This is an Amendment of Solicitation/Modification of Contract issued by the Coast Guard Marine Corps Air Station Cherry Point Facilities, ROICC in Cherry Point, North Carolina. Amendment 0001, effective February 17, 2026, addresses pre-award Requests for Information (RFI) regarding solicitation 7536394 for the Building 246 Automatic Transfer Switch Replacement Package. The amendment clarifies that the deadline for submitting pre-award RFIs has passed and that the proposal due date of February 24, 2026, at 1:00 PM local time remains unchanged. Offerors must acknowledge receipt of this amendment with their proposals.
The amendment includes responses to nine pre-award RFIs that provide technical specifications for the automatic transfer switch replacement project. Key clarifications include that the switch does not need to be service entrance rated; the building's maximum demand is 217 kilowatts with expected demand of 100 kilowatts; a temporary generator will backfeed an existing spare 3-phase 225-amp circuit breaker in the main distribution panel rather than requiring panel rewiring; the building will not be shut down on weekends during replacement, with only a very short outage required to switch power sources; the exterior bolt switch connects through the interior ATS; the neutral will not be switched; the existing ATS is 3-pole; temporary cabling must be sized for 225 amperes using 600-volt flexible cable routed through elevated air vents to the spare circuit breaker; and temporary cable does not require conduit installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7536394 RFP.pdf | ||
| 7536394 SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 02/17/2026 7536394
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code CG MCAS Cherry Point
FACILITIES, ROICC
B-87, 748 Roosevelt Blvd.
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
Building 246 Automatic Transfer Switch Replacement Package
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7536394 Building 246 Automatic Transfer Switch, Marine Corps Air Station Cherry Point, NC
Amendment 0001 is being issued to answer pre-award RFI’s.
The deadline to submit pre-award RFI’s has passed.
The proposal due date of 24 February 2026 at 1:00 PM local time REMAINS unchanged.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
Amendment 0001 7536394 Building 246 Automatic Transfer Switch Replacement Package
RFI Responses:
1. Does the switch need to be service entrance rated?
Response:
No.
2. What is intended to be ran by temp genset?
Max Building Demand is equal to 217KW. Expected demand is equal to 100KW.
3. Does the EC need to put an allowance for temp rewriting of panels to run equipment intended to stay on?
No, temp generator will back feed existing spare 3P225 circuit breaker in MDP.
4. Is the EC allowed to shut building down on weekend to do replacement with new ATS is delivered?
No, temp generator will back feed MDP with MDP main circuit breaker open. A very short outage is required just to open the main and close the spare to the temp generator.
5. Does the exterior bolt switch go through interior ATS?
Amendment 0001 7536394 Building 246 Automatic Transfer Switch Replacement Package
Yes.
6. Is the neutral to be switched?
7. Is the existing ATS 3 pole or 4 pole?
3 pole.
8. What cabling needs to be used for temp getset?
Size cable for 225A(#4/0), use 600V flexible cable running from temp generator through elevated air vent to spare CB on MDP.
9. Does temp cable need to be in conduit?