7318448 Amendment 0002.pdf

PDF 291 KB Posted

Attached to
Replace Carpet Offices, VMGR252, Building 4305
Solicitation number
N400857318448
Issued by

About this file

Amendment of Solicitation Summary

This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by CG MCAS Cherry Point Facilities, ROICC for solicitation 7318448 regarding carpet replacement in offices at VMGR252, Building 4305, Marine Corps Air Station Cherry Point, NC. Amendment 0002, effective September 9, 2026, extends the proposal due date from September 8, 2026 at 12:00 PM to September 11, 2026 at 1:00 PM. The amendment also indicates that the deadline for submitting pre-award Requests for Information (RFI) has passed. The government acknowledges that proposals may have already been submitted under the original deadline and requests that contractors either resubmit new proposed pricing or confirm in writing that their original proposal remains valid.

The Pre-Award Inquiry Form documents eight RFIs submitted between August 19 and August 31, 2026, with government responses posted in Amendment 0002. Key clarifications include: the estimated project magnitude is less than $25,000.00; cove base replacement will be on an as-needed basis due to unknown floor conditions; substrate preparation requires scraping or mechanically grinding residual adhesive and filling cracks and spalls with high-strength cementitious underlayment; Room 107 requires tile flooring removal with the same substrate preparation standards; bidders should bid per specifications as written regarding hazardous materials; and work must be performed during off-hours (nights/weekends) with rooms ready for occupant reoccupancy the following day due to space constraints.

View the file

Other files

File Type Posted
7318448 Amendment 0001.pdf PDF
7318448 Master PPI Form.xlsx XLSX spreadsheet
7318448 SOW.pdf PDF
7318448 RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0002 09/09/2026 7318448

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

CG MCAS Cherry Point

FACILITIES, ROICC

B-87, 748 Roosevelt Blvd.

PSC BOX 8006

CHERRY POINT, NC 28533

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION

Replace Carpet Offices, VMGR252, Building

9B. DATED (SEE ITEM 11)

AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

7318448 Replace Carpet Offices, VMGR252, Building 4305 Marine Corps Air Station Cherry Point, NC

Amendment 0002 is being issued to answer pre-award RFI’s and extend the proposal due date.

The deadline to submit pre-award RFI’s HAS PASSED.

The proposal due date of 08 September 2026 at 12:00PM HAS BEEN CHANGED to 11 September 2026 at 1:00PM.

The Government understands proposals have already been submitted per the original proposal due date. Please either resubmit new proposed price OR confirm original proposal is still valid in writing.

See Attached.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

PREAWARD INQUIRY FORM

PAGE SECTION PARAGRAPH

1 8/19/2026 Do you realize this project is scheduled to be due on Labor

Day?

Apologize -- did not realize when creating the solicitation. New proposal due date updated via amendment 0001.

2 8/19/2026 Please provide the Government's estimated cost range for this project. This information is requested to determine whether a bid bond will be required and to allow our surety to evaluate the appropriate bonding limits, as the estimated cost range is required for their review. Providing this information in advance will help avoid the unnecessary risk associated with requesting a bid bond on the day of bid submission and ensure sufficient time for the surety to issue the bond, allowing us to comply with the solicitation's Bond Requirements, which require the bid bond to be submitted with the proposal.

The government's estimated magnitude for this project is less $25,000.00.

3 8/31/2026 1&6 1.3 & 1.5.5 1.3 & 1.5.5 Identify the exact division of responsibility between the Government / occupants and the contractor for furniture removal, temporary relocation, protection, and reinstallation / reset in each affected room.

The KTR shall coordinate with the COR to have BLDG occupants temporarily relocate furniture. Already stated in section 1.3 paragraph 3.

4 8/31/2026 1&2 1.3 1.3 Provide the intended quantity / locations of cove base replacement or state the pricing basis bidders should use for cove base work associated with this project.

Cove base will be on an as needed basis due to unknown conditions during floor replacement.

5 8/31/2026 1 1.3 1.3 Define the required substrate preperation standard and state whether moisture testing, adhesive removal, floor patch/leveling, or other remediation is included, excluded, or to be addressed by unit pricing / allowance.

Scrape or mechanically grind down residual adhesive to a smooth, thin, well-bonded film or bare concrete.

Fill cracks, spalls, and low spots using a high-strength, cementitious underlayment/patch.

6 8/31/2026 1 1.3 1.3 Provide the intended demolition and substrate preparation for requirements for Room 107.

Remove and dispose of tile flooring, substrate prep os the same a question 5.

7 8/31/2026 1 1.3 1.3 Provide any available hazardous material surveys and identify the responsible party for abatement should hazardous materials be encountered.

Bid per the specs as written. 0002

POSTED ON

AMENDMENT #PPI # REFERENCE QUESTION GOVERNMENT RESPONSEDATE

SUBMITTED

July 2011

PREAWARD INQUIRY FORM

PAGE SECTION PARAGRAPH

AMENDMENT #PPI # QUESTION GOVERNMENT RESPONSE

SUBMITTED

8 8/31/2026 2 1.4 Provide required phasing and sequencing requirements for bidding purposes.

Work will need to performed after normal working hours, nights/ weekends. The occupants of the building will need advanced notice as to what rooms will need to be emptied of furniture and equipment prior to work being performed, the rooms will have to be ready for the occupants to move back in the following day due to space constraints.

July 2011