Amendment 0001 7388857.pdf
PDF 2 MB Posted
- Attached to
- Upgrade Lift Station, B4228
- Solicitation number
- N400857388857
About this file
This document is an Amendment (#0001) to a solicitation for the Upgrade of Lift Station B4228 at Marine Corps Air Station (MCAS) Cherry Point, North Carolina, with work order number 7388857. The amendment addresses several pre-award Request for Information (RFI) questions regarding technical specifications, including power supply configurations, pump station details, basin dimensions, and electrical requirements. The proposal due date remains unchanged at September 2, 2025, at 1:00 PM local time.
The amendment includes detailed technical responses for five specific RFI questions, such as clarifying electrical schedules, confirming pump station configurations, and specifying basin sizes. The project involves upgrading a simplex packaged grinder pump station with specific requirements including the ability to pump 25 GPM at 48 feet Total Dynamic Head (TDH), using acceptable manufacturers like Flygt, Myers, Barnes, or E-One. The electrical specifications vary by lift station location, with voltage ranging from 208V single or three-phase, and amperage between 15-30 amps, with provisions for maintaining existing SCADA systems during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 7388857.pdf | ||
| 7388857 DrawingsAsOne SIGNED.pdf | ||
| 7388857 SpecsAsOne SIGNED.pdf | ||
| 7388857 RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC
SPECIFICATION
7388857 Upgrade Lift Station B4228
MCAS Cherry Point, NC
AMENDMENT #0001
IMPORTANT
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.
If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 8/28/2025 7388857
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
FEAD CHERRY POINT
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
Upgrade Lift Station B4228
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7388857 Upgrade Lift Station B4228, Marine Corps Air Station Cherry Point, NC
Amendment 0001 is being issued to answer pre-award RFIs.
The deadline to submit pre-award RFI’s HAS PASSED.
The proposal due date of 2 September 2025 at 1:00 PM local time REMAINS unchanged.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
Amendment 0001 7388857 Upgrade Lift Station B4228
RFI Responses:
1. Spec Sect 33 32 16, 2.4.5.1.C: No flow light as sensed by limit switch on the check valve or as sensed by current sensors. Will there be a flow meter or valve limit switch that will be used to signal No Flow?
Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
2. Plan sheet C-500 shows the power supply to the station as 3/208V in the detail illustration of the pump station, but as 1/208V on the electrical schedule for 4228. Which power supply is correct?
Response: Follow information in the electrical schedule. See revised sheet C-500.
3. Page 4 of the spec, paragraph 2.2 calls for explosion proof pumps. Is explosion proof construction required?
Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
4. Sheet C-500 of the plans calls for a 48"X72" basin but the elevations listed to the right call out a depth of 96". This is a large basin for a single pump. Please confirm dimensions for the basin.
Response: Size stated in detail 4 is minimum size. Follow information required by the elevation schedule. See revised sheet C-500.
5. Section 2.4.1 (page 5 of 33 32 16) mentions “both pumps”, as if this is a duplex system. Please confirm that this is a simplex station, as illustrated on the plans.
Response: 2.2 states to provide number of pumps as indicated on the drawings. This is a standard government spec. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
Subj: AMENDMENT TO WO 7388857 UPGRADE LIFT STATION, B4228, MCAS CHERRY POINT NC
CONTINUATION SHEET
DOCUMENT 00 01 15
1.2 CONTRACT DRAWINGS
The following drawings are revised as of 27 AUG 2025:
NAVFAC DWG NO. TITLE
12882470 G-001 COVER SHEET AND INDEX
12882476 C-500 CIVIL DETAILS
These drawings accompany this Amendment.
T4820D
T4820L
T4820B
T4820F
4376PLT-12
4376PLT-45
4376PLT-8
4376PLT-17
4376PLT-18
4376PLT-29
4376PLT-24
T4268
3788-2
3788-3
3777-3
3775-8
3790-2
3787-4
3786-7
3775-6
3777-1
3789-6
4392 4593
T6008
T559
T536
5147 5146
WH-113
T4232
1991640
T1404
GIS ID:4770
T4235
3976P
T4820I
1791 4601
4205 4206
4376PLT-44
4376PLT-43
4376PLT-6
4376PLT-35
4376PLT-10
4376PLT-37
4638-1
WH-3522
T6006
T6009
T6007 t561
4357-1
3774-11
3774-9
3773-1301
300 3772-3 3771-5
3771-8
3790-4
3790-1
4356-1
14093396
3570A
T4954
3726339
736 737
3776-4
3778-6 3781-2
3778-5
833 3779-4 3779-1
3780-5
340 735 738
3783-7 3782-83784-4 3782-9
3784-2 3782-10 3784-13785-10
3785-11
750746745
747744
867328
704703
5112 5114
319319-A
844324
819818
322 800 815817
804803
2728 3125
3083 3068
35523115
30883117
27222724
3140 3106
3137 3086
2933 2877
30913098
WH-1083097
2878 3089
4376PLT-9
4376PLT-2
4376PLT-47
4376PLT-46
17734110X
5096-21
5090-25091-8
5094-15 5094-13
5094-9
5093-5
5092-1
2876 3099
4376PLT-3
4376PLT-33
4376PLT-4
4376PLT-32
4376PLT-39
4376PLT-382572
T4236
T4998
T4997
3742 3673 1011 250
T4951
WH-11
T4231
3978145
4158147
153 4313 4312 1790
4470 1641
5098-31
5095-17
5097-12
5110-695108-63 5107-59
5106-57 5111-325109-265106-53
5106-51
5105-47
5103-41
5102-24 5101-20
5100-33 4955
T4855
WH-10
152-14
T4230
T558
42964201 4198
4200 4199
3542A
T6020
T6019 T6017
5104-45
T4952
RO
O
SE
VE
LT
B
O
UL
EV
AR
D
ACCESS ROAD
RAN
GE
ROAD
JE
FF
ER
SO
N D
RIV
E
ROOSEVELT BOULEVARD
R
IF
LE
R
AN
G
E R
O
AD
D U
FF
Y
R O
AD
ACCESS ROAD
MARINE CORPS AIR STATION
CHERRY POINT, NORTH CAROLINA
UPGRADE MULTIPLE LIFT STATIONS
WO# 7328490
RIVER
New Bern
Dover
Tuscarora KinstonUS 70
NEUSE
Pollocksville
Trenton Seven Springs
Otway
Beaufort
US 70
Morehead City
N
E O
C A
MaysvilleComfort
US 17
Verona
Folkstone
Dixon
Holly Ridge
NEW RIVER
Pink
Beulaville
Hill
US 117
US 421
Wallace
Jacksonville
Richlands
I T
C
A N
US
Hampstead
T L
Scott Hill
A
Burgaw
Leland Wilmington
Havelock
Swansboro
VICINITY MAP - MCAS CHERRY POINT, N.C.
Words Corner
C O
V E
R S
H E
E T
A N
D
IN
D E
X
12882470
G-001
US 74 & 76
8 TYLER DRIVE
LIFT STATION
4318 LIFT
STATION
4228 LIFT
STATION
4398 LIFT
STATION
4638 LIFT
STATION
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
C
OM
MA
ND
M
ID
AT
LA
NT
IC
UP
GR
AD
E
MU
LT
IP
LE
LI
FT
S
TA
TI
ON
S
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com
N.C. LICENSE # C-1621
FINAL - 09-29-2023
SUPPORT TRA INING
MCAS CHERRY POINT, NC
FINAL DESIGN
INDEX OF DRAWINGS
GENERAL
SHEET NAME NAVFAC DRAWING NO. PAGE SHEET DESCRIPTION
G-001 12882470 1 COVER SHEET & INDEX
G-002 12882471 2 GENERAL NOTES
EXISTING CONDITIONS
SHEET NAME NAVFAC DRAWING NO. PAGE SHEET DESCRIPTION
VF100 12882472 3 CIVIL EXISTING CONDITIONS PLAN
CIVIL
SHEET NAME NAVFAC DRAWING NO. PAGE SHEET DESCRIPTION
C-001 12882473 4 CIVIL GENERAL NOTES, LEGENDS, & ABBREVIATIONS
CD100 12882474 5 CIVIL DEMOLITION PLAN
CU100 12882475 6 CIVIL UTILITY PLAN
C-500 12882476 7 CIVIL DETAILS
ELECTRICAL
SHEET NAME NAVFAC DRAWING NO. PAGE SHEET DESCRIPTION
E-001 12882477 8 ELECTRICAL ABBREVIATIONS, LEGEND, DETAILS
E-002 12882478 9 ELECTRICAL SELECTIVE DEMOLITION AND GENERAL NOTES
ED101 12882479 10 ELECTRICAL POWER DEMOLITION PLAN
EP101 12882480 11 ELECTRICAL POWER PLAN
7328490
10/23/2023
B4228 7388857
7388857
CONSTRUCTION NOTES
CONTRACTOR MUST PROVIDE BYPASS PUMPING OR PORTABLE
TOILET(S) FOR OCCUPANTS' USE AT THIS SITE. IF PORTABLE
TOILET(S) ARE PROVIDED, MAXIMUM OUTAGE AT SITE MUST NOT
EXCEED THREE (3) DAYS.
INCLUDE HAND SANITIZER IN PORTABLE TOILET(S).
B
ID
A M
E N
D M
E N
T
/2 7/
C
IV
IL
D
E
TA
IL
S
12882476
C-500
NA
VA
L F
AC
ILI
TI
ES
E
NG
IN
EE
RI
NG
C
OM
MA
ND
M
ID
AT
LA
NT
IC
UP
GR
AD
E
MU
LT
IP
LE
LI
FT
S
TA
TI
ON
S
151 Poole Rd. Suite 100 | Leland, NC, 28451
TEL (910) 383-1044 | FAX (910) 383-1045
www.capefearengineering.com
N.C. LICENSE # C-1621
FINAL - 09-29-2023
SUPPORT TRA INING
MCAS CHERRY POINT, NC
SITE AREA DESCRIPTION
PERIMETER DIKES, SWALES, DITCHES
AND SLOPES
HIGH QUALITY WATER (HQW) ZONES
SLOPES STEEPER THAN 3:1
SLOPES 3:1 OR FLATTER
ALL OTHER AREAS WITH SLOPES
FLATTER THAN 4:1
STABILIZATION
7 DAYS
7 DAYS
7 DAYS
14 DAYS
14 DAYS
NONE
NONE
IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED
7 DAYS FOR SLOPES GREATER
THAN 50' IN LENGTH.
NONE, EXCEPT FOR PERIMETERS AND HQW
ZONES
TIMEFRAME EXCEPTIONS
NEW STABILIZATION TIMEFRAMES
STABILIZATION SCHEDULE
NOT TO SCALE
PROVIDE SAND-BASED CENTIPEDE SOD (EREMOCHLOA OPHIUROIDES) FOR ALL TURF AREAS. SODDING SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH SECTION 6.12 OF THE NCDEQ EROSION CONTROL PLANNING AND DESIGN MANUAL AND PROJECT SPECIFICATIONS. SEE SHEET C-002 FOR ADDITIONAL SPECIFICATIONS AND MAINTENANCE CONSIDERATIONS.
TEMPORARY STABILIZATION
PERMANENT STABILIZATION
MAINTENANCE
NA
NOTES
FERTILIZATION/ FERTILIZATION/ACRE
UNWEATHERED; AVOID WEEDS
QUALITY
DRY, UNCHOPPED,
750 LBS. 10-10-10
SPREAD BY HAND OR MACHINE, MUST
BE TACKED DOWN.
SHOULD COME FROM WHEAT OR OATS2 TONS
AMOUNT/
ACRE
MATERIAL
STRAW
GRASS TYPE
RATE PER ACRE
ACRE
NADEC 1 - APR 15
SEEDING
TIME OF
GERMAN MILLET 40 LBS.
NA1,000 LBS. 10-10-10120 LBS.RYE (GRAIN) NAAUG 15-DEC 30
750 LBS. 10-10-10 NA NA
RYE (GRAIN) &
LESPEDEZA, KOBE
120 LBS. &
50 LBS.
APRIL 15-AUG 15
TEMPORARY SEEDING SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH SECTION 6.10 AND PERMANENT SEEDING SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH SECTION 6.11 OF THE NCDEQ EROSION CONTROL PLANNING AND DESIGN MANUAL. SODDING SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH SECTION 6.12 OF THE NCDEQ EROSION CONTROL
PLANNING AND DESIGN MANUAL AND PROJECT SPECIFICATIONS.
MULCHING MATERIALS AND APPLICATION RATES
TEMPORARY SEEDING
CLEANOUT/SERVICE
CONNECT TO BUILDING SEWER
(INSTALL FITTINGS AS REQUIRED)
CONNECT TO MAINS
(INSTALL FITTINGS
AS REQUIRED)
PLUG AT
END OF LINE
4" DIA PIPE
CAST IRON
CLEANOUT COVER
THREADED FITTING
4" REMOVABLE
THREADED PLUG
EXISTING GRADE
2' SQUARE X 4" THICK
CONCRETE SLAB (IF
NOT IN PAVEMENT)
NOT TO SCALE2
CONCRETE SIDEWALK/STOOP
NOTES:
1. EXPANSION, CONTRACTION AND CONSTRUCTION JOINTS SHALL BE INSTALLED PER PROJECT SPECIFICATIONS.
2. WHERE NEW SIDEWALK MEETS EXISTING SIDEWALKS, EXISTING PAVEMENTS, NEW PAVEMENTS AND BUILDINGS, CONTRACTOR SHALL INSTALL 6" THICKENED EDGES AND COMPRESSIBLE FILLER STRIPS AT ENDS WHERE ABUTS EXISTING
CONCRETE.
3. CONCRETE COMPRESSIVE STRENGTH SHALL BE PER SPECIFICATIONS.
HAND TOOLED 1/4" R
ALL EDGES
6"X6" W2.1X2.1 WWF-MESH
TO BE PROVIDED IN SHEETS
X X X X X X X X X X X X
SLOPE TO DRAIN (1/4"/FT)
COMPACTED SUBGRADE
4"
1"
(VARIES)
2"
LIFT STATION PUMP ELEVATION SCHEDULE
LIFT STATION
LOCATION/ID
"A"
ELEVATION
(VENT)
"B"
ELEVATION
(RIM)
"C" ELEVATION
(GROUND)
"D"
ELEVATION
(INVERT IN)
"E"
ELEVATION
(ALARM)
"F"
ELEVATION
(PUMP ON)
"G"
ELEVATION
(PUMP OFF)
"H"
ELEVATION
(BOTTOM)
8 TYLER DRIVE 21.25' 19.75' 19.25' ±16.14' 15.66' 15.16' 14.16' 12.16'
BLDG. 4398 26.50' 25.00' 24.50' ±18.0' 17.50' 17.00' 16.00' 14.00'
BLDG. 4318 21.50' 20.00' 19.50' ±18.40' 17.90' 17.40' 16.40' 14.40'
BLDG. 4228 19.00' 17.50' 17.00' ±13.10' 12.60' 12.10' 11.10' 9.10'
BLDG. 4638 27.50' 26.00' 25.50' ±21.30' 20.80' 20.30' 19.30' 17.30'
LIFT STATION PUMP ELECTRICAL SCHEDULE
LIFT
STATION
LOCATION/ID
VOLTAGE PHASE AMPERAGE SCADA NOTES
8 TYLER
DRIVE 240V SINGLE
20/2 AMP BREAKER
(2 HOTS, 1 GROUND) N/A N/A
BLDG. 4398 208V THREE
20/3 AMP BREAKER
(3 HOTS, 1 NEUTRAL, 1
GROUND)
TO REMAIN AND BE
PROTECTED DURING
DEMOLITION AND
CONSTRUCTION
CONTROLLER WILL REQUIRE A 120V
CONTROL TRANSFORMER PROVISION TO
POWER THE SCADA/ TELEMETRY CABINET.
THE EXISTING SCADA/ TELEMETRY RACK IS
TO REMAIN WITH 120V POWER TO BE
SOURCED FROM THE NEW CONTROLLER.
BLDG. 4318 208V SINGLE
20/2 AMP BREAKER
(2 HOTS,1 NEUTRAL, 1
GROUND)
TO REMAIN AND BE
PROTECTED DURING
DEMOLITION AND
CONSTRUCTION
CONTROLLER WILL REQUIRE A 120V
CONTROL TRANSFORMER PROVISION TO
POWER THE SCADA/ TELEMETRY CABINET.
THE EXISTING SCADA/ TELEMETRY RACK IS
MOUNTED TO THE BUILDING WALL AND IS
TO REMAIN WITH 120V POWER TO BE
SOURCED FROM THE NEW CONTROLLER.
BLDG. 4228 208V SINGLE
30/2 AMP BREAKER
(2 HOTS, 1 NEUTRAL, 1
GROUND)
CONTROLLER WILL REQUIRE A 120V
CONTROL TRANSFORMER PROVISION TO
POWER THE SCADA/ TELEMETRY CABINET.
THE EXISTING SCADA/ TELEMETRY RACK IS
TO REMAIN WITH 120V POWER TO BE
SOURCED FROM THE NEW CONTROLLER.
BLDG. 4638 208V THREE
15/3 AMP BREAKER
(3 HOTS, 1 GROUND)
TO REMAIN AND BE
PROTECTED DURING
DEMOLITION AND
CONSTRUCTION
CONTROLLER WILL REQUIRE A 120V
CONTROL TRANSFORMER PROVISION TO
POWER THE SCADA/ TELEMETRY CABINET.
THE EXISTING SCADA/ TELEMETRY RACK IS
TO REMAIN WITH 120V POWER TO BE
SOURCED FROM THE NEW CONTROLLER.
73284907388857
ITEM DESCRIPTION
1. FIBERGLASS BASIN, 48"x72" WITH FIBERGLASS ANTI-FLOAT 5/8" 304
SS SIMPLEX MOUNTING STUDS
2. ALUMINUM ACCESS COVER WITH STAINLESS STEEL CYLINDER
LOCK PER PROJECT SPECIFICATIONS
3. 2" NPT GLASS FILLED PLASTIC ELECTRICAL COUPLING FLANGE
ASSEMBLY WITH GASKET KIT
4. GUIDE RAIL BASE ASSEMBLY
5. 2" SCH. 40 TYPE 304 SS GUIDE RAILS
6. 2" SCH. 80 PVC DISCHARGE PIPE (TYPICAL)
7. 2"NPT BRASS FLAPPER CHECK VALVE (THREADED)
8. 2" SCH. 80 PVC TRUE UNION BALL VALVE
9. 2" SCH. 80 PVC ELBOWS (2)
10. 1/4" 316 STAINLESS STEEL LIFTING CHAIN WITH 5/16" SS SHACKLE
11. 316 SS SIX HOOK CABLE HOLDER FLOAT BRACKET
12. 316 SS UPPER GUIDE WITH ALUMINUM SUPPORT GUIDE
13. 4" FLEXIBLE INLET HUB
14. VALVE BOX - HDPE 24"x 18"x 18"
15. DISCHARGE CONNECTION, 2" SCH. 80 PVC (SOLVENT WELD)
16. FLOAT SWITCHES
17. SIMPLEX SUBMERSIBLE GRINDER PUMP STATION PACKAGE
18. 2" 316 SS OR BRASS NIPPLE
19. 1 - 1/4" THREADED x PE SCH. 80 PVC NIPPLE
20. 1 - 1/4" x 2" REDUCING BUSHING SCH. 80 PVC
21. 2" IPT x HDPE ADAPTER
22. 2,500 PSI CONCRETE AROUND BASE TO PREVENT FLOTATION
DISCONNECT
WATER TIGHT
CONNECTION
VENT
CONTROL PANEL STAINLESS STEEL 3"Ø VENT
WITH INSECT SCREEN
#57 STONE
NOTES
1. CONTRACTOR IS TO PROVIDE A PACKAGED PUMP
STATION/CONTROL PANEL UNIT FROM A SINGLE
VENDOR AND SHALL BE CAPABLE OF HANDLING
DOMESTIC WASTE. ALL PUMP STATION EQUIPMENT AND
INSTALLATION SHALL BE IN ACCORDANCE OF THE MOST
RECENT N.C. STATE PLUMBING CODE.
2. PUMP STATION SHALL BE CAPABLE OF PUMPING 25 GPM
AT 48 FEET TDH. SEE LIFT STATION PUMP ELECTRICAL
SCHEDULE FOR PUMP STATION POWER REQUIREMENTS
(30-AMP STARTING APPROXIMATE).
3. PUMP STATION ELECTRICAL SUPPLY SHALL BE FED
FROM THE BUILDING'S PANEL. AS INDICATED ON THE
ELECTRICAL PLANS
4. PUMP STATION CONTROL PANEL SHALL SUPPLY POWER
TO ALARMS FROM A SEPARATE BREAKER THAN PUMP
MOTORS PER NC STATE PLUMBING CODE 712.3.4.1
5. PACKAGE GRINDER PUMP STATION BY THE FOLLOWING
MANUFACTURERS:
FLYGT, MYERS, BARNES, E-ONE, OR APPROVED EQUAL
#57 STONE
℄ DISCHARGE
℄ BASIN
18"
24"
12"
MIN. RUNTIME
W/NO FLOW
1 MINUTE
36" MIN.
BY
ENGINEER
6"
FL
O
W
10 15
7 18 8
18"
6"6"
"H" MSL
BOTTOM
BASIN
"A" MSL
OR HIGHER
"B" MSL
TOP STATION
"C" MSL
FINISH GRADE
6"
"E" W. W. ALARM ON
"G" MSL
PUMP OFF
4" MIN.
24'
"F" MSL
PUMP ON
48" 36"36"
12"
12"
2,500 PSI CONCRETE
6"
NOT TO SCALE
SIMPLEX PACKAGED GRINDER PUMP STATION
FINISH GRADE
"D" INVERT IN
EXISTING SCADA TO REMAIN
AND BE PROTECTED DURING
DEMOLITION AND
CONSTRUCTION. NEW PUMP
STATION TO BE CONNECTED
TO EXISTING SCADA SYSTEM.
B
ID
A M
E N
D M
E N
T
/2 7/
(MINIMUM SIZE)
File details come from the government source that posted it. Updated .