About this file

N44255-13-R-8002 PPI Log

View the file

Other files for this federal contract opportunity

Other files attached to Waterfront Multiple Award Construction Contract (MACC), newest first.
File Type Posted
N44255-13-R-8002_Amendment_0006.pdf PDF
N44255-13-R-8002_PPI_Log.xlsx XLSX spreadsheet
N44255-10-R-5001_Project_List.xlsx XLSX spreadsheet
N44255-13-R-8002_Amendment_0005.pdf PDF
N44255-13-R-8002_PPI_Log.xlsx XLSX spreadsheet
N44255-13-R-8002_PPI_Log.xlsx XLSX spreadsheet
N44255-13-R-8002_Amendment_0004.pdf PDF
N44255-13-R-8002_Amendment_0003.pdf PDF
N44255-13-R-8002_PPI_Log.xlsx XLSX spreadsheet
Site_Visit_Attendees.pdf PDF
N44255-13-R-8002_Amendment_0002.pdf PDF
N44255-13-R-8002_PPI_Log.xlsx XLSX spreadsheet
Geotechnical_Recommendation_Letter.pdf PDF
N44255-13-R-8002_Task_Order_0001_PPI_Log.xlsx XLSX spreadsheet
N44255-13-R-8002_Task_Order_0001_Amendment_01.pdf PDF
N44255-13-R-8002_Amendment_0001.pdf PDF
Attachment_D_Past_Performance_Worksheet_for_Safety_-_Amendment_0001.docx DOCX document
Instructions_to_Download_Controlled_Documents_N44255-13-R-8002.pdf PDF
Attachment_F_Small_Business_Subcontracting_Plan.docx DOCX document
N44255-13-R-8002-0001_Seed_Project.pdf PDF
Attachment_C_PPQ_Construction_Experience.docx DOCX document
Attachment_G_Small_Business_Offeror_Small_Business_Participation_Breakdown.doc DOC document
Attachment_E_Small_Business_Past_Performance.docx DOCX document
N44255-13-R-8002.pdf PDF
Attachment_A_PPI_Form.doc DOC document
Attachment_D_Past_Performance_Worksheet_for_Safety.docx DOCX document
Attachment_B_Construction_Experience_Data_Sheet.docx DOCX document
N4425513R8002_Pre_Solicitation_Notice_N44255-13-R-8002.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic Contract

Government PPI NumberPPIResponse
1In addition to the BAVR information provided in the solicitation, the BAVR site also requires “Originating Command Security Officer Information”. Please also provide the appropriate contact information for these fields.The Originating Command Security Officer Information section should be left blank.
2Section 0100 describes the procedures for technical factors 1, 2, and 3 if the offeror is submitting as a Joint Venture or mentor-protegee. If our team is submitting as a prime contractor / sub-contractor relationship with a signed teaming agreement, will we be able to utilize our teaming partners past performance in our proposal?The Government will not consider experience or past performance of a subcontractor.
3Due to the down turn in Defense spending and with the paralleled reduction in available projects in the $7.5 million plus range, will the Navy, for the Purposes of this Proposal, reduce the Size requirement to $5 million and/or extend the range to projects completed within the last 10 years?See Section Amendment 0001, Section 00100, Basis of Award, B. Evaluation Factors for Award(2)(b) Technical Factors, Factor 2 - Experience(1)(i) Construction Experience.
4The Basis of Evaluation under Safety states that "Lower EMR's will be given greater weight in the evaluation" This type of evaluation does not translate to other RFP Basis of Award criteria which states that the 6 lowest price proposals determined to be technically acceptable will be selected for an IDIQ Contract.

We would request that NAVFAC clarifies what is the technically acceptable and unacceptable criteria for each of 5 Technical Factors.

We believe that that NAVFAC is only interested in awarding contracts to contractors who continually promote, believe and execute their work with consistent safe work practices and results.

We would strongly suggest that the technically acceptable and unacceptable criteria be added for all factors but specifically Factor 4 Safety should be limited to a specific EMR and DART record such as: 2013 EMR Rate must be less than .65, The EMR rate from 2008 through 2013 must show an improving downward trend, and the average EMR Rate from 2008 through 2013 must be less than .70. 2013 DART Rate must be less than 1.00, and the average DART rate from 2008 through 2013 must be less than 1.00.

See Section Amendment 0001, Section 00100, Basis of Award, B. Evaluation Factors for Award(2)(b) Technical Factors, Factor 2 - Safety. In addition, technically acceptable and unacceptable criteria can be found in Section 00100, Basis of Award, B. Evaluation Factors for Award(2)(b) Technical Factors.

N44255-13-R-8002 PPI Log