Waterfront Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
N4425513R8002
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

N44255-13-R-8002 Task Order 0001 Seed Project

View the file

Other files for this federal contract opportunity

Other files attached to Waterfront Multiple Award Construction Contract (MACC), newest first.
File Type Posted
N44255-13-R-8002_PPI_Log.xlsx XLSX spreadsheet
N44255-10-R-5001_Project_List.xlsx XLSX spreadsheet
N44255-13-R-8002_Amendment_0006.pdf PDF
N44255-13-R-8002_PPI_Log.xlsx XLSX spreadsheet
N44255-13-R-8002_Amendment_0005.pdf PDF
N44255-13-R-8002_Amendment_0004.pdf PDF
N44255-13-R-8002_PPI_Log.xlsx XLSX spreadsheet
N44255-13-R-8002_PPI_Log.xlsx XLSX spreadsheet
N44255-13-R-8002_Amendment_0003.pdf PDF
Site_Visit_Attendees.pdf PDF
N44255-13-R-8002_PPI_Log.xlsx XLSX spreadsheet
N44255-13-R-8002_Amendment_0002.pdf PDF
N44255-13-R-8002_Task_Order_0001_PPI_Log.xlsx XLSX spreadsheet
N44255-13-R-8002_Task_Order_0001_Amendment_01.pdf PDF
Geotechnical_Recommendation_Letter.pdf PDF
N44255-13-R-8002_PPI_Log.xlsx XLSX spreadsheet
N44255-13-R-8002_Amendment_0001.pdf PDF
Attachment_D_Past_Performance_Worksheet_for_Safety_-_Amendment_0001.docx DOCX document
Instructions_to_Download_Controlled_Documents_N44255-13-R-8002.pdf PDF
N44255-13-R-8002.pdf PDF
Attachment_A_PPI_Form.doc DOC document
Attachment_D_Past_Performance_Worksheet_for_Safety.docx DOCX document
Attachment_B_Construction_Experience_Data_Sheet.docx DOCX document
Attachment_G_Small_Business_Offeror_Small_Business_Participation_Breakdown.doc DOC document
Attachment_E_Small_Business_Past_Performance.docx DOCX document
Attachment_F_Small_Business_Subcontracting_Plan.docx DOCX document
Attachment_C_PPQ_Construction_Experience.docx DOCX document
N4425513R8002_Pre_Solicitation_Notice_N44255-13-R-8002.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR2880208

X

FY14 Explosive Handling Wharf (EHW) Pile Replacement, Naval Base Kitsap – Bangor, Silverdale, WA

OFFERORS MUST EXECUTE BLOCKS 14 THROUGH 20C

Magnitude of Construction in accordance with FAR 36.204 is between $1,000,000 and $5,000,000. As a design-bid-build task order, the Offeror is responsible for submitting technical and price proposals within the magnitude of construction including the minimum project requirements.

SHANNON N. MELAND 360-396-0263

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

22-Aug-2013

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within _______ 21 calendar days and complete it within ________ 365 calendar days after receiving award, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __3_______ copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 24 Oct 2013 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than __245___ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFAC NORTHWEST

1101 TAUTOG CIRCLE, SUITE 203

SILVERDALE WA 98315-1101

N44255

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

2:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX: TEL: TEL: FAX:

N44255-13-R-8002/X001 10

20B. SIGNATURE

(REV. 4-85) STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE 27. PAYMENT WILL BE MADE BY: 26. ADMINISTERED BY

(Include ZIP Code) 14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14) 16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.

governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this 28. NEGOTIATED AGREEMENT

(Must be fully completed by offeror) OFFER

N44255-13-R-8002/X001

OFFERORS ARE ADVISED THAT IF ALL APPROVALS ARE NOT OBTAINED FOR THE SEED

PROJECT, THE GOVERNMENT RESERVES THE RIGHT TO AWARD UP TO SIX CONTRACTS

WITH ONLY THE MINIMUM GUARANTEE. THE GOVERNMENT ALSO RESERVES THE RIGHT TO

AWARD THE SEED PROJECT AS TASK ORDER 0001 AT THE TIME OF THE BASIC CONTRACT

AWARD OR AT A LATER DATE, NOT TO EXCEED 90 DAYS AFTER CONTRACT AWARD IN THE

AMOUNT OF BLOCK 17 TO THE OFFER PROVIDING THE LOWEST-PRICE TECHNICALLY-

ACCEPTABLE OFFER IN ACCORDANCE WITH N44255-13-R-8002, SECTION 00100, A. BASIS OF

AWARD.

Section 00010 – Solicitation Contract Form

DO NOT COMPLETE SECTION 00010. WILL BE INCLUDED AT TIME OF AWARD.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each Waterfront MACC

FFP

X001: FY 14 Explosive Handling Wharf (EHW) Pile Replacement. Provide all labor, materials, and equipment to provide FY 14 EHW Pile Replacement.

FOB: Destination

PURCHASE REQUEST NUMBER:

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

000101 $0.00

FUND ACRN AA

FFP

Funding Doc. No.:

NAVFAC NW

Section 00100 – Bidding Schedule/Instructions to Bidders

1. DESCRIPTION OF WORK. The work includes all labor, materials, and equipment necessary to FY14 Explosive Handling Wharf (EHW) Pile Replacement, Naval Base Kitsap – Bangor, Silverdale, WA

2. INSTRUCTIONS TO BIDDERS. Section 00100 of the Basic Contract Request for Proposal (RFP) addresses the Basis of Evaluation and all instructions for preparing technical and price proposals.

3. INQUIRIES. Offerors who determine that the technical and/or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive technical proposal shall submit all questions in writing on a Pre-Proposal Inquiry (PPI) Form, Attachment A. Inquiries shall follow the instructions on Attachment A and be submitted via e-mail to shannon.meland@navy.mil. Submit only one inquiry per Form. Pre-proposal inquiries will be accepted up to 10 days prior to the due date of the proposals. A response will be provided to the firm who posed the question and all relevant PPI responses up to this date will be published via amendment to the solicitation.

4. PRE-PROPOSAL CONFERENCE/SITE VISIT. Section 00100 of the Basic Contract Request for Proposal (RFP) addresses the Pre-Proposal Conference/Site Visit.

5. PERFORMANCE AND PAYMENT BONDS. Performance and Payment Bonds in the amount of 100% of the task order value will be required for the Task Order and shall be submitted for approval to the Contracting Officer within 10 days of Task Order award. Commencement of construction is contingent upon approval of required bonds.

6. DAVIS BACON WAGE DETERMINATIONS. Contractors are required to pay the prevailing wage rate in the location the work is being performed. The applicable Davis-Bacon wage determination for this task order is WA130096, included in the basic contract.

7. FULL TEXT CLAUSES. Section 00700 identifies the clauses that are applicable to this task order and require fill-in or emphasis. All other terms and conditions identified in the basic contract are in full force by reference.

mailto:shannon.meland@navy.mil

Section 00700 – Contract Clauses

CLAUSES INCORPORATED BY FULL TEXT

52.204-2 SECURITY REQUIREMENTS (AUG 1996) - ALTERNATE II (APR 1984)

(a) This clause applies to the extent that this contract involves access to information classified "Confidential," "Secret," or "Top Secret."

(b) The Contractor shall comply with (1) the Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DOD 5220.22-M); and (2) any revisions to that manual, notice of which has been furnished to the Contractor.

(c) If, subsequent to the date of this contract, the security classification or security requirements under this contract are changed by the Government and if the changes cause an increase or decrease in security costs or otherwise affect any other term or condition of this contract, the contract shall be subject to an equitable adjustment as if the changes were directed under the Changes clause of this contract.

(d) The Contractor agrees to insert terms that conform substantially to the language of this clause, including this paragraph (d) but excluding any reference to the Changes clause of this contract, in all subcontracts under this contract that involve access to classified information.

(e) The Contractor shall be responsible for furnishing to each employee and for requiring each employee engaged on the work to display such identification as may be approved and directed by the Contracting Officer. All prescribed identification shall immediately be delivered to the Contracting Officer, for cancellation upon the release of any employee. When required by the Contracting Officer, the Contractor shall obtain and submit fingerprints of all persons employed or to be employed on the project.

(End of clause)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 21 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 days after date of award. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $550 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be DX rated order; X DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

6.1% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Washington State.

(End of provision)

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by 1) Geotechnical recommendations repairs to the EHW prepared by URS, 2006 and 2) Non-destructive testing and visual inspection conducted by KPFF Consulting Engineers, November 2012.

(End of clause)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--Thursday, 12 September 2013 at 1:00 P.M. local time

(c) Participants will meet at—See Section 00100, Instructions to Offerors, 3, Pre-Proposal Conference/Site Visit.

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JUN 2012)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the ``Web Based Training'' link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

NAVCON

(Contracting Officer: Insert applicable document type(s). Note: If a ``Combo'' document type is identified but not supportable by the Contractor's business systems, an ``Invoice'' (stand-alone) and ``Receiving Report'' (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

N44255

(Contracting Officer: Insert inspection and acceptance locations or ``Not applicable.'')

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC N68732 Issue By DoDAAC N44255 Admin DoDAAC N44255 Inspect By DoDAAC N44255 Ship To Code N44255 Ship From Code “LEAVE BLANK” Mark For Code “LEAVE BLANK” Service Approver (DoDAAC) N44255 Service Acceptor (DoDAAC) N44255 Accept at Other DoDAAC N44255 LPO DoDAAC N44255 DCAA Auditor DoDAAC “Not Applicable” Other DoDAAC(s) “Not Applicable”

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the ``Send Additional Email Notifications'' field of WAWF once a document is submitted in the system.

elenita.angeles@navy.mil m_navfac_nw_iptn_aq_wawf@navy.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Gayle Gaskell, gayle.gaskell@navy.mil.

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

5252.228-9305 NOTICE OF BONDING REQUIREMENTS ALTERNATE I (DEC 2000)

(a) Within 10 days after receipt of award, the bidder/offeror to whom the award is made shall furnish the following bond(s) each with satisfactory security;

X A Performance Bond (Standard Form 25). The performance bond shall be in a penal sum equal to 100% percent of the price payable for the contract guaranteed minimum.

X A Payment Bond (Standard Form 25A). The payment bond shall be in a penal sum equal to 100% of the price payable for the contract guaranteed minimum.

(b) Any surety company holding a certificate of authority from the Secretary of Treasury as an acceptable Surety on Federal bonds will be accepted. Individual sureties will be permitted as prescribed in FAR 28.203 and FAC 5252.228-9300. Alternative types of security in lieu of furnishing sureties on performance and/or payment bonds will be permitted as prescribed in FAR 28.204, and will be held for at least one year after the completion of the contract. Additional bond security may be required as prescribed in FAR 52.228-2. Bonds shall be accompanied by a document authenticating the agents authority to sign bonds for the surety company.

(c) The contract time for purposes of fixing the completion date, default, and liquidated damages shall begin to run 15 days from the date of award, regardless of when performance and payment bonds or deposits in lieu of surety are executed. (End of clause)

5252.236-9304 UTILITIES FOR CONSTRUCTION AND TESTING (JUN 1994)

The Contractor shall be responsible for obtaining, either from available Government sources or local utility companies, all utilities required for construction and testing. The Contractor shall provide these utilities at his expense, paid for at the current utility rate delivered to the job site. The Contractor shall provide and maintain all temporary utility connections and distribution lines, and all meters required to measure the amount of each utility used. (End of clause) mailto:elenita.angeles@navy.mil mailto:m_navfac_nw_iptn_aq_wawf@navy.mil mailto:gayle.gaskell@navy.mil

5252.228-9305 NOTICE OF BONDING REQUIREMENTS ALTERNATE I (DEC 2000)
5252.236-9304 UTILITIES FOR CONSTRUCTION AND TESTING (JUN 1994)