Amendment 0004.pdf

PDF 611 KB Posted

Attached to
Replace Pool Liner Combat Training Pool B289
Solicitation number
N400857064317
Issued by

View the file

Other files

File Type Posted
7064317 Amendment 0005.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
7064317 DrawingsAsOne.pdf PDF
RFP 7064317 B289 Replace Pool Liner Combat Training Pool.pdf PDF
7064317 SpecsAsOne.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC

SPECIFICATIO N

7064317

B289 Replace Pool Liner

Combat Training Pool

MCAS Cherry Point, NC

AMENDMENT #0004

IMPORTANT

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.

If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0004 02/11/2021 7064317

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

CG MCAS Cherry Point

FACILITIES, ROICC

B-163, CURTIS ROAD

PSC BOX 8006

CHERRY POINT, NC 28533

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION

B289 Replace Pool Liner Combat Training Pool

9B. DATED (SEE ITEM 11)

AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

7064317 B289 Replace Pool Liner Combat Training Pool, Marine Corps Air Station Cherry Point, NC

This amendment is being issued to respond to pre-award RFIs and change the CCD to a HARD COMPLETION DATE

OF 02 AUGUST 2021.

The deadline to submit pre-award RFIs remains 11 February 2021 has passed. No further RFIs will be accepted.

The proposal due date of 23 February 2021 at 1200 local times remains UNCHANGED.

See Attached.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

Amendment 0004 7064317 - B289 Replace Pool Liner Combat Training Pool

RFI Responses:

6. Are we required to comply to Executive Order 14005?

Response:

Submit Proposals in accordance with RFP, Specifications, Drawings, and all Amendments and applicable regulations.

7. The existing gutter dropout covers are stainless steel and separate from the termination flange of the liner. We have been unable to source those in stainless steel, however, they can manufacture the covers with the flange as a single unit. This will result in a fitting less likely to leak. Is this acceptable? Section 07 13 53, Part 2, 2.1 Materials, 2.2.4 Accessories

Response:

Submit Proposals in accordance with RFP, Specifications, Drawings, and all Amendments.

8. The existing main drain covers are 24" x 24" Aquastar pvc covers. To comply with national, state and local code, we request that the replacement covers be new model of Aquastar 24" x 24" pvc covers?

Response:

Submit Proposals in accordance with RFP, Specifications, Drawings, and all Amendments.

9. The existing ladders have a welded plate for attachment to the deck. This is highly unusual and will require onsite fabrication of the new ladders. Can we core drill for new 4" brass anchors to install new ladders as is standard?

Response:

Submit Proposals in accordance with RFP, Specifications, Drawings, and all Amendments.

10. Will we have access to the pool through the side bay (roll-up) doors?

Response:

Yes, Submit Proposals in accordance with RFP, Specifications, Drawings, and all Amendments.

12825943 REV2.pdf
Sheets and Views
A-501

File details come from the government source that posted it. Updated .