Maintain Test Plan | $0.00 | |||||||||
| 3.1.3 | Blocking Plan | $0.00 | |||||||||
| 3.1.4 | Crib and Brace Blocking | $0.00 | |||||||||
| 3.1.5 | Setting and Alignment of Docking Blocks | $0.00 | |||||||||
| 3.1.6 | Docking Conference | $0.00 | |||||||||
| 3.1.7 | Docking the Vessel | $0.00 | |||||||||
| 3.1.8 | Post Docking | $0.00 | |||||||||
| 3.1.9 | Undocking the Vessel | $0.00 | |||||||||
| 3.2.1 | Identify Distinguishing Figures & Markings | $0.00 | |||||||||
| 3.2.2 | Steel Half Pipe Fender | $0.00 | |||||||||
| 3.2.3 | Zinc Anodes | $0.00 | |||||||||
| 3.2.4 | Hull Blasting & Preservation | $0.00 | |||||||||
| 3.2.5 | Hull and Freeboard Visual Inspection | $0.00 | |||||||||
| 3.2.6 | Hull and Freeboard UT Inspection | $0.00 | |||||||||
| 3.3.1 | Access Cover Repairs | $0.00 | |||||||||
| 3.3.2 | Cleanout Ring #3 Repair | $0.00 | |||||||||
| 3.3.3 | Cleanout Ring Broken Stud Repair | $0.00 | |||||||||
| 3.3.4 | Tank Bulkhead Penetration | $0.00 | |||||||||
| 3.3.5 | Trans Web Framing Repair | $0.00 | |||||||||
| 3.4.1 | Open, Pump, Clean, Vent, Gas free | $0.00 | |||||||||
| 3.4.2 | Tank/Void Visual Inspection | $0.00 | |||||||||
| 3.4.3 | Indentify Color Schemes and Markings | $0.00 | |||||||||
| 3.4.4 | Preliminary Air Tests | $0.00 | |||||||||
| 3.4.5 | Tank/Void Preservation | $0.00 | |||||||||
| 3.4.6 | Access Cover Preservation | $0.00 | |||||||||
| 3.4.7 | Final Air Test | $0.00 | |||||||||
| 3.4.8 | Closeout Inspection | $0.00 | |||||||||
| 3.5.1 | Deck Repair | $0.00 | |||||||||
| 3.5.2 | Deck Replace/Repair | $0.00 | |||||||||
| 3.5.3 | Stanchion Socket Removals | $0.00 | |||||||||
| 3.5.4 | Angle Iron Replacement | $0.00 | |||||||||
| 3.5.5 | Pin Fixture Removal | $0.00 | |||||||||
| 3.5.6 | Deck Fitting Removal | $0.00 | |||||||||
| 3.5.7 | Gangway Fixtures Removal | $0.00 | |||||||||
| 3.5.8 | Main Deck Preservation | $0.00 | |||||||||
| 3.5.9 | Main Deck Visual Inspection | $0.00 | |||||||||
| 3.5.10 | Main Deck U/T Inspection | $0.00 | |||||||||
| 3.6.1 | Electrical System Removal | $0.00 | |||||||||
| $0.00 | |||||||||||
| Column Totals | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.
File details come from the government source that posted it. Updated .