Amendment 0001.pdf
PDF 5 MB Posted
- Attached to
- Replace Fire Alarm System, B4213
- Solicitation number
- N400857504546
About this file
This is Amendment 0001 to a federal solicitation for fire alarm system replacement at Marine Corps Air Station Cherry Point, North Carolina. The solicitation, requisition number 7504546, is issued by the Facilities Engineering & Acquisitions Division (FEAD) at Cherry Point, NC, under contracting office Code N40085. The amendment provides Pre-Award Inquiry (PPI) responses and updated technical drawings FA102 and FD102 related to the fire alarm system installation in Building 4213. The proposal due date remains Thursday, September 24, 2026, at 12:00 P.M. local time, and offerors must acknowledge receipt of this amendment with their proposals to avoid rejection.
The amendment addresses four key clarifications from pre-award inquiries: (1) revised drawings FD102 and FA102 now reflect corrected ceiling types and updated fire alarm speaker locations in Office 185 and Office 186, which were initially shown with lay-in ceilings but extend to the roof deck; (2) clarification that contractors are responsible for all costs related to system integration with any exclusive government fire alarm contracts with original equipment manufacturers and must coordinate with base maintenance contractors during programming and training; (3) confirmation that the government will remove and relocate equipment, boxes, and miscellaneous items from the simulator area during installation, except for existing computer racks with servers; and (4) notification that installation and demolition scheduling in the trainer area must be coordinated with the government point of contact, with the trainer area to remain clear during these activities. The technical drawings provided detail fire alarm demolition and installation requirements for the first floor, Area B, with specifications for new fire alarm and mass notification system components per NFPA 72 and UFC 4-021-01 standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7504546 DrawingsAsOne.pdf | ||
| Master PPI Form.xlsx | XLSX spreadsheet | |
| 7504546 RFP.pdf | ||
| 7504546 SpecsAsOne.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 4
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 5. PROJECT NO. (If applicable)
0001 09/22/2026
4. REQUISITION/PURCHASE REQ. NO.
7504546
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
FEAD CHERRY POINT
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION N400857584668 Caulk Grout Cracking in the Walls B4380
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7504546 Replace Fire Alarm System, B4213 2DLAAD Marine Corps Air Station Cherry Point, NC.
This Amendment is being issued provide PPI responses and updated drawings FA102 and FD102.
The proposal due date remains Thursday, September 24, 2026 at 12:00 P.M. local time.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
PREAWARD INQUIRY FORM
PAGE SECTION PARAGRAPH
9/18/2026 Office Space 185 and 186 are shown on multiple drawings with a lay in ceiling. During the site visit it was noted that these rooms went all the way to the roof deck. Should the fire alarm layout be based on the drawings with the intent of having a lay in ceiling in this space by the intended fire alarm system installation?
See revised FD102 and FA102 to reflect the correct ceiling type and updated fire alarm speaker locations in Office 185 and Office 186.
9/18/2026 Drawing FA001 note 16 states "AN EXCLUSIVE
GOVERNMENT CONTRACTOR/VENDOR
RESPONSIBLE FOR MAINTAINING GOVERNMENT
FIRE PROTECTION SYSTEMS SHALL BE OBTAINED
FOR TIE IN OF WORK AND/OR REPROGRAMMING
OF OPERATING, EXISTING FIRE ALARM AND
SPRINKLER SYSTEMS, AT CONTRACTORS COST".
Please clarify the intent of this note as it is unclear.
Intent of this statement is to make the contractor aware they are responsible for all costs for system integration should the base have an exclusive fire alarm contract with an OEM.
The contractor shall be responsible for all coordination with base maintenance contractor during programming and training.
9/18/2026 During the site visit the space around the simulator was filled with equipment, boxes and miscellaneous items that appeared to be . Will the contractor be responsible for the removal and replacement of these items for the installation of the scaffolding system?
Any equipment, boxes and miscellaneous items will be moved out of the way by the government except for the existing computer racks that have servers on the backside of the room.
9/18/2026 During the site visit there were multiple training scenarios happening in the trainer area. Will certain days/times be provided to the contractor for installation and demolition in this area? Also please consider we are to install a scaffolding system in this area.
Time will need to be coordinated with the government POC but trainer area should remain clear during installation and demolition.
POSTED ON
AMENDMENT
REFERENCE
QUESTION GOVERNMENT RESPONSEDATE
SUBMITTED
July 2011
STAIR
FFICE
STORAGE
STORAGE
CORRIDOR
OFFICE
STORAGE
LOBBY
BATHROOM
STORAGE
SHOP
SHOP
STAIR
BAY 1
BAY 2
OFFICE
OFFICE
OFFICE
OFFICE
SHOP
MECH.
SHOP
VAULT
L M N
G H J K O P
FACP
F
F
F
F
FIRE ALARM ZONE 1
G H J K L M N
F
AOM
MA
TC
HL
IN
E
- C
ON
TU
NE
D
ON
F
D1
FATC
DACT NAP
H H
F
F
VAULT
CORRIDOR
FI
LE
N
AM
E:
OU
R
RE
F:
PL
OT
D
AT
E:
9/2
2/2
6 1 1:2
3:4 6 A
M
1.0
FD
2 F
IR
E
AL
AR
M
- F
IR
ST
F
LO
OR
DE
MO
LIT
IO
N
- A
RE
A B.
DW
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Trail|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
RE
PL
AC
E
FI
RE
A
LA
RM
S
YS
TE
M
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7504546
CHRISTOPHER R LIN
PATRICK FAULKNER
KEY PLAN
NOT TO SCALE
KEY PLAN
N
FD102
FI
RE
A
LA
RM
FI
RS
T
FL
OO
R
- D
EM
OL
IT
IO
N
- A
RE
A B
RJP RJP AP
N8'0 16' 1/8"=1'-0"
FIRE ALARM - FIRST FLOOR - DEMOLITION - AREA B1
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING
EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE
START OF CONSTRUCTION.
NOTES
1. DISCONNECT AND REMOVE ALL FIRE ALARM COMPONENTS.
12939626
09/21/2026
L M N
G H J K O P
MA
TC
HL
IN
E
- C
ON
TI
NU
ED
O N
FA
30 30
S
S
S
S
S
S
S S S S
30 30
75 75
S
WP
S
WP
S
WP
AOM
F
FADS 1
ADS 2
ADS 2ADS 2
ADS 2
ADS 2
ADS 2
AIM
AIM
TS
PS
S
WP
S
STAIR
STORAGE
STORAGE
OFFICE
STORAGE
LOBBY
BATHROOM
STORAGE
SHOP
SHOP
STAIR
BAY 1
BAY 2
OFFICE
OFFICE
OFFICE
OFFICE
SHOP
MECH.
SHOP
ADS 16
VAULT
1W
1W
1W 1W
1W
1W
F9
FMCP
DACT
MNT
F
CORRIDOR
F
FI
LE
N
AM
E:
OU
R
RE
F:
PL
OT
D
AT
E:
9/2
1/2
6 1 2:3
6:4 3 P
M
1.0
FA
2 F
IR
E
AL
AR
M
- F
IR
ST
F
LO
OR
NE
W W
OR
K
- A
RE
A B.
DW
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Trail|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
RE
PL
AC
E
FI
RE
A
LA
RM
S
YS
TE
M
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7504546
CHRISTOPHER R LIN
PATRICK FAULKNER
KEY PLAN
NOT TO SCALE
KEY PLAN
N
FA102
FI
RE
A
LA
RM
FI
RS
T
FL
OO
R
AR
EA
B
RJP RJP AP
1. PROVIDE FIRE ALARM AND MASS NOTIFICATION
SYSTEM IN ACCORDANCE WITH NFPA 72 AND UFC
4-021-01.
2. PROVIDE MANUAL PAGING IN STAIRS.
3. PROVIDE COMBINATION FIRE ALARM AND MASS
NOTIFICATION CONTROL PANEL. PROVIDE MINIMUM 2
SLC, TWO AMP, AND FOUR NAC CLASS A CIRCUITS.
PROVIDE DACT WITH BOSCHE 465 COMMUNICATOR
COMBINATION PHONE AND FIBER. COORDINATE FIBER
PATCH PANEL CONNECTION.
4. PROVIDE SMOKE DETECTOR MOUNTED IN THE UNIT
ENCLOSURE FOR AHU. PROVIDE REMOTE ALARM
INDICATORS FOR ALL SMOKE DETECTORS WITH
INDICATORS NOT VISIBLE TO RESPONDING
PERSONNEL. PROVIDE REMOTE TEST STATIONS FOR
DUCT SMOKE DETECTORS.
5. PROVIDE INTELLIGIBILITY THROUGHOUT ADS 1.
6. PROVIDE AUDIBILITY THROUGHOUT ADS 2.
7. CONNECT DACT TO FIBER BATCH PANEL LOCATED IN
MECHANICAL ROOM 119 FOR COMMUNICATION
8. COORDINATE WITH BASE FIRE DEPARTMENT TO
PROVIDE EMERGENCY KEY BOX. MOUNT ACCORDING
TO MANUFACTURER SPECIFICATIONS.
9. PROVIDE AND INSTALL TAMPER SWITCH ON
SPRINKLER RISER.
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING
EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE
START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS
CONTRACT UNLESS SPECIFICALLY MARKED "EXISTING",
"EXIST", OR "(E)".
NOTES
1 2
N8'0 16' 1/8"=1'-0"
FIRE ALARM - FIRST FLOOR - AREA B1
12939630
09/21/2026
| CHERRY POINT, NC 28533 |
| AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL |
File details come from the government source that posted it. Updated .