Attachment_J-2_Price_Proposal_Worksheet_YC-800_and_804.xls

XLS spreadsheet 63 KB Posted

Attached to
Maintenance, Repair and Preservation of YC-800 and 804
Solicitation number
N4523A18R0002
Issued by

About this file

Attachment J-2, Price Proposal Worksheet YC-800 and 804

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YC-800

INSERT CONTRACTOR/COMPANY NAME HERE
Project =YC-800DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HLABOR PRICEMATERIAL PRICEM/HLABOR PRICEMATERIAL PRICEOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0.00
1.5Required Documents$0.00
1.6Progress Meeting$0.00
1.7Availability Requirements$0.00
1.8Care of Vessel$0.00
1.11CFR Reports$0.00
1.13Safety Requirements$0.00
1.16Preservation OQE$0.00
1.17Environmental/Hazwaste Managemment$0.00
1.20Gas Free$0.00
1.21Develop & Maintain Test Plan$0.00
3.1.3Blocking Plan$0.00
3.1.4Crib and Brace Blocking$0.00
3.1.5Setting and Alignment of Docking Blocks$0.00
3.1.6Docking Conference$0.00
3.1.7Docking the Vessel$0.00
3.1.8Post Docking$0.00
3.1.9Undocking the Vessel$0.00
3.2.1Identify Distinguishing Figures & Markings$0.00
3.2.2Steel Half Pipe Fender$0.00
3.2.3Zinc Anodes$0.00
3.2.4Hull Blasting & Preservation$0.00
3.2.5Hull and Freeboard Visual Inspection$0.00
3.2.6Hull and Freeboard UT Inspection$0.00
3.3.1Access Cover Repairs$0.00
3.3.2Structural Repair Tank #3$0.00
3.3.3Cleanout Ring #3 Repair$0.00
3.3.4Cleanout Rings Broken Studs$0.00
3.4.1Open, Pump, Clean, Vent, Gas free$0.00
3.4.2Tank/Void Visual Inspection$0.00
3.4.3Indentify Color Schemes and Markings$0.00
3.4.4Preliminary Air Tests$0.00
3.4.5Tank/Void Preservation$0.00
3.4.6Access Cover Preservation$0.00
3.4.7Final Air Test$0.00
3.4.8Closeout Inspection$0.00
3.5.1Inspect Roller Chocks$0.00
3.5.2Stanchion Sockets Removals$0.00
3.5.3Pin Fixture Removals$0.00
3.5.4Port Cleat Replacement$0.00
3.5.5Main Deck Preservation$0.00
3.5.6Main Deck Visual Inspection$0.00
3.5.7Main Deck U/T Inspection$0.00
Column Totals0$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.

YC-804

INSERT CONTRACTOR/COMPANY NAME HERE
Project =YC-804DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HLABOR PRICEMATERIAL PRICEM/HLABOR PRICEMATERIAL PRICEOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0.00
1.5Required Documents$0.00
1.6Progress Meeting$0.00
1.7Availability Requirements$0.00
1.8Care of Vessel$0.00
1.11CFR Reports$0.00
1.13Safety Requirements$0.00
1.16Preservation OQE$0.00
1.17Environmental/Hazwaste Managemment$0.00
1.20Gas Free$0.00
1.21Develop & Maintain Test Plan$0.00
3.1.3Blocking Plan$0.00
3.1.4Crib and Brace Blocking$0.00
3.1.5Setting and Alignment of Docking Blocks$0.00
3.1.6Docking Conference$0.00
3.1.7Docking the Vessel$0.00
3.1.8Post Docking$0.00
3.1.9Undocking the Vessel$0.00
3.2.1Identify Distinguishing Figures & Markings$0.00
3.2.2Steel Half Pipe Fender$0.00
3.2.3Zinc Anodes$0.00
3.2.4Hull Blasting & Preservation$0.00
3.2.5Hull and Freeboard Visual Inspection$0.00
3.2.6Hull and Freeboard UT Inspection$0.00
3.3.1Access Cover Repairs$0.00
3.3.2Cleanout Ring #3 Repair$0.00
3.3.3Cleanout Ring Broken Stud Repair$0.00
3.3.4Tank Bulkhead Penetration$0.00
3.3.5Trans Web Framing Repair$0.00
3.4.1Open, Pump, Clean, Vent, Gas free$0.00
3.4.2Tank/Void Visual Inspection$0.00
3.4.3Indentify Color Schemes and Markings$0.00
3.4.4Preliminary Air Tests$0.00
3.4.5Tank/Void Preservation$0.00
3.4.6Access Cover Preservation$0.00
3.4.7Final Air Test$0.00
3.4.8Closeout Inspection$0.00
3.5.1Deck Repair$0.00
3.5.2Deck Replace/Repair$0.00
3.5.3Stanchion Socket Removals$0.00
3.5.4Angle Iron Replacement$0.00
3.5.5Pin Fixture Removal$0.00
3.5.6Deck Fitting Removal$0.00
3.5.7Gangway Fixtures Removal$0.00
3.5.8Main Deck Preservation$0.00
3.5.9Main Deck Visual Inspection$0.00
3.5.10Main Deck U/T Inspection$0.00
3.6.1Electrical System Removal$0.00
$0.00
Column Totals0$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.