Statement of Work
RFP N4523A17R0051
Ship/Activity: US NAVY SUBMARINE Title: Inspect and rebuild four high pressure air manifolds; AHP-38, AHP-53, AHP 85 and AHP-69.
Place of Performance: Guam, USA.
Period of Performance: From 23 October to 29 November, 2017
1. BACKGROUND: This work will clean and inspect the manifold filter elements and rebuild the air reducing regulators of AHP-38, AHP-53, AHP 85 and AHP-69.
2. REFERENCES:
2.1. NAVSEA Standard Item 009-109, Non-SUBSAFE Work on SUBSAFE Certified
Vessels.
2.2. NAVSEA Standard Item 009-110, Non-Nuclear Work on Nuclear Vessels.
2.3. COMUSFLTFORCOMINST 4790.3 Rev/Chg C/5, Joint Fleet Maintenance Manual
(JFMM).
2.4. TMM S0400-AD-URM-010/TUM – Tag-out User’s Manual.
2.5 MIL-STD-1622B Department of Defense Standard Practice, Cleaning of Shipboard Compressed Air Systems.
2.6 SUBMEPP Maintenance Standard – 5510-081-101 Rev/Chg D/-, Overhaul Service
Air Dryer Assembly. (AHP-69).
2.7. SUBMEPP Maintenance Standard – 5510-081-044 Rev/Chg E/1, Overhaul Air
Reducing Manifold (AHP-38, 53, and 85).
2.8. NAVSEA Instruction 389-0288 Radiological Requirements.
2.9. NSTM S0570-AC-CCM-010/8010; Industrial Ship Safety Manual for Fire
Prevention and Response
3. WORK REQUIREMENTS:
3.1. Provide all tools, test equipment, labor, engineering, and personnel protective equipment
(PPE), for accomplishing requirements.
3.1.1. Train employees, involved in this work, on required work control procedures, recognition and initiating alarms, and to be familiar with actions to be taken to evacuate the vessel. Plan to attend a project in-brief and a follow on walk through and inspection of the worksite to verify submarine safety boundaries and nuclear interfaces in the immediate work area. Employees must document training attendance at walk-through, as well as during project in-brief via signature and point of contact information on Government provided rosters.
NOTE: No Submarine Safety or nuclear boundaries shall be disturbed with these repairs.
3.1.2. Comply with the requirements of Standard Items 2.1 and 2.2.
3.1.3. Identify SUBSAFE components and/or systems located in the area of work, components and/or systems that may be affected by the work.
3.1.4. Identify Unrestricted Operations (URO) Maintenance Requirement (MRC)-related equipment located in the area of work.
3.1.5. Ensure that URO MRC-measured parameter is not violated.
3.1.6. Identify nuclear equipment including nuclear temporary/support systems and radiological containment materials located in the area of work, components and/or systems which may be affected by the work.
3.1.7. Identify all possible contact with nuclear equipment or nuclear temporary/support systems identified in the space prior to start of work.
3.1.8. Evaluate services/temporary systems to be installed by the contractor that run through spaces containing nuclear equipment for possible leakage/spray protection.
3.1.9. Evaluate the rigging path for potential damage to nuclear components/piping.
3.1.10. Prohibit contact from contractor material (permanent or temporary) with nuclear piping/components unless specifically authorized by the COR, including cleaning fluid sprays, dripping grease or liquids, inadvertent paint splatter, attaching rope or strings, wood, tape, plastic bags, and temporary services that contact hot or cold nuclear piping and components.
3.1.11. Report any inadvertent contact with nuclear equipment or nuclear temporary/support systems during the work immediately to the COR, Ship’s Duty
Office/Engineering Duty Officer and the Assistant Project Supervisor/Zone Manager.
3.1.12. Prohibit accomplishment of any work or disruption of any system or component without specific approved written instructions for accomplishing non-SUBSAFE work.
3.1.13. Maintain approved written instructions for accomplishment of non-SUBSAFE work posted at the work site.
3.1.14. Prohibit the following items from being brought onboard any nuclear powered vessel or nuclear support vessel:
3.1.14.1. Any mercury bearing equipment such as mercury thermometers, portable fluorescent lights, black lights or any other items containing mercury.
3.1.14.2. Nickel-Cadmium fasteners.
3.1.14.3. Any device that contains a source of radioactivity.
3.1.14.4. Bright yellow tools, bags, or equipment.
3.2. Code 246 will accomplish the Work Authorization requirements of Volume IV, Chapter
10 of reference 2.3 for all non-nuclear work performed on ships. Ensure all work on ship’s systems and components is properly authorized and controlled in order to ensure rigorous personnel and ship safety standards are met.
3.2.1. Coordinate with Project Code 246 and Ship’s Force personnel for submission of
Work Authorization Form (WAF) to include isolation boundaries.
3.2.2. Review WAF with Code 246 and Ship’s Force personnel to ensure understanding of authorized work areas prior to starting work.
3.2.3. Maintain a copy of the authorized WAF posted at the worksite during production work.
3.2.4. Submit change requests to isolation or work boundaries to Project Code 246 personnel.
3.2.5. Verify the requirements of reference 2.4. Project Code 246 will act as the Repair
Activity designated representative for the tag out of isolation boundaries.
3.2.6. Contractor shall coordinate with Code 246 and Ship’s Force to identify work boundaries to ensure entire work site is isolated.
3.2.7. Contractor shall review WAF(s) with Code 246 and Ship’s Force to ensure understanding of authorized work areas prior to starting work.
3.2.8. Verify that the equipment has been properly and completely isolated.
(V) (I) “VERIFY CLEANLINESS”
3.3. Maintain the requirements of reference 2.5, clean or re-establish cleanliness to Mil-STD-
1622 high pressure air components associated with prescribed work boundary.
3.3.1. Provide and maintain a written record by work item using a log record sheet as specified in CDRL A001 (Accountability of Temporary Blanks and Plugs Check-Off
Sheet), verifying installation and removal of temporary blanks/plugs used for Foreign
Material Exclusion (FME), isolation of pressure boundaries, or hydrostatic testing.
Include type, size, serial number, and associated system/equipment name or tank number and location including; frame, port or starboard, below or above water line.
3.3.2. Install and maintain blanks/plugs, nuts and bolts, colored blaze orange that will be used for hydrostatic testing on equipment, valves, and piping to withstand maximum system pressure for systems which will serve as the primary or secondary barrier to support hydrostatic testing. Existing system fasteners used for blanking that will be reused for installation are excluded from the requirement for blaze orange color.
Secure blanks in place with gaskets and fasteners or weld in place. Ensure welding requirements for blanks meet the same requirement as the piping welds. The use of cloth, polyvinyl sheet, paper, tape, and rubber sheeting as blanks is prohibited.
3.4. Using references 2.6 and 2.7 accomplish preliminary inspection/inventory and record
Trident Planned Equipment Replacement (TRIPER) Serial Number of AHP-38, AHP-53, AHP 85 and AHP-69.
3.4.1. Submit one legible copy, in electronic media, of a Condition Found Report (CFR) identifying any damaged or missing parts, TRIPER serial numbers, relief valve set points and set date to the COR 24 hours after inspection of 3.4.
3.5. Lubricate components per references 2.6 and 2.7 lubrication charts, attachment 3 and 5 respectively, with Halocarbon 25-5S and Krytox 240AC. No substitution of lubricants or manufacturer is authorized.
3.6. Document all new material and quantities installed. List/segregate material by manifold and regulator assembly.
3.6.1. Submit a Service Report identifying all installed new material in accordance with
CDRL A003.
3.7. Manifold AHP-69 (Post Trident Engineering Change (TRID)) rebuild using reference 2.6.
3.7.1. Rebuild regulator assembly -01, assembly per subparagraphs 1.c. (1) through 1.c.
(16).
(V) “VERIFY TORQUE”
3.7.1.1. 1.c. (14) (d) Torque poppet, piece 2, to stem, piece 3, to 9.2 (8.3 to
10.0) ft-lbs [110 (100 to 120) in.-lbs].
(V) “VERIFY TORQUE”
3.7.1.2. 1.c. (14) (e) Torque stem assembly, piece 26, to stem, piece 3, to 5
(4.8 to 5.3) ft-lbs [60 (57 to 63) in.-lbs].
3.7.2. Rebuild regulator control block for regulator assembly -01 per subparagraphs 1.d.
(1) through 1.d. (9).
(V) “VERIFY TORQUE”
3.7.2.1. 1.d. (7) (d) Torque poppet retainer, piece 3, to 1.5 (1.3 to 1.7) ft-lbs [17.5
(15 to 20) in.-lbs].
3.7.2.2. Complete blue checks on needle valves.
3.7.3. Rebuild regulator assembly -02, per subparagraphs 1.c. (1) through 1.c. (16).
3.7.4. Rebuild regulator control block for regulator assembly -02 per paragraphs 1.d. (1) through 1.d. (9).
(V) “VERIFY TORQUE”
3.7.4.1. 1.d. (7) (d) Torque poppet retainer, piece 3, to 1.5 (1.3 to 1.7) ft-lbs [17.5
(15 to 20) in.-lbs].
3.7.4.2. Complete blue checks on needle valves.
3.7.5. Clean and inspect filter assemblies per subparagraphs 1.b. (9) through 1.b (9) (e).
3.7.5.1. Disassemble filter assembly, clean discs, inspect inside diameter (ID) of filter elements for damage or feathering.
3.7.5.2. Submit a Condition Found Report (CFR) of the description or sample of foreign debris found to include the (ID) condition of filter assembly.
3.7.6. Pneumatic tests
NOTE: PLAN ON ALL PNUMATIC TESTING TO BE ACCOMPLISHED
SHIPBOARD.
3.7.6.1. Prior to pneumatic testing and regulator loading /operation Ship’s
Force shall complete gage calibration of AHP-70-GA-17 per maintenance requirement card G4AM.
(I) (G) “OPERATIONAL TESTING”
3.7.6.2. Witness pneumatic test completed by Ship’s Force per reference 2.6 paragraph 1.l.
3.8. AHP-38 (Post TRID) rebuild using reference 2.7.
3.8.1. Rebuild regulator assembly per subparagraphs 1.d. (1) through 1.d. (19).
(V) “VERIFY TORQUE”
3.8.1.1. 1.d. (17) (d) Torque guide, piece 17, to 6.9 (6.7 to 7.1) ft-lbs [82.5
(80 to 85) in.-lbs].
(V) “VERIFY TORQUE”
3.8.1.2. 1.d. (17) (h) Torque plug, pieces 29 and 30, to 12.5 (10 to 15) ft-lbs
[150 (120 to 180) in.-lbs].
3.8.2. Rebuild regulator control block per subparagraphs 1.e through 1.e.(9).
(V) “VERIFY TORQUE”
3.8.2.1. 1.e. (7) (d) Torque poppet retainer, piece 3, to 1.5 (1.3 to 1.7) ft-lbs
[17.5 (15 to 20) in.-lbs].
3.8.2.2. Complete blue checks on needle valves.
3.8.3. Clean and inspect filter assemblies.
3.8.3.1. Clean and inspect filter assemblies per subparagraph 1.c. (10).
3.8.3.2. Disassemble filter assembly clean discs, inspect inside diameter (ID) of filter elements for damage or feathering.
3.8.3.3. Submit a Condition Found Report (CFR) of the description or sample of foreign debris found to include the ID condition of filter assembly.
3.8.4. Pneumatic tests
NOTE: PLAN ON ALL PNUMATIC TESTING TO BE ACCOMPLISHED
SHIPBOARD.
3.8.4.1. Prior to pneumatic testing and regulator loading /operation Ship’s
Force shall complete gage calibration of AHP-40-GA-08 per maintenance requirement card G4AM.
(I) (G) “OPERATIONAL TESTING”
3.8.4.2. Witness pneumatic test completed by Ship’s Force per reference 2.7 paragraph 1.m.
3.9. Rebuild AHP-53 rebuild using reference 2.7.
3.9.1. Rebuild regulator assembly per subparagraphs 1.d. (1) through 1.d. (19).
(V) “VERIFY TORQUE”
3.9.1.1. 1.d. (17) (d) Torque guide, piece 17, to 6.9 (6.7 to 7.1) ft-lbs [82.5
(80 to 85) in.-lbs].
(V) “VERIFY TORQUE”
3.9.1.2. 1.d. (17) (h) Torque plug, pieces 29 and 30, to 12.5 (10 to 15) ft-lbs
[150 (120 to 180) in.-lbs].
3.9.2. Rebuild regulator control block per subparagraphs 1.e through 1.e.(9).
(V) “VERIFY TORQUE”
3.9.2.1. 1.e. (7) (d) Torque poppet retainer, piece 3, to 1.5 (1.3 to 1.7) ft-lbs
[17.5 (15 to 20) in.-lbs].
3.9.2.2. Complete blue checks on needle valves.
3.9.3. Clean and inspect filter assemblies.
3.9.3.1. Clean and inspect filter assemblies per 1.c. (10).
3.9.3.2. Disassemble filter assembly clean discs, inspect inside diameter (ID) of filter elements for damage or feathering.
3.9.3.3. Submit a Condition Found Report (CFR) of the description or sample of foreign debris found to include the ID condition of filter assembly.
3.9.4. Pneumatic tests
SHIPBOARD.
3.9.4.1. Prior to pneumatic testing and regulator loading /operation Ship’s
Force shall complete gage calibration of AHP-50-GA-14 per maintenance requirement card G4AM.
(I) (G) “OPERATIONAL TESTING”
3.9.4.2. Witness pneumatic test completed by Ship’s Force per reference 2.7, paragraph 1.m.
3.10. Rebuild AHP-85 rebuild using reference 2.7.
3.10.1. Rebuild regulator assembly per paragraph 1.d. (1) through 1.d. (19) .
(V) “VERIFY TORQUE”
3.10.1.1. 1.d. (17) (d) Torque guide, piece 17, to 6.9 (6.7 to 7.1) ft-lbs [82.5
(80 to 85) in.-lbs].
(V) “VERIFY TORQUE”
3.10.1.2. 1.d. (17) (h) Torque plug, pieces 29 and 30, to 12.5 (10 to 15) ft-lbs
[150 (120 to 180) in.-lbs].
3.10.2. Rebuild regulator control block per paragraph 1.e. (1) through 1.e.(9).
(V) “VERIFY TORQUE”
3.10.2.1. 1.e. (7) (d) Torque poppet retainer, piece 3, to 1.5 (1.3 to 1.7) ft-lbs
[17.5 (15 to 20) in.-lbs].
3.10.2.2. Complete blue checks on needle valves.
3.10.3. Clean and inspect filter assemblies.
3.10.3.1. Clean and inspect filter assemblies per subparagraph 1.c. (10).
3.10.3.2. Disassemble filter assembly clean discs, inspect inside diameter (ID) of filter elements for damage or feathering.
3.10.3.3. Submit a Condition Found Report (CFR) of the description or sample of foreign debris found to include the ID condition of filter assembly.
3.10.4. Pneumatic tests
SHIPBOARD.
3.10.4.1. Prior to pneumatic testing and regulator loading /operation Ship’s
Force shall complete gage calibration of AHP-70-GA-19 per maintenance requirement card G4AM.
(I) (G) “OPERATIONAL TESTING”
3.10.4.2. Witness pneumatic test completed by Ship’s Force per reference 2.7, paragraph 1.m.
3.11. Witness operational test assist ship force with lockup/regulator adjustment.
3.11.1. Submit operational test report: identify successes or failures, and corrective actions taken for each manifold.
3.12. Submit assessment of equipment to include unusual findings associated with excessive corrosion, wear, material condition, and maintenance that might aid in future work and contracts.
4. DELIVERABLE ITEMS:
4.1. Contractor Furnished Reports.
4.1.1. Distribution. Contractor furnished reports will be sent to Contracting Officer
Representative (COR) in electronic format for PSNS distribution.
4.2. Submit FME Log Attachment A, CDRL A001.
4.3. Submit a Condition Found Report (CFR) identifying any damaged or missing parts, TRIPER serial numbers, relief valve set points and set date per 3.4, CDRL A002.
4.4. Submit a Field Service Report identifying all installed new material per 3.6, CDRL A003.
4.5. Submit Condition Found Report (CFR) of the description or sample of foreign debris found and ID condition of AHP-69 filter assemblies per 3.7, CDRL A002.
4.6. Submit a Condition Found Report (CFR) of the description or sample of foreign debris found to include the ID condition of filter assembly AHP-38 per 3.8, CDRL A002.
4.7. Submit a Condition Found Report (CFR) of the description or sample of foreign debris found to include the ID condition of filter assembly AHP-53 per 3.9, CDRL A002.
4.8. Submit a Condition Found Report (CFR) of the description or sample of foreign debris found to include the ID condition of filter assembly AHP-85 per 3.10, CDRL A002.
4.9. Submit acceptance test report: identify successes or failures, and corrective actions taken for each manifold per 3.11, CDRL A004.
5. GENERAL NOTES:
5.1 NAVSEA Standard Items are available at;
www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/NSI/FY18-NSI/
6. CONTRACTOR FURNISHED MATERIAL :
6.1. Contractor shall provide all materials and equipment to perform the work except those materials and equipment specifically identified in Enclosure 1.
7. GOVERNMENT-FURNISHED PROPERTY:
7.1. Original acquisition value of material:
7.1.1. AHP-69 @ $56,000.00 each.
7.1.2. AHP-38, 53 and 85 @ $70,850.00 each.
7.2. Location of GFP:
7.2.1. Submarine Engine Room, Missile Compartment, and Forward
Compartment.
7.2.2. Manufacturer, model # and type include serial number(s):
7.2.3. VACC0 Industries
7.2.3.1. AHP-69 reducing manifold
7.2.3.1.1. Model S1E10070-04 L1
7.2.3.1.2. Serial # 303TR13201
7.2.3.1.3. Location: ML0120ERSB
7.2.3.2. AHP-38 reducing manifold
7.2.3.2.1. Model S1E10068-13
7.2.3.2.2. Serial # 304TR21943
7.2.3.2.3. Location: 4P0049FCPS
7.2.3.3. AHP-53 reducing manifold
7.2.3.3.1. Model S1E10068-13
7.2.3.3.2. Serial # 304TR01098
7.2.3.3.3. Location: 1P0086MCSO
7.2.3.4. AHP-85 reducing manifold
7.2.3.4.1. Model S1E10068-13
7.2.3.4.2. Serial # 304TR16559
7.2.3.4.3. Location: ML0120ERSB
7.3. Government provided or contractor pickup:
7.3.1. Per Enclosure (1) – Government Provided Material List derived from references 2.6 and 2.7.
7.4. Government provided services:
7.4.1. HAZMAT disposal.
7.4.2. Code 246 will ensure work authorization requirements of references 2.3 and 2.4 and any local instructions are met in support of this repair. This includes preparation and execution of Work Authorization Forms (WAFs), isolation of work site (Tag-outs), and coordination with Ship’s Force in regards to WAFs and Tag-outs.
8. QUALITY ASSURANCE:
8.1. Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the SOW. The Quality Assurance Surveillance Plan
(QASP) will be used primarily as a tool to verify that the contractor is performing all services and delivery/installation of replacement parts required by the SOW in a timely, accurate and complete fashion.
9. SECURITY REQUIREMENTS: Base access to Polaris Point Naval Station, Guam and access shall be submitted by “Base Access Request”
9.1. Security POC for Guam: M-gu-css-15-intel_comms@fe.navy.mil (Security POC Email)
COMSUBRON FIFTEEN N2/N6, Security Manager/SSO/NACO/IAM, GENSER SMO:
N437095, SCI SMO: N437093, Comm/DSN (671/315) 343-4029, VOIP 989-4030, Cell
(671) 777-9396
9.2. All references and deliverable items associated with this task are unclassified, but restricted to U.S. Citizens only.
9.3. Contractors will require access to space(s): Engine Room. The contractor is required to provide an affirmative statement certifying that non-U.S. citizens will NOT be permitted to board the vessel.
8.4 Contractor electronic devices, including cell phones and computers shall not be capable of photography or digital recording. Shipboard regulations may be more restrictive.
NOTE: If a Contractor has a gross misdemeanor or felony in the past ten years, he/she may not be granted access. Again, contractor is required to provide an affirmative statement that no employee has such record.
10. TRAVEL REQUIREMENTS:
10.1. Contractor is responsible for coordination of all travel, per diem, lodging, and car rentals required for the performance of repairs.
11. ENVIRONMENTAL AND SAFETY CONCERNS:
11.1. Radiological Requirements: In accordance with reference 2.8, contractor(s) shall not accomplish work in areas that require personal monitoring of radiation, i.e. wearing a
Thermoluminescent-Dosimeter (TLD). Planning, supervising, or performing nuclear work is not authorized without the express approval of Code 300N, Code 1200N, Code 2300, and Code 105.
11.2. Comply with reference 2.9.
NOTE: The Contractor shall cooperate with each environmental, health, safety, and accident/mishap investigation.
12. ADDITIONAL CONSIDERATIONS:
12.1. Government Supported Work Hours: Normal ship working hours are 0700 to 1600, Monday through Friday. If Government support is required outside normal work hours, special arrangements in advance will need to be made via the Project Team Representative.
12.2. Government observed holidays: 10 November and 23 November are observed government holidays.
12.3. All technical clarifications will be coordinated through the Contracting Officer’s
Representative.
mailto:M-gu-css-15-intel_comms@fe.navy.mil
GOVERNMENT PROVIDED MATERIAL LIST
1 of 2 Enclosure (1)
Dwg # Dwg
Pc
KO
I
Noun Name NIIN SMI
C
Est Cost UI Act Qty
DET - V3D10270 24 002 LOCK WIRE 002212650 6.11 LB 1
DET - V3D10270 43 003 RETAINER 008425505 5 EA 25
DET - V3D10270 39 004 RETAINER 008439726 4.8 EA 20
DET - V3D10270 40 005 RETAINER, PACKING, P 005822113 1.17 EA 3
DET - V3D10270 42 006 RETAINER, PACKING, P 005763206 1.08 EA 3
DET - V3D10270 38 007 RETAINER 008082337 7.2 EA 12
DET - V3D10270 41 008 RETAINER 008507490 6.24 EA 8
DET - V3D10270 30 009 PACKING, 001660969 1.68 EA 14
DET - V3D10270 34 010 PACKING, 001660988 1.56 EA 12
DET - V3D10270 31 011 PACKING, 001661059 0.54 EA 3
DET - V3D10270 33 012 PACKING, 001661063 0.63 EA 3
DET - V3D10270 29 013 PACKING, 001675117 2.28 EA 6
DET - V3D10270 32 014 PACKING, 001675121 3.36 EA 8
DET - V3D10270 21 015 FIBERLOCK 010675135 5.88 EA 6
DET - V3D10270 20 016 SEAT,VALVE 012339011 1373.76 EA 2
DET - V3D10270 1 017 DISK AND SEAT SET,V 013767113 C1 8619 AY 1
DET - V3D10270 14 018 SPRING,HELICAL,COMP 010676916 80.62 EA 2
DET - V3E10048 45 019 RETAINER 008439726 7.2 EA 30
DET - V3E10048 51 020 RETAINER 005821538 5.32 PG 1
DET - V3E10048 46 021 RETAINER 008013440 7.73 PG 1
DET - V3E10048 48 022 RETAINER,PACKING 008194641 3.7 EA 10
DET - V3E10048 52 023 RETAINER 008921608 3.3 EA 10
DET - V3E10048 47 024 RETAINER 008204019 9.9 EA 10
DET - V3E10048 49 025 RETAINER, PACKING 000388931 9 EA 5
DET - V3E10048 50 026 RETAINER, PACKING 005822149 7.6 EA 5
DET - V3E10048 34 027 PACKING, PREFORMED, 001660980 0.65 EA 5
DET - V3E10048 36 028 PACKING, PREFORMED, 001660988 2.08 EA 16
DET - V3E10048 33 029 PACKING, 012223502 1.44 EA 9
DET - V3E10048 42 030 PACKING, 001661058 0.65 EA 5
DET - V3E10048 35 031 PACKING, 001661063 1.05 EA 5
DET - V3E10048 39 032 PACKING, 003226397 2.25 EA 9
DET - V3E10048 43 033 PACKING, 001675116 1.45 EA 5
DET - V3E10048 38 034 PACKING, 001651950 3.8 EA 5
DET - V3E10048 40 035 PACKING, 001651958 6.2 EA 5
DET - V3E10048 41 036 PACKING, 001651962 6.7 EA 5
DET - V3D10270 35 037 O-RING 014746027 206.04 EA 6
DET - S3C10011 10 038 RETAINER 000888719 4.8 EA 16
DET - S3C10011 9 039 PACKING, 001660967 1 EA 10
DET - S3C10011 11 040 FIBERLOCK 010521023 19.8 EA 10
DET - S3C10011 10 041 RETAINER 000888719 7.5 EA 25
DET - S3C10011 9 042 PACKING, 001660967 1.2 EA 12
DET - S3C10011 2 043 STEM,FLUID VALVE 011628788 L1 5661 EA 3
DET - S3C10011 11 044 FIBERLOCK 010521023 23.76 EA 12
DET - V3E10048 3 045 SEAT,VALVE 014338208 2208.81 EA 3
DET - V3E10048 6 046 FIBER LOCK 014325037 726.75 EA 15
DET - 5510-081-
047 GREASE, 009618995 50.86 TU 1
DET - 5510-081-
048 GREASE,S 003984156 34 OZ 1
DET - V3E10048 19 049 SPRING,HELICAL,COMP 010612938 205.26 EA 3
GOVERNMENT PROVIDED MATERIAL LIST
2 of 2 Enclosure (1)
Dwg # Dwg
Pc
KO
I
Noun Name NIIN SMI
C
Est Cost UI Act Qty
DET - V3E10048 16 050 SPRING,HELICAL,COMP 011164745 37.26 EA 3
DET - V3E10048 37 051 PACKING 001031750 1.52 EA 8