Amendment 001. Questions.pdf

PDF 118 KB Posted

Attached to
Emergency Diesel Generator and Automatic Transfer Switch Rental
Solicitation number
N4215827QC005
Issued by

About this file

This is a Questions and Answers document (Amendment 001) addressing clarifications for a generator rental solicitation involving the Naval Facilities Engineering Command (NAVFAC) and Naval Navy Ship Yard (NNSY).

The amendment clarifies three key requirements: (1) NAVFAC's refueling team will provide all diesel fuel and handle ongoing refueling for the rental period, relieving the contractor of fuel supply responsibility; (2) NNSY's Shop 99 will provide all required power cables and perform the electrical installation and connection of the automatic transfer switches (ATSs) and generators, with the contractor providing only technical assistance as identified in Section 3.2.7; and (3) the transfer switch configuration remains one 800-amp transfer switch for the 500 kilowatt generator and two 400-amp transfer switches for the two 350 kilowatt generators. The Statement of Work requires a minimum 24-hour generator runtime at full continuous load.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 001

1. The SOW requires a minimum 24-hour generator runtime at full continuous load. Is the contractor responsible for providing and replenishing diesel fuel throughout the rental, or will the Government supply fuel?

NAVFAC’s refueling team will provide fuel and ongoing refueling.

2. Could you confirm whether the Government will provide all required power cables and complete the electrical installation, with the contractor only providing the technical assistance identified in Section 3.2.7?

NNSY’s Shop 99 will provide cables and perform connection/installation of the ATSs and generators.

3. On the last bid, I believe the request was an 800 amp transfer switch and two 400 amp transfer switches. Can you clarify if that is the same here or if it will need to be three 800 amp transfer switches.

Yes, we are still requesting one 800A transfer switch for the 500 kW generator and two 400A transfer switches for the two 350 kW generators.

File details come from the government source that posted it. Updated .