Solicitation No. N4019220Q7088 Date: 07 July 2020

ATTACHEMENT 1 SPECIFICATIONS

AIRFIELD BUNKERS AND T-WALL BARRIERS

36TH CIVIL ENGINEERING SQUADRON (CES), ANDERSEN AFB, GU

SCOPE: Contractor shall supply and deliver-direct material for 36th Civil Engineering Squadron (36 CES) as identified below.

SCHEDULE OF WORK: Delivery of required equipment shall be accomplished on or before 30 November 2020.

INSPECTION AND ACCEPTANCE: A designated representative from 36 CES will accomplish inspection and acceptance of delivered equipment. In the absence of other agreements negotiated with respect to time provided for government review, deliverables will be inspected and the contractor notified of the representative findings within 10 workdays of the submission of the deliverable by the contractor.

REQUIREMENT:

DESCRIPTION QTY UNIT OF

ISSUE UNIT PRICE TOTAL

PRICE

Airfield Bunkers Offer should meet the below requirements:

1) Must be made of concrete and in compliance with all applicable ASTM Standards on Concrete Pipe

2) Must be reinforced with rebar and in compliance with all applicable ASTM Standard Specification for Deformed and Plain Carbon Steel Bars for Concrete Reinforcement. All rebar must be placed in a way that will support the weight of the concrete and will not compromise the structural integrity of the bunker when it is transported.

3) Must have 4 stainless steel lifting points on the roof that will large enough to accept standard crane rigging. Each point should be placed in each corner of the roof section.

4) Must be able to be moved by equipment capable of lifting a maximum of 10,000 lbs.

5) Surface must be ready to receive paint.

6) See detailed dimensions found on page 3 of this document

7) Must be delivered on or before 30 November 2020.

24 Each

T-Wall Barriers Offer should meet the below requirements:

1) Must be made of concrete and in compliance with all applicable ASTM Standards on Concrete Pipe

2) Must be reinforced with rebar and in compliance with all applicable ASTM Standard Specification for Deformed and Plain Carbon Steel Bars for Concrete Reinforcement. All rebar must be placed in a way that will support the weight of the concrete and will not compromise the structural integrity of the barrier when it is transported.

3) Must have 2 wire rope lifting points on the top that will large enough to accept standard crane rigging.

24 Each

4) Must be able to be moved by a forklift capable of lifting 10,000 lbs. and have slots on the bottom of the barrier capable of accepting 9 inch wide forklift tines.

5) Surface must be ready to receive paint.

6) See detailed dimensions found on page 4 of this document

7) Must be delivered on or before 30 November 2020.

SHIPPING COSTS: 1 EACH

TOTAL PRICE

WARRANTY: Manufacturer’s Standard Warranty.

SHIPPING: All items are to be shipped DIRECTLY to the physical address or mailing address listed, and not to a consolidated shipping point. All boxes/exterior of shipped items will be marked with POC indicated below.

SHIPPING ADDRESS:

36TH CIVIL ENGINEERING SQUADRON

ANDERSEN AFB 21021

YIGO, GUAM 96929

ATTN: MSGT. DAVID ATKINS

Detailed Dimensions: Airfield Bunkers

Detailed Dimensions: T-Wall Barriers

ATTACHEMENT 1 SPECIFICATIONS
AIRFIELD BUNKERS AND T-WALL BARRIERS
36TH CIVIL ENGINEERING SQUADRON (CES), ANDERSEN AFB, GU