This document is an Amendment to a solicitation for Provide Prohibited/Restricted Signs at Range and Training Areas BT11 & BT09 at the Marine Corps Air Station Cherry Point, North Carolina. The amendment provides responses to pre-award Requests for Information (RFIs) submitted by prospective offerors. The RFI responses address questions about sign panel specifications, solar powered lights, unexploded ordnance (UXO) survey requirements, laydown areas, boat launch access, and other logistical details. The solicitation remains open with a proposal due date of July 30, 2024 at 12:00 PM local time. This procurement is restricted to the General MACC contractors listed on the original RFP cover letter. The contracting agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 0005.pdf | ||
| AMENDMENT 0004.pdf | ||
| AMENDMENT 0003.pdf | ||
| AMENDMENT 0002.pdf | ||
| AMENDMENT 0001.pdf | ||
| 7328487 DwgsAsOne - SIGNED.pdf | ||
| RFP 7328487.pdf | ||
| 7328487 SpecsAsOne - SIGNED.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC
SPECIFICATION
7328487 Provide Prohibited/ Restricted Signs at
Range and Training Areas BT11 & BT09
MCAS Cherry Point, NC AMENDMENT
#0006
IMPORTANT
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.
If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0006 7/26/2024 7328487
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
CG MCAS Cherry Point
FACILITIES, ROICC
B-163, CURTIS ROAD
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION Provide Prohibited/Restricted Signs at Range and Training Areas BT11 & BT09
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7328487 Provide Prohibited/Restricted Signs at Range and Training Areas BT11 & BT09, Marine Corps Air Station Cherry
Point, NC
Amendment 0006 is being issued to respond to pre-award RFI.
The deadline to submit pre-award RFI’s HAS PASSED. No further RFI will be answered.
The proposal due date of 30 July 2024 at 12:00 PM local time REMAINS unchanged.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
Amendment 0006 7328487 Provide Prohibited/Restricted Signs at Range and Training Areas BT11 & BT09
RFI Responses:
1. When we supply Highway and Interstate sign panels there are appropriate pre-punched holes on the blanks for mounting that are then overlayed with the sheeting. However, field drilling is still utilized by the installers per their needs. Note 2.2 Flat Aluminum Side Panels States, "Aluminum sign panels must conform to ASTM B209, alloy-temper 6061-T6 or 5052-H38. The blanks must be free from laminations, blisters, open seams, pits, holes, other defects that may affect their appearance or use. The thickness must be uniform and the blank commercially flat.
Can holes be drilled in the field for installation purposes?
Response:
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
2. When we supply standard interstate/highway signs MUTCD the aluminum blank is .080” thick.
The note in document 7328487+DwgAsOne calls out .1285” min thickness. We can have blanks cut in this thickness but would not have pre-punched holes. Would 0.80" thickness be acceptable?
3. Could the government provide detail or specifications for the solar powered light?
NOTE – Government does not have this information available.
4. When will the UXO Technician conduct a subsurface survey?
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
NOTE – The contractor is responsible for hiring the UXO and scheduling their work. Refer to Specification 01 14 00, Part 1.2.
5. Will the subsurface survey be provided to bidding contractors so costs can be properly qualified?
Response:
Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.
6. Will the UXO's time be billed to the contractor for this project? If so, could the UXO's contact information be provided and an extension in bid time be granted to coordinate bid efforts.
Response:
NOTE – The contractor is responsible for hiring the UXO.
Amendment 0006 7328487 Provide Prohibited/Restricted Signs at Range and Training Areas BT11 & BT09
7. Will there be a lay down area available and designated area for a job-site trailer?
8. Where are the boat launch areas to be utilized for this work?
NOTE – Refer to Specification 01 14 00, Part 1.4.3.
9. Will the Thorofare Bridge parking area and dock be available for us to use?
NOTE – Refer to Specification 01 14 00, Part 1.4.3.
10. Will jetting of land post be allowed in areas not accessible by barge or equipment?
See RFI 3 Responses.
11. Clarification- Sheet C-403 detail 7 refers to #5 signs to be mounted on new landward mounted post at BT-9, but there is no land at BT-9.
12. Will test pilings be required for waterward pling if the depth of water is known at the location of waterward pilings to be installed at BT-9? Spec say provide and drive 6 test piles 5' longer than required, but only 3 waterward pilings are required for this project. This would be treated as a separate project in itself with its own mobilization and demobilization to be done prior to the actual project and will carry a significant cost.
13. Are test pilings required for the 6 x 6 landward post when the embedment is specified to 6'?
| AMENDMENT 0006 |
| AMENDMENT 0005 |
| AMENDMENT 0004 |
| AMENDMENT 0003 |
| Amend Cover |
| Amendment Page 2 |
RFI 4 Responses
File details come from the government source that posted it. Updated .