N4019220Q7088_RFI QUESTIONS.pdf
PDF 608 KB Posted
- Attached to
- Airfield Bunkers and T-Wall Barriers
- Solicitation number
- N4019220Q7088
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4019220Q7088_RFI QUESTIONS_UPDATED.pdf | ||
| N4019220Q7088_RFI QUESTIONS.pdf | ||
| Specs N4019220Q7088_FINAL.pdf | ||
| COMBO N4019220Q7088_AMENDMENT 8 JULY 2020.docx | DOCX document | |
| Specs N4019220Q7088_FINAL.pdf | ||
| COMBO N4019220Q7088_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND MARIANAS
PSC 455, BOX 195
FPO AP 96540-2937
N4019220Q7088 AIRFIELD BUNKERS AND T-WALL BARRIERS
RFI QUESTIONS AND ANSWERS
DATE: 17 JULY 2020
THE PURPOSE OF THIS DOCUMENT IS TO PROVIDE ANSWERS TO CONTRACTOR’S QUESTIONS IN
SUPPORT OF THE RFP FOR AIRFIELD BUNKERS AND T-WALL BARRIERS WHICH WERE DUE AT 3:00 pm ChST on 15 JULY 2020
I. Questions and Answers:
a. What is the base width of the base for the T-Wall Barriers?
- As wide as needed for stability of a 5 foot tall barrier but not less than 2 foot wide
b. What is the size of the rebar and how much is to be used?
- As stated in the salient characteristics, rebar should be placed in a way that will support the weight of the concrete and will not compromise the structural integrity of the bunker when it is transported. Engineer work should be performed by the awarded contractor as these are prefabricated structures for purchase.
c. Firstly, what are the size of the rebar needed for reinforcement and what are the spacing’s required?
- As stated in the salient characteristics, rebar should be placed in a way that will support the weight of the concrete and will not compromise the structural integrity of the bunker when it is transported. Engineer work should be performed by the awarded contractor as these are prefabricated structures for purchase.
d. What is the spec of the concrete to be used?
- Must be made of concrete and in compliance with all applicable ASTM Standards on Concrete
Pipe
e. What is the concrete specification to be used for the manufacturing of the products, so as to ensure quality production?
- Must be made of concrete and in compliance with all applicable ASTM Standards on Concrete
Pipe
f. Will there be any funds allocated to take care of expenses incurred in the initial stages of the contract, and if so, what percentage would be allocated to cover the upfront expenses?
- Payment will be provided to the awarded contractor upon delivery and inspection of goods.
II. Other Comments/Concerns for Contractors:
a. If solicitation says that the bunkers must be able to be lifted by a machine capable of lifting a max
10,000lbs, but on the drawing of the bunkers it says 12.89 KIPS, and 1 KIP is 1000lbs, so the total would be 12,890LBS that the bunkers can weigh, but with the size of it (12 ft.) it's difficult to create such a product under 10,000lbs to accommodate for the lifting machine. That right there is conflicting.
- Size can be adjusted to meet the 10,000 lb limit.
III. A response to this RFQ must be received via e-mail no later than 3:00 pm Chamorro Standard Time (ChST) on 28 July 2020. Oral quotes will not be accepted. Emailed quotes must be received at the stated addressee email inbox on time and the addressee must be able to open the email and all attachments. No other email receipt will be acceptable. The Government does not accept responsibility for non-receipt of quotes. It is the vendor’s responsibility to request and receive confirmation of quote receipt.
File details come from the government source that posted it. Updated .