This document is an amendment to a solicitation for a Generator and Automatic Transfer Switch (ATS) Replacement project at Marine Corps Air Station (MCAS) Cherry Point, North Carolina. The project involves replacing a generator and automatic transfer switch in Building 1695, with a total system rated at 208 volts AC, 300 amps, three-phase, and 60 Hz. Amendment #0003 provides responses to Request for Information (RFI) submissions and updates specification sections for the engine-generator set and automatic transfer switches dated 18 August 2025.
Key technical updates include clarifications on UPS capacity (150kVA is not used), sound limitations, exhaust pyrometer requirements, bypass isolation, NEMA enclosure ratings, and equipment removal procedures. The amendment also addresses fuel and coolant handling, with the government responsible for defueling the old generator and the contractor responsible for fueling the new generator. The proposal due date remains unchanged at August 29, 2025, at 12:00 PM local time. The project requires detailed documentation, testing, and compliance with various electrical and safety standards, including NFPA, IEEE, and UL specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7483016 Revised 8.15.25.pdf | ||
| Amendment 0002 7483016.pdf | ||
| Amendment 0001 7483016.pdf | ||
| 7483016 RFP.pdf | ||
| 7483016 Final Specs.pdf | ||
| 1695 Gen Pic1.jpg | JPG image | |
| B1695.png | PNG image | |
| 1695 Gen Pic2.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7483016 Generator and ATS Replacement, AirOps, Building 1695
MCAS Cherry Point, NC AMENDMENT
#0003
IMPORTANT
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.
If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.
NAVFAC
SPECIFICATION
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0003 08/20/2025
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
FEAD CHERRY POINT
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7483016 Generator and ATS Replacement, AirOps Building 1695, Marine Corps Air Station Cherry Point, NC
Amendment 0003 is being issued to provide responses to the RFI(s) submitted for this project and update Specification sections:
SECTION 26 35 15, ENGINE-GENERATOR SET STATIONARY 15-2500 KW is deleted and 26 35 15, ENGINE-GENERATOR SET STATIONARY 15-2500 KW, dated 18 August 2025, as shown in the footer, is added to the Project Table of Contents and accompanies this Amendment.
SECTION 26 36 23, AUTOMATIC TRANSFER SWITCHES is deleted and 26 36 23, AUTOMATIC TRANSFER SWITCHES, dated 18 August 2025, as shown in the footer, is added to the Project Table of Contents and accompanies this Amendment.
The proposal due date of August 29, 2025 at 12:00 PM local time REMAINS unchanged.
See Continuation Pages:
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
Project 7483016 Generator and ATS Replacement, AirOps
7483016
Generator and ATS Replacement, AirOps Building 1695
MCAS Cherry Point, North Carolina
Amendment 0003
Project No. 7483016
Block 14. DESCRIPTION OF AMENDMENT (cont.)
A. This amendment provides responses to the submitted RFI (s) and updates the Specification provided in the with the original Request for Proposal to the following:
RFI Responses:
1. Capacity Calculations show a 150kVA UPS. If this is correct the Generator will need to be much larger than 80kW. Sizing Report Attached.
Response: 150kVA UPS is not used. Please refer to revised specification 26 32 15, 2.1.1. Dated 8-19-2025
2. Sound Limitations will require a custom-built Enclosure. Generator in picture is in a Standard Enclosure. A custom enclosure will add to the cost & lead time. Is this required?
Response: Subject line has been removed. Not needed. Please refer to revised specification 26 32 15, 2.1.6. Dated 8-19-2025
3. Specifications require an exhaust pyrometer. This can be provided as a SEQ option. Not sure why it would be required on a Generator in a remote location.
Response: Subject line has been removed. Not needed. Please refer to revised specification 26 32 15, 2.12. Dated 8-19-2025
4. Specifications indicate Bypass Isolation. ATS in picture is not Bypass Isolation. Is this required?
Response: Subject line has been removed it was part of the original title. Not needed. Please refer to revised 26 36 15 and 26 36 23
5. Specifications require a Nema 3R. ATS in picture is inside the building. Will a Nema 1 cabinet be accepted?
Response: Nema 1 will be accepted if mounted inside.
6. What do we do with the old equipment?
Response: Government will take the old equipment after it has been disconnected and removed from mounts. Please notify government 14 days before removal.
7. Who is responsible for fueling and defueling?
Response: Government will defuel old generator. Please allow 14 day notice before for defueling. Contractor is responsible for fueling new generator.
8. I couldn’t find a tank size in the specs.
Response: Fuel tank is listed in revised 26 32 15. Dated 8-19-2025
B. Revised Specification Sections:
SECTION 26 35 15, ENGINE-GENERATOR SET STATIONARY 15-2500 KW is deleted and 26 35 15, ENGINE- GENERATOR SET STATIONARY 15-2500 KW, dated 18 August 2025, as shown in the footer, is added to the Project Table of Contents and accompanies this Amendment.
SECTION 26 36 23, AUTOMATIC TRANSFER SWITCHES is deleted and 26 36 23, AUTOMATIC TRANSFER SWITCHES, dated 18 August 2025, as shown in the footer, is added to the Project Table of Contents and accompanies this Amendment.
C. All other contract terms and conditions remain unchanged.
GENERATOR AND ATS REPLACEMENT 7483016
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24 SUMMARY OF WORK
01 14 00 11/22, CHG 3: 08/24 WORK RESTRICTIONS
01 20 00 11/20, CHG 4: 08/24 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 4: 08/24 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 08/23 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS
SCHEDULES
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL
01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 90 00 02/16 SCOPE OF WORK
DIVISION 26 - ELECTRICAL
26 32 15 05/24 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1 8/19/2025
SECTION 26 32 15
ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES
05/24
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B16.1 (2020) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250
ASME B16.3 (2021) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.5 (2020) Pipe Flanges and Flanged Fittings NPS 1/2 Through NPS 24 Metric/Inch Standard
ASME B16.9 (2018) Factory-Made Wrought Buttwelding Fittings
ASME B16.11 (2022) Forged Fittings, Socket-Welding and Threaded
ASME B16.21 (2021) Nonmetallic Flat Gaskets for Pipe Flanges
ASME BPVC SEC VIII D1 (2019) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1
ASSOCIATION OF EDISON ILLUMINATING COMPANIES (AEIC)
AEIC CS8 (2013) Specification for Extruded Dielectric Shielded Power Cables Rated 5 Through 46 kV
ASTM INTERNATIONAL (ASTM)
ASTM A53/A53M (2024) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A106/A106M (2019a) Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service
ASTM A126 (2004; R 2023) Standard Specification for Gray Iron Castings for Valves, Flanges, and Pipe Fittings
ASTM A181/A181M (2014; R 2020) Standard Specification for Carbon Steel Forgings, for General-Purpose
SECTION 26 32 15 Page 1
Piping
ASTM A193/A193M (2024) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications
ASTM A194/A194M (2024) Standard Specification for Carbon Steel, Alloy Steel, and Stainless Steel Nuts for Bolts for High-Pressure or High-Temperature Service, or Both
ASTM A234/A234M (2024) Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service
ASTM B395/B395M (2018) Standard Specification for U-Bend Seamless Copper and Copper Alloy Heat Exchanger and Condenser Tubes
ASTM D975 (2020) Standard Specification for Diesel Fuel Oils
ELECTRICAL GENERATING SYSTEMS ASSOCIATION (EGSA)
EGSA 101P (1995) Performance Standard for Engine Driven Generator Sets
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 1 (2000; R 2011) General Principles for Temperature Limits in the Rating of Electric Equipment and for the Evaluation of Electrical Insulation
IEEE 43 (2013) Recommended Practice for Testing Insulation Resistance of Rotating Machinery
IEEE 48 (2020) Test Procedures and Requirements for Alternating-Current Cable Terminations Used on Shielded Cables Having Laminated Insulation Rated 2.5 kV through 765 kV or Extruded Insulation Rated 2.5 kV through 500 kV
IEEE 81 (2012) Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
IEEE 115 (2019) Guide for Test Procedures for Synchronous Machines: Part I Acceptance and Performance Testing; Part II Test Procedures and Parameter Determination for Dynamic Analysis
SECTION 26 32 15 Page 2
IEEE 120 (2023) Master Test Guide for Electrical Measurements in Power Circuits
IEEE 404 (2012) Standard for Extruded and Laminated Dielectric Shielded Cable Joints Rated 2500 V to 500,000 V
IEEE 519 (2022) Standard for Harmonic Control in Electrical Power Systems
IEEE C2 (2023) National Electrical Safety Code
IEEE C50.12 (2005; R 2010) Standard for Salient Pole 50 HZ and 60 Hz Synchronous Generators and Generation/Motors for Hydraulic Turbine Applications Rated 5 MVA and above
IEEE C57.13 (2016) Standard Requirements for Instrument Transformers
IEEE C57.13.1 (2006; R 2012) Guide for Field Testing of Relaying Current Transformers
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2024) International Building Code
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2021) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)
IEC 60034-2A (1974; ED 1.0) Rotating Electrical Machines Part 2: Methods for Determining Losses and Efficiency of Rotating Electrical Machinery from Tests (Excluding Machines for Traction Vehicles) Measurement of Losses by the Calorimetric Method
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 3046 (2002, 2006, 2009, 2001) Reciprocating Internal Combustion Engines - Performance--Part 1, 3, 4, 5, 6
ISO 8528 (1993; R 2018) Reciprocating Internal Combustion Engine Driven Alternating Current Generator Sets--Part 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 12, 13
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-58 (2018) Pipe Hangers and Supports - Materials, Design and Manufacture, SECTION 26 32 15 Page 3
Selection, Application, and Installation
MSS SP-70 (2011) Gray Iron Gate Valves, Flanged and Threaded Ends
MSS SP-71 (2018) Gray Iron Swing Check Valves, Flanged and Threaded Ends
MSS SP-80 (2019) Bronze Gate, Globe, Angle and Check Valves
MSS SP-85 (2011) Gray Iron Globe & Angle Valves Flanged and Threaded Ends
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA ICS 2 (2000; R 2020) Industrial Control and Systems Controllers, Contactors, and Overload Relays Rated 600 V
NEMA ICS 6 (1993; R 2016) Industrial Control and Systems: Enclosures
NEMA MG 1 (2021) Motors and Generators
NEMA PB 1 (2011) Panelboards
NEMA PB 2 (2011) Deadfront Distribution Switchboards
NEMA WC 74/ICEA S-93-639 (2022) 5-46 kV Shielded Power Cable for Use in the Transmission and Distribution of Electric Energy
NEMA/ANSI C12.11 (2006; R 2019) Instrument Transformers for Revenue Metering, 10 kV BIL through 350 kV BIL (0.6 kV NSV through 69 kV NSV)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 30 (2024) Flammable and Combustible Liquids Code
NFPA 37 (2024) Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines
NFPA 70 (2023) National Electrical Code
NFPA 110 (2025) Standard for Emergency and Standby Power Systems
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE ARP892 (1965; R 1994) DC Starter-Generator, Engine
SAE J537 (2016) Storage Batteries
SECTION 26 32 15 Page 4
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-STD-461 (2015; Rev G) Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 60 Standards of Performance for New Stationary Sources
UNDERWRITERS LABORATORIES (UL)
UL 142 (2006; Reprint Jan 2021) UL Standard for Safety Steel Aboveground Tanks for Flammable and Combustible Liquids
UL 467 (2022) UL Standard for Safety Grounding and Bonding Equipment
UL 489 (2016; Rev 2019) UL Standard for Safety Molded-Case Circuit Breakers, Molded-Case Switches and Circuit-Breaker Enclosures
UL 891 (2019) UL Standard for Safety Switchboards
UL 1236 (2015; Reprint Feb 2021) UL Standard for Safety Battery Chargers for Charging Engine-Starter Batteries
UL 1437 (2006) Electrical Analog Instruments - Panel Board Types
1.2 RELATED MATERIALS
Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM, and Section 26 08 00 APPARATUS INSPECTION AND TESTING apply to this section, except as modified herein.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Engine-Generator Set and Auxiliary Equipment; G
Auxiliary Systems; G
Detailed Drawings; G
Acceptance; G
SD-03 Product Data
Harmonic Requirements; G
SECTION 26 32 15 Page 5
Engine-Generator Set Efficiencies; G
Emissions; G filters; G special tools; G
Remote Alarm Annunciator; G
Engine-Generator Parameter Schedule
Heat Exchanger
Generator
Manufacturer's Catalog
Spare Parts
Onsite Training
Vibration-Isolation
Posted Data and Instructions; G
Instructions; G
Experience
Field Engineer
General Installation
Exciter
SD-05 Design Data
Performance Criteria
Integral Main Fuel Storage Tank
Power Factor
Heat Exchanger
Time-Delay on Alarms
Cooling System
Vibration Isolation
Battery Charger
SECTION 26 32 15 Page 6
Capacity Calculations for Engine-Generator Set; G
Brake Mean Effective Pressure (BMEP) Calculations; G
Torsional Vibration Stress Analysis Computations; G
Capacity Calculations for Batteries; G
Turbocharger Load Calculations; G
SD-06 Test Reports
Performance Tests
Factory Inspection and Tests
Factory Tests
Onsite Inspection and Tests; G
Acceptance Checks and Tests; G
Functional Acceptance Tests; G
Maintenance Procedures; G
Operation and Maintenance Manuals; G
Inspections; G
Functional Acceptance Test Procedure; G
SD-07 Certificates
Cooling System
Vibration Isolation
Prototype Test
Reliability and Durability
Fuel System Certification; G
Start-Up Engineer; G
Instructor's Qualification Resume; G
Engine Emission Limits; G
Site Visit
Current Balance
Materials and Equipment
SECTION 26 32 15 Page 7
Factory Inspection and Tests
SD-09 Manufacturer's Field Reports
Engine Tests; G
Generator Tests; G
Assembled Engine-Generator Set Tests; G
SD-10 Operation and Maintenance Data
Preliminary Assembled Operation and Maintenance Manuals; G
Submit in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA and the paragraph ASSEMBLED OPERATION AND
MAINTENANCE MANUALS.
SD-11 Closeout Submittals
Posted Data and Instructions; G
Training Plan; G
1.4 QUALITY ASSURANCE
1.4.1 Conformance to Codes and Standards
Where equipment is specified to conform to requirements of any code or standard such as UL, NEMA, etc., the design, fabrication and installation must also conform to the code.
1.4.2 Vibration Limitation
Limit the maximum engine-generator set vibration in the horizontal, vertical, and axial directions to 6 mils (peak-peak RMS), with an overall velocity limit of 0.95 inches/second RMS, at rated speed for all loads through 110 percent of rated speed. The engine-generator set must be provided with vibration isolation in accordance with the manufacturer's standard recommendation. Where the vibration isolation system does not secure the base to the structure floor or unit foundation, provide seismic restraints in accordance with the seismic parameters specified.
1.4.3 Torsional Analysis
Submit torsional analysis including prototype testing or calculations which certify and demonstrate that no damaging or dangerous torsional vibrations will occur when the prime mover is connected to the generator, at synchronous speeds, plus/minus 10 percent.
1.4.4 Performance Data
Submit vibration isolation system performance data for the range of frequencies generated by the engine-generator set during operation from no load to full load and the maximum vibration transmitted to the floor. Also submit a description of seismic qualification of the engine-generator mounting, base, and vibration isolation.
SECTION 26 32 15 Page 8
1.4.5 Experience
Each component manufacturer must have a minimum of 3 years' experience in the manufacture, assembly and sale of components used with stationary engine-generator sets for commercial and industrial use. The engine-generator set manufacturer/assembler must have a minimum of 3 years' experience in the manufacture, assembly and sale of stationary engine-generator sets for commercial and industrial use. Submit a statement showing and verifying these requirements.
1.4.6 Field Engineer
The engine-generator set manufacturer or assembler must furnish a qualified field engineer to supervise the complete installation of the engine-generator set, assist in the performance of the onsite tests, and instruct personnel as to the operational and maintenance features of the equipment. The field engineer must have attended the engine generator manufacturer's training courses on installation and operation and maintenance of engine generator sets. Submit a letter listing the qualifications, schools, formal training, and experience of the field engineer.
1.4.7 Detailed Drawings
Submit detailed drawings showing the following:
a. Base-mounted equipment, complete with base and attachments, including anchor bolt template and recommended clearances for maintenance and operation.
b. Starting system.
c. Fuel system.
d. Cooling system.
e. Exhaust system.
f. Electric wiring of relays, breakers, programmable controllers, and switches including single line and wiring diagrams.
g. Lubrication system, including piping, pumps, strainers, filters, heat exchangers for lube oil and turbocharger cooling,electric heater, controls and wiring.
h. Location, type, and description of vibration isolation devices for all applications.
i. The safety system, including wiring schematics.
j. One-line schematic and wiring diagrams of the generator, exciter, regulator, governor, and instrumentation.
k. Panel layouts.
l. Mounting and support for each panel and major piece of electrical equipment.
m. Engine-generator set rigging points and lifting instructions.
SECTION 26 32 15 Page 9
1.4.8 Auxiliary Systems Engine-Generator Set and Auxiliary Equipment Drawing Requirements
Submit drawings pertaining to the engine-generator set and auxiliary equipment, including but not limited to the following:
a. Certified outline, general arrangement (setting plan), and anchor bolt details. Show total weight and center of gravity of assembled equipment on the steel sub-base.
b. Detailed elementary, schematic wiring, and interconnection diagrams of the engine starting system, jacket coolant heating system, engine protective devices, engine alarm devices, engine speed governor system, generator and excitation system, and other integral devices.
c. Detailed elementary, schematic wiring; and interconnection diagrams of the fuel system, starting battery system, engine-generator control panel, generator circuit breaker.
d. Dimensional drawings or catalog cuts of exhaust silencers, radiator, fuel day tanks, fuel oil cooler, valves and pumps, intake filters, vibration isolators, and other auxiliary equipment not integral with the engine-generator set.
1.4.9 Vibration Isolation System Certification
Submit certification from the manufacturer that the vibration isolation system will reduce the vibration to the limits specified in the paragraph
VIBRATION ISOLATION.
1.4.10 Fuel System Certification
When the fuel system requires a fuel oil cooler as described in the paragraph FUEL OIL COOLER, submit certification from the engine manufacturer that the fuel system design is satisfactory.
1.5 DELIVERY, STORAGE, AND HANDLING
Properly protect materials and equipment, in accordance with the manufacturers recommended storage procedures,before, during, and after installation. Protect stored items from the weather and contamination.
During installation, cap piping and similar openings to keep out dirt and other foreign matter.
Deliver equipment on pallets or blocking wrapped in heavy-duty plastic, sealed to protect parts and assemblies from moisture and dirt. Protect and prepare batteries for shipment as recommended by the battery manufacturer.
Store auxiliary equipment at the site in covered enclosures, protected from atmospheric moisture, dirt, and ground water.
1.6 EXTRA MATERIALS
Provide two sets of special tools and two sets of filters required for maintenance. Special tools are those that only the manufacturer provides, for special purposes, or to reach otherwise inaccessible parts. One handset must be provided for each electronic governor when required to indicate and/or change governor response settings. Furnish 4 liters one gallon of identical paint used on engine-generator set in manufacturer's
SECTION 26 32 15 Page 10 sealed container with each engine-generator set.
Wrenches and tools specifically designed and required to work on the new equipment, which are not commercially available as standard mechanic's tools, must be furnished to the Contracting Officer.
Provide proposed operating instructions for the engine-generator set and auxiliary equipment laminated between matte-surface thermoplastic sheets and suitable for placement adjacent to corresponding equipment. After approval, install operating instructions where directed.
1.7 MAINTENANCE SERVICES
Submit the operation and maintenance manuals and have them approved prior to commencing onsite tests.
1.7.1 Operation Manual
Provide threecopies of the manufacturers standard operation manual.
Sections must be separated by heavy plastic dividers with tabs which identify the material in the section. Fold drawings with the title block visible, and placed in 8-1/2 by 11 inch plastic pockets with reinforced holes. The manual must include:
a. Step-by-step procedures for system startup, operation, and shutdown;
b. Drawings, diagrams, and single-line schematics to illustrate and define the electrical, mechanical, and hydraulic systems with their controls, alarms, and safety systems;
c. Procedures for interface and interaction with related systems to include automatic transfer switches.
1.7.2 Maintenance Manual
Provide threecopies of the manufacturers standard maintenance manual.
Separate each section by a heavy plastic divider with tabs. Fold drawings with the title block visible, and placed in plastic pockets with reinforced holes. The manual must include:
a. Procedures for each routine maintenance item.Procedures for troubleshooting.Factory-service, take-down overhaul, and repair service manuals, with parts lists.
b. The manufacturer's recommended maintenance schedule.
c. A component list which includes the manufacturer's name, address, type or style, model or serial number, rating, and catalog number for the major components.
d. A list of spare parts for each piece of equipment and a complete list of materials and supplies needed for operation.
1.7.3 Assembled Operation and Maintenance Manuals
The contents of the assembled operation and maintenance manuals must include the manufacturer's O&M information required by the paragraph SD-10, OPERATION AND MAINTENANCE DATA and the manufacturer's O&M information specified in Section 26 36 23 AUTOMATIC TRANSFER SWITCHES AND
SECTION 26 32 15 Page 11
BY-PASS/ISOLATION SWITCH.
a. Manuals must be in separate books or volumes, assembled and bound securely in durable, hard covered, water resistant binder, and indexed by major assembly and components in sequential order.
b. A table of contents (index) must be made part of the assembled O&M. The manual must be assembled in the order noted in table of contents.
c. The cover sheet or binder on each volume of the manuals must be identified and marked with the words, "Operation and Maintenance Manual."
1.8 SITE CONDITIONS
Protect the components of the engine-generator set, including cooling system components, pumps, fans, and similar auxiliaries when not operating and provide components capable of the specified outputs in the following environment:
a. Site Location: _MCAS Cherry Point, NC Building 1695
b. Site Elevation: 23 feet above mean sea level.
c. Ambient Temperatures:
(1) Maximum _93 degrees F dry bulb, 78 degrees F wet bulb.
(2) Minimum 24 degrees F dry bulb.
d. Design Wind Velocity: 150 mph.
e. Prevailing Wind Direction: 230
f. Seismic Zone: Zone Class D and Seismic Design Category B. Themaximum considered earthquake corresponding to a 2 percent probability ofbeing exceeded in 50 years shall be used in the design as defined by ICC IBC.
PART 2 PRODUCTS
2.1 SYSTEM REQUIREMENTS
a. Provide and install each engine-generator set complete and totally functional, with all necessary ancillary equipment to include: air filtration; starting system; generator controls, protection, and isolation; instrumentation; lubrication; fuel system; cooling system;
and engine exhaust system. Each engine-generator set must satisfy the requirements specified in the Engine-Generator Parameter Schedule.
Submit certification that the engine-generator set and cooling system function properly in the ambient temperatures specified.
b. Provide each engine-generator set consisting of one engine, one generator, and one exciter mounted, assembled, and aligned on one base;
and all other necessary ancillary equipment which may be mounted separately. Assemble sets having a capacity of 750 kW or smaller and attach to the base prior to shipping. Sets over 750 kW capacity may be shipped in sections. Provide set components that are environmentally suitable for the locations shown and that are the manufacturer's standard product offered in catalogs for commercial or industrial use.
SECTION 26 32 15 Page 12
Provide a generator strip heater for moisture control when the generator is not operating. Identify any nonstandard products or components and the reason for their use.
2.1.1 Engine-Generator Parameter Schedule
Engine-Generator Set and Auxiliary Equipment Capacity Calculations for Engine-Generator Set
ENGINE-GENERATOR PARAMETER SCHEDULE
Identification Make/Model
Electrical Characteristics
Power Rating Emergency Standby Gross bhp rating / Net brake power rating 80 kW at 0.8 power factor
Governor Type Type Make / Model Isochronous
Overload Capacity (Prime applications
110 percent of Service Load for 1 hour in 12 consecutive hours
Service Load 78 kVA (maximum) 72 kVA (continuous)
Motor Starting kVA (Max.)
29 kVA
Power Factor 0.8lagging
Engine-Generator Applications stand-alone
Voltage Regulation (No Load to Full Load)(Stand-alone plus or minus 2 percent (maximum)
Voltage Bandwidth plus or minus 0.5 percent
Frequency 60 Hz
Voltage 208 volts
Phases 3 Phase, Wye
Minimum Generator Sub-transient
10 percent Sub-transient
Nonlinear Loads 70 kVA
Max Step Load Increase
100 percent of Service Load at 0.8 PF
SECTION 26 32 15 Page 13
ENGINE-GENERATOR PARAMETER SCHEDULE
Transient Recovery Time with Step Load Increase
1 seconds
Transient Recovery
2 seconds
Time with Step Load Increase (Frequency)
2 seconds
Maximum Voltage Deviation with Step Load
10 percent of rated voltage
Maximum Frequency Deviation with
2.5 percent of rated frequency
Max Step Load Decrease (without
100 percent of Service Load at 0.8 PF
Frequency Bandwidth (steady state) plus or minus 0.25 percent
Frequency Regulation (droop) (No Load to Full Load)
3 percent (maximum)
Frequency Bandwidth (steady state) plus or minus 0.25 percent
Reactances Synchronous reactance, Xd Transient reactance, X'd Sub-transient reactance, X"d Negative sequence reactance, X2 Zero sequence reactance, Xo
Capacity Calculations
Calculations must verify that the engine-generator set power rating is adequate for the following load conditions:
Lighting 18 kW
Computer 18 kW
Uninterruptible Power Supplies
(UPS)
Variable Frequency Drives
None
SECTION 26 32 15 Page 14
Motor Starting Sequence
Starting Order
Size (hp) Locked Rotor NEMA Code
Starting Method
Maximum Voltage Dip
Other Load kW at 0.8 power factor
Capacity Calculations for Batteries
Calculation must verify that the engine starting battery capacity exceeds dc power requirements.
Mechanical Characteristics
Engine Description
Strokes/cycle Number of cylinders Bore and Stroke, inches
Engine Speed 1800 rpm
Piston Speed 1677 fpm
Heat Exchanger Type fin-tube (radiator)
Engine Cooling Type water/ethylene glycol
Intercooler Type Air-to-Air / Jacket Water
Induction Method Naturally Aspirated / Turbocharged
Turbocharger Make / Model
Max Time to Start and be Ready to Assume
10 seconds
Max Summer Indoor Temp (Prior to Engine-generator Min Winter Indoor Temp (Prior to Engine-generator
SECTION 26 32 15 Page 15
Max Allowable Heat Transferred To Engine Generator Space at Rated Output C it
0.26 MBTU/hr
Max Summer Outdoor Temp
93 degrees F
Min Winter Outdoor Temp
24 degrees F
Installation Elevation
23 above sea level
Engine-Generator Set Efficiencies
Fuel Consumption At 0.8 power factor, Gallons / hour for:
1 / 2 load 3 / 4 load Full Load
Generator Efficiency
At 0.8 power factor,(per cent) for:
1 / 2 load 3 / 4 load Full Load
Radiator Capacity Coolant Type gpm coolant cfm air through radiator Btu per hr of heat exchange based on optimum coolant temperature to and from engine
Engine-Generator Set Emissions Data
Exhaust Temperature
Degrees F at full load
Weight of Exhaust Gas lb per hr at full load
Weight of Intake Air lb per hr at full load
Total Heat Rejected
Btu per hr, at full load to:
Jacket Coolant System Fuel Oil Cooling System
Emissions lb per hr, at full load Total Suspended Particulate Particulate Matter with an average aerodynamic diameter of 10 microns Sulfur Dioxides Nitrogen Oxides (as NO2) Carbon Monoxide Volatile Organic Compounds
Visible Emissions Percent opacity at full load
Brake Mean Effective Pressure (BMEP) Calculations
SECTION 26 32 15 Page 16
Calculation must verify that the engine meets the specified maximum BMEP, as follows:
BMEP psi = (120,000 X bkW) X (792,000 X bhp) (rpm X cu. in.)
Where:
bkW bhp = bkW' + bkW" bhp' + bhp" bkW" bhp" is the Brake kW horsepower required by engine driven fan for cooling radiator or motor driven fan for cooling radiator.
bkW' bhp' = kW/GEN.EFF. kW/(GEN.EFF. times 0.746) GEN.EFF. = Generator efficiency
cu. in. = Total engine piston displacement in cubic inches rpm = Engine revolutions per minute kW = Minimum power rating
Torsional Vibration Stress Analysis Computations
Torsional vibrational stresses in the crankshaft and generator shaft of assembled engine and driven generator must not exceed 5000 psi when engine is driving generator at rated speed while assembled unit is loaded to rated engine-generator set power. Computations must be based on a mathematical model of the assembled generator set provided or based on calculations using measured values from tests on a unit identical to the one provided. Calculations based on models of, or measured data from, the unassembled engine and generator will not be acceptable.
Calculations must include:
a. A description of the system relating information pertinent to analysis such as operating speed range and identification plate data.
b. A mass elastic assembly drawing, showing the arrangement of the units in the generator set and dimensions of shafting, including minimum diameters (or section moduli) of shafting in the system.
c. A labeled line diagram of the mass elastic system indicating values of masses, stiffness, equivalent lengths, and equivalent diameters including basic assumptions and definition of terms.
d. Sample computations showing procedures used to obtain resulting stress values.
e. Computations indicating assembled engine-generator speed of 1800 rpm with assembly loaded to rated generator power and the resulting computed critical torsional stress values in the assembled engine crankshaft and generator shaft.
Turbocharger Load Calculations
SECTION 26 32 15 Page 17
NOTE: When the engine-generator set installation includes field installed exhaust system (i.e., the engine-generator set is installed internal to a building in lieu of in a self-contained outdoor enclosure), include the following paragraph.
When the proposed exhaust system layout is different from that shown on the contract drawings, submit calculations showing that the external loads from the exhaust system such as weight and thermal expansion do not exceed the engine manufacturer's maximum allowed forces and moments on the turbocharger.
2.1.2 Rated Output Capacity
Provide each engine-generator-set with power equal to the sum of service load plus the machine's efficiency loss and associated ancillary equipment loads. Rated output capacity must also consider engine and/or generator oversizing required to meet requirements in paragraph Engine-Generator Parameter Schedule.
The engine must meet the specified maximum BMEP requirements at rated speed as calculated in accordance with the calculations in the engine-generator parameter schedule. The engine capacity must be based on the following:
a. Engine burning diesel fuel conforming to ASTM D975, Grade 2-D, or at an ambient temperature of 85 degrees F. For stationary engines operated in the United States, diesel fuel requirements are found in 40 CFR 60 Subpart IIII.
b. Engine cooled by a radiator fan mechanically driven by the engine or remote with a motor driven fan.
c. Engine cooled by coolant mixture of water and ethylene glycol, 50 percent by volume of each.
Maximum BMEP, psi
Naturally Aspirated
Turbocharged Turbocharged and Intercooled
Four-cycle engines NA 185 NA
Engine speed, rpm: 1800 1800 1800
2.1.2.1 Engine Emission Limits
Engine must be certified by the manufacturer to meet applicable EPA emission standards found in 40 CFR 60 Subpart IIII. In addition, engine must meet any applicable state or local emission requirements (ex:
California SCAQMD).
SECTION 26 32 15 Page 18
2.1.2.2 Performance Class
The voltage and frequency behavior of the generator set must be in accordance with ISO 8528 operating limit values for performance Class G2.
2.1.3 Power Ratings
Power ratings must be in accordance with EGSA 101P.
2.1.4 Transient Response
The engine-generator set governor and voltage regulator must cause the engine-generator set to respond to the maximum step load changes such that output voltage and frequency recover to and stabilize within the operational bandwidth within the transient recovery time. The engine-generator set must respond to maximum step load changes such that the maximum voltage and frequency deviations from bandwidth are not exceeded.
2.1.5 Reliability and Durability
Each standby engine-generator set must have both an engine and a generator capable of delivering the specified power on a standby basis with an anticipated mean time between overhauls of no less than 5,000 hours operating with a load factor of 70 percent. Cite two like engines and two like generators that have performed satisfactorily in a stationary power plant, independent and separate from the physical location of the manufacturer's and assembler's facilities, for standby without any failure to start, including all periodic exercise. Provide like engines and generators that have had no failures resulting in downtime for repairs in excess of 72 hours during two consecutive years of service. Provide engines that are the same model, speed, bore, stroke, number and configuration of cylinders, and rated output capacity. Provide generators that are the same model, speed, pitch, cooling, exciter, voltage regulator and rated output capacity.
Submit a reliability and durability certification letter from the manufacturer and assembler to prove that existing facilities are and have been successfully utilizing the same components proposed to meet this specification, in similar service. Certification may be based on components, i.e. engines used with different models of generators and generators used with different engines, and does not exclude annual technological improvements made by a manufacturer in the basic standard-model component on which experience was obtained, provided parts interchangeability has not been substantially affected and the current standard model meets the performance requirements specified. Provide a list with the name of the installations, completion dates, and name and telephone number of a point of contact.
2.1.6 Engine-Generator Set Enclosure
Provide engine-generator set enclosures that are corrosion resistant and fully weather resistant. The enclosure must contain all set components and provide ventilation to permit operation at Service Load under secured conditions. Provide access doors to controls and equipment requiring periodic maintenance or adjustment. Provide removable panels for access to components requiring periodic replacement. The enclosure must be capable of being removed without disassembly of the engine-generator set or removal of components other than the exhaust system.
SECTION 26 32 15 Page 19
2.1.7 Vibration Isolation
Provide an engine-generator set with a vibration isolation system in accordance with the manufacturer's standard recommendation. Submit vibration isolation system performance data for the range of frequencies generated by the engine-generator set during operation from no load to full load and the maximum vibration transmitted to the floor plus description of seismic qualification of the engine-generator mounting, base, and vibration isolation. Submit torsional analysis including prototype testing or and calculations which certify and demonstrate that no damaging or dangerous torsional vibrations will occur when the prime mover is connected to the generator, at synchronous speeds, plus 10 percent. Design and qualify vibration isolation systems as an integral part of the base and mounting system in accordance with the seismic parameters specified. Where the vibration isolation system does not secure the base to the structure floor or unit foundation, provide seismic restraints in accordance with the seismic parameters specified.
2.1.8 Harmonic Requirements
Non-linear loads to be served by each engine-generator set are as indicated. The maximum linear load demand (kVA at PF) when non-linear loads will also be in use is as indicated.
2.1.9 Starting Time Requirements
Upon receipt of a signal to start, each engine generator set will start, reach rated frequency and voltage and be ready to assume load within the time specified. For standby sets used in emergency power applications, each engine generator set will start, reach rated frequency and voltage, and power will be supplied to the load terminals of the automatic transfer switch within the starting time specified.
2.2 NAMEPLATES
Provide the manufacturer's name, type or style, model or serial number and rating on a plate secured to the equipment for each major component of this specification. Provide plates and tags sized so that inscription is readily legible to operating or maintenance personnel and securely mounted to or attached in proximity of their identified controls or equipment.
Lettering must be normal block lettering, a minimum of 0.25 inch high. As a minimum, provide nameplates for:
Engines Relays
Generators Transformers (CT & PT)
Regulators Day tanks
Pumps and pump motors Governors
Generator Breaker Air Starting System
Economizers Heat exchangers (other than base mounted)
Where the following equipment is not provided as a standard component by the engine generator set manufacturer, the nameplate information may be
SECTION 26 32 15 Page 20 provided in the maintenance manual in lieu of nameplates.
Battery charger Heaters
Switchboards Exhaust mufflers
Switchgear Silencers
Battery Exciters
2.2.1 Materials
Construct ID plates and tags of 16 gage minimum thickness bronze or stainless steel sheet metal engraved or stamped with inscription.
Construct plates and tags not exposed to the weather or high operational temperature of the engine of laminated plastic, 0.125 inch thick, matte white finish with black center core, with lettering accurately aligned and engraved into the core.
2.2.2 Control Devices and Operation Indicators
Provide ID plates or tags for control devices and operation indicators, including valves, off-on switches, visual alarm annunciators, gages and thermometers, that are required for operation and maintenance of provided mechanical systems. Plates or tags must be minimum of 0.5 inch high and 2 inches long and must indicate component system and component function.
2.2.3 Equipment
Provide ID plates of a minimum size of high and 5 inches long on provided equipment indicating the following information:
a. Manufacturer's name, address, type and model number, serial number, and certificate of compliance with applicable EPA mission standards;
b. Contract number and accepted date;
c. Capacity or size;
d. System in which installed; and
e. System which it controls.
2.3 SAFETY DEVICES
Exposed moving parts, parts that produce high operating temperatures, parts which may be electrically energized, and parts that may be a hazard to operating personnel must be insulated, fully enclosed, guarded, or fitted with other types of safety devices. Install safety devices such that proper operation of the equipment is not impaired.
2.4 MATERIALS AND EQUIPMENT
Submit certification stating that where materials or equipment are specified to comply with requirements of UL, written proof of such compliance has been obtained. The label or listing of the specified agency, or a written certificate from an approved, nationally recognized testing organization equipped to perform such services, stating that the items have been tested and conform to the requirements and testing methods
SECTION 26 32 15 Page 21 of the specified agency are acceptable as proof.
2.4.1 Circuit Breakers, Low Voltage
UL 489.
2.4.2 Filter Elements
Provide the manufacturer's standard fuel-oil, lubricating-oil, and combustion-air filter elements.
2.4.3 Instrument Transformers
NEMA/ANSI C12.11.
2.4.4 Revenue Metering
IEEE C57.13.
2.4.5 Pipe (Fuel/Lube-Oil, Compressed Air, Coolant, and Exhaust)
ASTM A53/A53M, or ASTM A106/A106M steel pipe. Pipe smaller than 2 inches must be Schedule 80. Pipe 2 inches and larger must be Schedule 40.
2.4.5.1 Flanges and Flanged Fittings
ASTM A181/A181M, Class 60, or ASME B16.5, Grade 1, Class 150.
2.4.5.2 Pipe Welding Fittings
ASTM A234/A234M, Grade WPB or WPC, Class 150 or ASME B16.11, 3000 lb.
2.4.5.3 Threaded Fittings
ASME B16.3, Class 150.
2.4.5.4 Valves
MSS SP-80, Class 150.
2.4.5.5 Gaskets
Manufacturer's standard.
2.4.6 Pipe Hangers
MSS SP-58.
2.4.7 Electrical Enclosures
NEMA ICS 6.
2.4.7.1 Switchboards
NEMA PB 2.
2.4.7.2 Panelboards
NEMA PB 1.
SECTION 26 32 15 Page 22
2.4.8 Electric Motors
Provide electric motors that conform to the requirements of NEMA MG 1.
Motors must have sealed ball bearings and a maximum speed of 1800 rpm.
Motors used indoors must have drip-proof frames; enclose those that are used outside. Alternating current motors larger than 1/2 Hp must be of the squirrel-cage induction type for operation on 208 volts or higher, 60 Hz, and three-phase power. Alternating current motors 1/2 Hp or smaller, must be suitable for operation on 120 volts,60 Hz, and single-phase power.
Direct current motors must be suitable for operation on 125 volts.
2.4.9 Motor Controllers
Provide motor controllers and starters that conform to the requirements of NFPA 70 and NEMA ICS 2.
2.5 ENGINE
Each engine must operate on No. 2-D diesel fuel conforming to ASTM D975, must be designed for stationary applications and must be complete with ancillaries. The engine must be a standard production model shown in the manufacturer's catalog describing and depicting each engine-generator set and all ancillary equipment in sufficient detail to demonstrate complete specification compliance. The engine must be naturally aspirated, supercharged, or turbocharged. The engine must be 2- or 4-stroke-cycle and compression-ignition type. The engine must be vertical in-line, V- or opposed-piston type, with a solid cast block or individually cast cylinders. The engine must have a minimum of two cylinders. Opposed-piston type engines must have more than four cylinders. Each block must have a coolant drain port. Equip each engine with an over-speed sensor.
ISO 3046. Diesel engines must be four-cycle naturally aspirated, or turbocharged, or turbocharged and intercooled; vertical in-line or vertical Vee type; designed for stationary service. Engines must be capable of immediate acceleration from rest to normal speed without intermediate idle/warm up period or pre-lubrication to provide essential electrical power. Two-cycle engines are not acceptable.
2.5.1 Sub-base Mounting
Mount each engine-generator set on a structural steel sub-base sized to support the engine, generator, and necessary accessories, auxiliaries and control equipment to produce a complete self-contained unit as standard with the manufacturer. Design the structural sub-base to properly support the equipment and maintain proper alignment of the engine-generator set in the specified seismic zone. In addition, provide sub-base with both lifting rings and jacking pads properly located to facilitate shipping and installation of the unit. Factory align engine and generator on the sub-base and securely bolt into place in accordance with the manufacturer's standard practice. Crankshaft must have rigid coupling for connection to the generator.
2.5.2 Assembly
Completely shop assemble each engine-generator set on its structural steel sub-base. Paint entire unit with manufacturer's standard paints and colors. After factory tests and before shipping, thoroughly clean and retouch painting as necessary to provide complete protection.
SECTION 26 32 15 Page 23
2.5.3 Turbocharger
If required by the manufacturer to meet the engine-generator set rating, provide turbine type driven by exhaust gas from engine cylinders, and direct connected to the blower supplying air to the engine intake manifold.
2.5.4 Intercooler
Provide manufacturer's standard intercooler for engine size specified.
2.5.5 Crankcase Protection
2.5.6 Miscellaneous Engine Accessories
Provide the following engine accessories where the manufacturer's standard design permits:
a. Piping on engine to inlet and outlet connections, including nonstandard companion flanges.
b. Structural steel sub-base and vibration isolators, foundation bolts, nuts, and pipe sleeves.
c. Level jack screws or shims, as required.
d. Rails, chocks, and shims for installation of sub-base on the foundation.
e. Removable guard, around fan. Support guard, on engine sub-base, to suit manufacturer's standard.
2.5.7 Intercooler
Provide manufacturer's standard intercooler for engine size specified.
2.6 FUEL SYSTEM
Provide fuel system conforming to the requirements of NFPA 30 and NFPA 37 and containing the following elements.
2.6.1 Integral Main Fuel Storage Tank
Provide each engine with an integral main fuel tank. Each tank must be factory installed and provided as an integral part of the generator manufacturer's product. Provide each tank with connections for fuel supply line, fuel return line, local fuel fill port, gauge, vent line, and float switch assembly.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .