Amendment 0001.pdf
PDF 729 KB Posted
- Attached to
- B129 Replace Roof and Apply Masonry Sealer Federal contract opportunity
- Solicitation number
- N400857017663
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| 7017663 DrawingsAsOne.pdf | ||
| RFP 7017663 B129 Replace Roof_Masonry Sealer.docx | DOCX document | |
| 7017663 Specs as One.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC
SPECIFICATION
7017663
B-129 Replace Roof and
Apply Masonry Sealer
MCAS Cherry Point, NC
AMENDMENT #0001
IMPORTANT
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.
If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 01/30/2020 7017663
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
CG MCAS Cherry Point
FACILITIES, ROICC
B-163, CURTIS ROAD
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
B-129 Replace Roof and Apply Masonry Sealer
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WO 7017663 B-129 Replace Roof and Apply Masonry Sealer, Marine Corps Air Station Cherry Point, NC
This amendment is being issued to provide updated specifications for sealer application.
The deadline to submit pre-award RFIs is hereby extended to 06 August 2020 by 0900.
The proposal due date of 13 August 2020 at 1200 local times remains UNCHANGED.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
CONTINUATION SHEET
PROJECT TABLE OF CONTENTS
SECTION 07 52 00, MODIFIED BITUMINOUS MEMBRANE ROOFING is deleted and
07 52 00, MODIFIED BITUMINOUS MEMBRANE ROOFING, dated 30 JUL 2020, as shown in the footer, is added to the Project Table of Contents and accompanies this Amendment.
WO #7017663 Replace Roof & Apply Masonry Sealer, B129
SECTION 07 52 00
MODIFIED BITUMINOUS MEMBRANE ROOFING
05/12
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP A10.24 (2014) Roofing - Safety Requirements of Low-Sloped Roofs
ASPHALT ROOFING MANUFACTURER'S ASSOCIATION (ARMA)
ARMA 410BUR88 (2001) Manual of Roof Maintenance and Repair
ARMA PMBRG98 (1998) Quality Control Guideline for the Application of Polymer Modified Bitumen Roofing
ASTM INTERNATIONAL (ASTM)
ASTM D41/D41M (2011; R 2016) Standard Specification for Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing
ASTM D4586/D4586M (2007; E 2012; R 2012) Asphalt Roof Cement, Asbestos-Free
ASTM E108 (2011) Fire Tests of Roof Coverings
FM GLOBAL (FM)
FM 4470 (2010) Single-Ply, Polymer-Modified Bitumen Sheet, Built-up Roof (BUR), and Liquid Applied Roof Assemblies for Use in Class 1 and Noncombustible Roof Deck Construction
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)
NRCA C3701 (1997) Repair Manual for Low Slope
SECTION 07 52 00 Page 1
30 JUL 2020
Membrane Roof Systems
NRCA CONDET (2014) Construction Details Manual
NRCA RoofMan (2017) The NRCA Roofing Manual
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1793 (2012) Architectural Sheet Metal Manual, 7th Edition
SINGLE PLY ROOFING INDUSTRY (SPRI)
ANSI/SPRI/FM 4435/ES-1 (2017) Test Standard for Edge Systems Used with Low Slope Roofing Systems
UNDERWRITERS LABORATORIES (UL)
UL 790 (2004; Reprint Jul 2014) Standard Test Methods for Fire Tests of Roof Coverings
UL RMSD (2012) Roofing Materials and Systems Directory
1.2 DESCRIPTION OF ROOF MEMBRANE SYSTEMS
OVER STEEL DECK: Minimum two-ply SBS modified bitumen roof membrane consisting of modified bitumen base sheet and cap sheet. Modified bitumen roof membrane base ply must be mechanically-fastened and cap ply must be set in cold-applied adhesive.
All work must follow the NRCA RoofMan guidelines and standards stated within this Section.
SBS-modified bitumen membrane with non-woven polyester reinforcement, Mechanically fastened in 4 in (minimum) cold applied side-laps. Base ply for cold-applied cap sheet applications meets or exceeds ASTM D6164, Type I, Grade S, per ASTM D5147 test methods:
BASE PLY, MECHANICALLY FASTENED:(OVER STEEL DECK)
i. Thickness: 110 mils (2.8 mm)
ii. Width: 39.4 in (1 m)
iii. Length: 32.8 ft (10 m)
iv. Roll weight: 74 lb (33.6 kg)
v. Net mass per unit area, lb/100 sq ft (g/sq m): a) 68 lb (3341 g)
vi. Peak load @ 0 F (-18 C), lbf/in (kN/m).
a) MD 115 lbf/in (20.1 kN/m), XMD 90 lbf/in (15.8 kN/m)
vii. Elongation at peak load @ 0 F (-18 C), lbf/in (kN/m):
a) MD 35%, XMD 40%
SECTION 07 52 00 Page 2
viii. Peak load @ 73.4 F (23 C), lbf/in (kN/m):
a) MD 85 lbf/in (14.9 kN/m), XMD 65 lbf/in (11.4 kN/m)
ix. Elongation at peak load @ 73.4 F (23 C), lbf/in (kN/m):
a) MD 55%, XMD 60%
x. Ultimate Elongation @ 73.4 F (23 C), lbf/in (kN/m):
a) MD 65%, XMD 80%
xi. Tear Strength @ 73.4 F (23 C), lbf (N):
a) MD 125 lbf (556 N), XMD 85 lbf (378 N)
xii. Low temperature flexibility, F ( C):
a) MD/XMD: -15 F (-26 C)
xiii. Dimensional stability, %:
a) MD/XMD: Less than 0.5%
xiv. Compound stability, F ( C):
a) MD/XMD: 240 F (116 C)
FLASHING BASE PLY, COLD-APPLIED:(OVER STEEL DECK AND CONCRETE DECK)
SBS-modified bitumen membrane with sanded top and bottom surfaces. Non-woven polyester reinforcement. Meets or exceeds ASTM D6164, Type I, Grade S, per ASTM D5147 test methods:
i. Thickness: 118 mils (3.0 mm)
ii. Width: 39.4 in (1 m)
iii. Length: 32.8 ft (10 m)
iv. Roll weight: 84 lb (38.1 kg)
v. Net mass per unit area, lb/100 sq ft (g/sq m): a) 78 lb (3808 g)
vi. Peak load @ 0 F (-18 C), lbf/in (kN/m).
a) MD 115 lbf/in (20.1 kN/m), XMD 90 lbf/in (15.8 kN/m)
vii. Elongation at peak load @ 0 F (-18 C), lbf/in (kN/m):
a) MD 35%, XMD 40%
viii. Peak load @ 73.4 F (23 C), lbf/in (kN/m):
a) MD 85 lbf/in (14.9 kN/m), XMD 65 lbf/in (11.4 kN/m)
ix. Elongation at peak load @ 73.4 F (23 C), lbf/in (kN/m):
a) MD 55%, XMD 60%
x. Ultimate Elongation @ 73.4 F (23 C), lbf/in (kN/m):
a) MD 65%, XMD 80%
xi. Tear Strength @ 73.4 F (23 C), lbf (N):
a) MD 125 lbf (556 N), XMD 85 lbf (378 N)
xii. Low temperature flexibility, F ( C):
a) MD/XMD: -15 F (-26 C)
SECTION 07 52 00 Page 3
xiii. Dimensional stability, %:
a) MD/XMD: Less than 0.5%
xiv. Compound stability, F ( C):
a) MD/XMD: 240 F (116 C)
CAP SHEET (FIELD AND FLASHING), COLD-APPLIED:(OVER STEEL DECK AND CONCRETE
DECK)
SBS-modified bitumen membrane Cap Sheet with a sanded bottom surface and mineral granule top surface. Non-woven polyester reinforced. UL Class A for specified roof slope requirements. Meets or exceeds ASTM D6164, Type I, Grade G, per ASTM D5147 test methods:
i. Thickness: 157 mils (4.0 mm)
ii. Width: 39.4 in (1 m)
iii. Length: 32.8 ft (10 m)
iv. Roll weight: 117 lb (53.5 kg)
v. Net mass per unit area, lb/100 sq ft (g/sq m):
a) 109 lb (5322 g)
vi. Peak load @ 0 F (-18 C), lbf/in (kN/m).
a) MD 115 lbf/in (20.1 kN/m), XMD 90 lbf/in (15.8 kN/m)
vii. Elongation at peak load @ 0 F (-18 C), lbf/in (kN/m):
a) MD 35%, XMD 40%
viii. Peak load @ 73.4 F (23 C), lbf/in (kN/m):
a) MD 85 lbf/in (14.9 kN/m), XMD 65 lbf/in (11.4 kN/m)
ix. Elongation at peak load @ 73.4 F (23 C), lbf/in (kN/m):
a) MD 55%, XMD 60%
x. Ultimate Elongation @ 73.4 F (23 C), lbf/in (kN/m):
a) MD 65%, XMD 80%
xi. Tear Strength @ 73.4 F (23 C), lbf (N):
a) MD 125 lbf (556 N), XMD 85 lbf (378 N)
xii. Low temperature flexibility, F ( C):
a) MD/XMD: -15 F (-26 C)
xiii. Dimensional stability, %:
a) MD/XMD: Less than 0.5%
xiv. Compound stability, F ( C):
a) MD/XMD: 240 F (116 C)
xv. Granule Surfacing:
a) White mineral granules.
OVER LIGHT WEIGHT CONCRETE DECK: Minimum two-ply SBS modified bitumen roof membrane consisting of modified bitumen base sheet and cap sheet. Modified
SECTION 07 52 00 Page 4 bitumen roof membrane must be cold applied.
BASE PLY, COLD APPLIED:(OVER CONCRETE DECK)
SBS-modified bitumen membrane with sanded top and bottom surfaces. Non-woven polyester reinforcement. Meets or exceeds ASTM D6164, Type I, Grade S, per ASTM D5147 test methods:
i. Thickness: 118 mils (3.0 mm)
ii. Width: 39.4 in (1 m)
iii. Length: 32.8 ft (10 m)
iv. Roll weight: 84 lb (38.1 kg)
v. Net mass per unit area, lb/100 sq ft (g/sq m): a) 78 lb (3808 g)
vi. Peak load @ 0 F (-18 C), lbf/in (kN/m).
a) MD 115 lbf/in (20.1 kN/m), XMD 90 lbf/in (15.8 kN/m)
vii. Elongation at peak load @ 0 F (-18 C), lbf/in (kN/m):
a) MD 35%, XMD 40%
viii. Peak load @ 73.4 F (23 C), lbf/in (kN/m):
a) MD 85 lbf/in (14.9 kN/m), XMD 65 lbf/in (11.4 kN/m)
ix. Elongation at peak load @ 73.4 F (23 C), lbf/in (kN/m):
a) MD 55%, XMD 60%
x. Ultimate Elongation @ 73.4 F (23 C), lbf/in (kN/m):
a) MD 65%, XMD 80%
xi. Tear Strength @ 73.4 F (23 C), lbf (N):
a) MD 125 lbf (556 N), XMD 85 lbf (378 N)
xii. Low temperature flexibility, F ( C):
a) MD/XMD: -15 F (-26 C)
xiii. Dimensional stability, %:
a) MD/XMD: Less than 0.5%
xiv. Compound stability, F ( C):
a) MD/XMD: 240 F (116 C)
(FOR FIELD AND FLASHING AND CAP SHEET, SEE ABOVE)
All work must follow the NRCA RoofMan guidelines and standards stated within this Section.
1.3 SUBMITTALS
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Roof Plan
SECTION 07 52 00 Page 5
SD-03 Product Data
Modified Bitumen Sheets
Fiberglass Felt
Primer
Modified Bitumen Roof Cement
Pre-Manufactured Accessories
Fasteners And Plates
Sample Warranty certificate
Submit all data required by Section 07 22 00 ROOF AND DECK INSULATION, together with requirements of this section. Include in data written acceptance by the roof membrane manufacturer of the products and accessories provided. Provide oroducts as listed in the applicable wind uplift and fire rating classification listings, unless approved otherwise by the Contracting Officer.
SD-05 Design Data
Wind Uplift Calculations
SD-07 Certificates
Provide evidence that products used within this specification are manufactured in the United States.
Qualification of Manufacturer
Certify that the manufacturer of the modified bitumen membrane meets requirements specified under paragraph QUALIFICATION OF
MANUFACTURER.
Qualification of Applicator
Certify that the applicator meets requirements specified under paragraph QUALIFICATION OF APPLICATOR.
Qualification of Engineer of Record
Certify that the Engineer of Record is fully qualified, competent, and currently licensed to practice in the project jurisdiction.
Wind Uplift Resistance classification, as applicable
Fire Resistance classification
Submit the roof system assembly wind uplift and fire rating classification listings.
SD-08 Manufacturer's Instructions
Modified Bitumen Membrane Application
SECTION 07 52 00 Page 6
Flashing
Base Sheet attachment, including pattern and frequency of mechanical attachments required in field of roof, corners, and perimeters to provide for the specified wind resistance.
Fasteners
Cold Weather Installation
Include detailed application instructions and standard manufacturer drawings altered as required by these specifications.
Explicitly identify in writing, differences between manufacturer's instructions and the specified requirements.
SD-11 Closeout Submittals
Warranty
Information Card
Instructions To Government Personnel
Include copies of Safety Data Sheets for maintenance/repair materials.
Submit 20 year "No-Dollar-Limit" warranty for labor and materials.
1.4 QUALITY ASSURANCE
1.4.1 Qualification of Manufacturer
Modified bitumen sheet roofing system manufacturer must have a minimum of 5 years experience in manufacturing modified bitumen roofing products.
1.4.2 Qualification of Applicator
Roofing system applicator must be approved, authorized, or licensed in writing by the modified bitumen sheet roofing system manufacturer and have a minimum of three years experience as an approved, authorized, or licensed applicator with that manufacturer and be approved at a level capable of providing the specified warranty. The applicator must supply the names, locations and client contact information of five projects of similar size and scope that the applicator has constructed using the manufacturer's roofing products submitted for this project within the previous three years.
1.4.3 Qualification of Engineer of Record
Engineer of Record must be currently licensed within the jurisdiction of the project.
1.4.4 Fire Resistance
Complete roof covering assembly must:
a. Be Class A rated in accordance with ASTM E108, FM 4470, or UL 790 ; and
SECTION 07 52 00 Page 7
b. Be listed as part of Fire-Classified roof deck construction in UL RMSD, or Class I roof deck construction in FM APP GUIDE.
FM or UL approved components of the roof covering assembly must bear the appropriate FM or UL label.
1.4.5 Wind Uplift Resistance
Provide a complete roof system assembly that is rated and installed to resist wind loads calculated in accordance with ASCE 7-16 and validated by uplift resistance testing in accordance with Factory Mutual (FM) test procedures. Do not install non-rated systems, except as approved by the Contracting Officer. Submit licensed engineer's Wind uplift calculations and substantiating data to validate any non-rated roof system. Base wind uplift measurements on a design wind speed of 130 mph in accordance with ASCE 7-16 and other applicable building code requirements.
1.4.6 Preroofing Conference
After approval of submittals and before performing roofing and insulation system installation work, hold a preroofing conference to review the following:
a. Drawings, including Roof Plan, specifications and submittals related to the roof work
b. Roof system components installation
c. Procedure for the roof manufacturer's technical representative's onsite inspection and acceptance of the roof structure, and roofing substrate, the name of the manufacturer's technical representatives, the frequency of the onsite visits, distribution of copies of the inspection reports from the manufacturer's technical representatives to roof manufacturer
d. Contractor's plan for coordination of the work of the various trades involved in providing the roofing system and other components secured to the roofing
e. Quality control, (ARMA PMBRG98) plan for the roof system installation
f. Safety requirements
Coordinate preroofing conference scheduling with the Contracting Officer.
The conference must be attended by the Contractor, the Contracting Officer's designated personnel, and personnel directly responsible for the installation of roofing and insulation, flashing and sheet metal work, mechanical, other trades interfacing with the roof work, designated safety personnel trained to enforce and comply with ASSP A10.24 , and a representative of the roofing materials manufacturer. Before beginning roofing work, provide a copy of meeting notes and action items to all attending parties. Note action items requiring resolution prior to start of roof work.
SECTION 07 52 00 Page 8
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver materials in manufacturers' original unopened containers and rolls with labels intact and legible. Mark and remove wet or damaged materials from the site. Where materials are covered by a referenced specification, the container must bear the specification number, type, and class, as applicable. Deliver materials in sufficient quantity to allow work to proceed without interruption.
1.5.2 Storage
Protect materials against moisture absorption and contamination or other damage. Avoid crushing or crinkling of roll materials. Store roll materials on end on clean raised platforms or pallets one level high in dry locations with adequate ventilation, such as an enclosed building or closed trailer. Do not store roll materials in buildings under construction until concrete, mortar, and plaster work is finished and dry. Maintain roll materials at temperatures above 50 degrees F for 24 hours immediately before application. Do not store materials outdoors unless approved by the Contracting Officer. Completely cover felts stored outdoors, on and off roof, with waterproof canvas protective covering. Do not use polyethylene sheet as a covering. Tie covering securely to pallets to make completely weatherproof. Provide sufficient ventilation to prevent condensation. Do not store more materials on roof than can be installed the same day and remove unused materials at end of each days work. Distribute materials temporarily stored on roof to stay within live load limits of the roof construction.
Maintain a minimum distance of 35 foot for all stored flammable materials, including materials covered with shrink wraps, craft paper or tarps from all torch/welding applications.
Immediately remove wet, contaminated or otherwise damaged or unsuitable materials from the site. Damaged materials may be marked by the Contracting Officer.
1.5.3 Handling
Prevent damage to edges and ends of roll materials. Do not install damaged materials in the work. Select and operate material handling equipment to prevent damage to materials or applied roofing.
1.6 ENVIRONMENTAL REQUIREMENTS
Do not install roofing system when air temperature is below 40 degrees F, during any form of precipitation, including fog, or when there is ice, frost, moisture, or any other visible dampness on the roof deck. Follow manufacturer's printed instructions for Cold Weather Installation.
1.7 SEQUENCING
Coordinate the work with other trades to ensure that components which are to be secured to or stripped into the roofing system are available and that permanent flashing and counter flashing, per NRCA CONDET, and are installed as the work progresses. Ensure temporary protection measures are in place to preclude moisture intrusion or damage to installed materials. Apply roofing immediately following application of insulation
SECTION 07 52 00 Page 9 as a continuous operation. Coordinate roofing operations with insulation work so that all roof insulation applied each day is covered with roof membrane installation the same day.
1.8 WARRANTY
Provide roof system material and workmanship warranties meeting specified requirements. Provide revision or amendment to standard membrane manufacturer warranty as required to comply with the specified requirements. Provide a manufacturer's warranty that has no dollar limit, covers full system water-tightness, and has a minimum duration of 20 years.
1.8.1 Roof Membrane Manufacturer Warranty
Furnish the roof membrane manufacturer's 20-year no dollar limit roof system materials and installation workmanship warranty, including flashing, insulation and accessories necessary for a watertight roof system construction. Provide warranty directly to the Government and commence warranty effective date at time of Government's acceptance of the roof work. The warranty must state that:
a. If within the warranty period the roof system, as installed for its intended use in the normal climatic and environmental conditions of the facility, becomes non-watertight, shows evidence of moisture intrusion within the assembly, blisters, splits, tears, delaminates, separates at the seams, or shows evidence of excessive weathering due to defective materials or installation workmanship, the repair or replacement of the defective and damaged materials of the roof system assembly and correction of defective workmanship are the responsibility of the roof membrane manufacturer. All costs associated with the repair or replacement work are the responsibility of the roof membrane manufacturer.
b. When the manufacturer or his approved applicator fail to perform the repairs within 72 hours of notification, emergency temporary repairs performed by others does not void the warranty.
c. Upon completion of installation, and acceptance by the Contracting Officer] and Roofing System Engineer of Record, the manufacturer must supply the appropriate warranty to the Owner.
d. Installer must submit a minimum two year warranty to the membrane manufacturer from the date of acceptance, with a copy to the Contracting Officer and Roofing System Engineer of Record.
1.8.2 Roofing System Installer Warranty
The roof system installer must warrant for a period of two years that the roof system, as installed, is free from defects in installation workmanship, to include the roof membrane, flashing, insulation, accessories, attachments, and sheet metal installation integral to a complete watertight roof system assembly. Write the warranty directly to the Government. The roof system installer is responsible for correction of defective workmanship and replacement of damaged or affected materials. The roof system installer is responsible for all costs associated with the repair or replacement work.
SECTION 07 52 00 Page 10
1.8.3 Continuance of Warranty
Repair or replacement work, ARMA 410BUR88, NRCA C3701 that becomes necessary within the warranty period and accomplished in a manner so as to restore the integrity of the roof system assembly and validity of the roof membrane manufacturer warranty for the remainder of the manufacturer warranty period.
1.9 CONFORMANCE AND COMPATIBILITY
Provide the entire roofing and flashing system in accordance with specified and indicated requirements, including fire and wind resistance ( ANSI/SPRI/FM 4435/ES-1 ) requirements. Work not specifically addressed and any deviation from specified requirements must be in general accordance with recommendations of the NRCA Roofing and Waterproofing Manual, membrane manufacturer published recommendations and details, and compatible with surrounding components and construction. Submit any deviation from specified or indicated requirements to the Contracting Officer for approval prior to installation.
PART 2 PRODUCTS
2.1 MODIFIED BITUMEN SHEETS AND FIBERGLASS FELT MATERIALS
Furnish a combination of specified materials that comprise the modified bitumen manufacturer's standard system of the number and type of plies specified. Provide materials suitable for the service and climatic conditions of the installation. Modified bitumen sheets must be watertight and visually free of pinholes, particles of foreign matter, non-dispersed raw material, factory splices, or other conditions that might affect serviceability. Polymer modifier must comply with ARMA PMBRG98 and be uniformly dispersed throughout the sheet. Edges of sheet must be straight and flat.
a. SBS Base Sheet (Mechanically fastened): Type I, ASTM 6164, Grade S, minimum 110 mils thick.
b. SBS Base Sheet (Cold applied): Type I, ASTM 6164, Grade S, minimum 118 mils thick.
c. SBS Cap Sheet: ASTM D6164/D6164M, Type I, Grade G, minimum 157 mils thick, and as required to provide specified fire safety rating.
2.2 BASE FLASHING MEMBRANE
Membrane manufacturer's standard, minimum two-ply modified bitumen membrane flashing system compatible with the roof membrane specified and as recommended in membrane manufacturer's published literature. Provide flashing membranes that meet or exceed the properties of the material standards specified for the modified bitumen base and cap sheet, except that flashing membrane thickness must be as recommended by the membrane manufacturer.
2.3 MEMBRANE SURFACING
Provide modified bitumen roof membrane cap sheet with factory-applied granule surfacing of light color as selected from membrane manufacturer's standard colors. See 1.2 DESCRIPTION OF ROOF MEMBRANE SYSTEMS, CAP SHEET)
SECTION 07 52 00 Page 11
2.4 PRIMER
ASTM D41/D41M, or other primer compatible with the application and as approved in writing by the modified bitumen membrane manufacturer.
2.5 MODIFIED BITUMEN ROOF CEMENT
ASTM D4586/D4586M , Type II for vertical surfaces, Type I for horizontal surfaces, compatible with the modified bitumen roof membrane and as recommended by the modified bitumen membrane manufacturer.
2.6 CANT AND TAPERED EDGE STRIPS
Cant strips must be minimum 1-1/2 inch thick and provide for minimum 5 inch face and 3-1/2 inch vertical height when installed at 45 degree face angle, except where clearance restricts height to lesser dimension. Taper edge strips at a rate of one to 1-1/2 inch per foot to a minimum of 1/8 inch of thickness. Provide kiln-dried preservative-treated wood cants, in compliance with requirements of Section 06 10 00 ROUGH CARPENTRY at base of wood nailers set on edge and wood curbing and where otherwise indicated.
2.7 FASTENERS AND PLATES
Provide coated, corrosion-resistant fasteners as recommended by the modified bitumen sheet manufacturer's printed instructions and meeting the requirements of FM 4470 and FM APP GUIDE for Class I roof deck construction and the wind uplift resistance specified. For fastening of membrane or felts to wood materials, provide fasteners driven through 1 inch diameter metal discs, or one piece composite fasteners with heads not less than 1 inch in diameter or 1 inch square with rounded or 45 degree tapered corners.
2.7.1 Masonry or Concrete Walls and Vertical Surfaces
Use hardened steel nails or screws with flat heads, diamond shaped points, and mechanically deformed shanks not less than 1 inch long for securing felts, modified bitumen sheets, metal items, and accessories to masonry or concrete walls and vertical surfaces. Use power-driven fasteners only when approved in writing by the Contracting Officer.
2.7.2 Metal Plates
Provide flat corrosion-resistant round stress plates as recommended by the modified bitumen sheet manufacturer's printed instructions and meeting the requirements of FM 4470 ; not less than 2 inch in diameter. Form discs to prevent dishing or cupping.
2.8 PRE-MANUFACTURED ACCESSORIES
Pre-manufactured accessories must be manufacturer's standard for intended purpose, compatible with the membrane roof system and approved for use by the modified bitumen membrane manufacturer.
2.8.1 Pre-fabricated Curbs
Provide 18 gauge G90 galvanized curbs with minimum 4 inch flange for attachment to roof nailers. Curbs must be minimum height of 10 inch above the finished roof membrane surface.
SECTION 07 52 00 Page 12
2.9 WALKPADS
Provide roof walkpads that are polyester reinforced, granule-surfaced modified bitumen membrane material, minimum 197 mils thick, compatible with the modified bitumen sheet roofing and as recommended by the modified bitumen sheet roofing manufacturer. Panels must not exceed 4 foot in length. Other walkpad materials require approval of the Contracting Officer prior to installation.
2.10 ROOF INSULATION BELOW MODIFIED BITUMEN MEMBRANE SYSTEM
Provide insulation compatible with the roof membrane, approved by the membrane manufacturer and as specified in Section 07 22 00 ROOF AND DECK
INSULATION.
PART 3 EXECUTION
3.1 EXAMINATION
Ensure that the following conditions exist prior to application of the roofing materials:
a. Do not install items that show visual evidence of biological growth.
b. Drains, curbs, cants, perimeter walls, roof penetrating components, and equipment supports are in place.
c. Surfaces are rigid, clean, dry, smooth, and free from cracks, holes, and sharp changes in elevation. Joints in the substrate are sealed to prevent dripping of bitumen into building or down exterior walls.
d. The plane of the substrate does not vary more than 1/4 inch within an area 10 by 10 foot when checked with a10 foot straight edge placed anywhere on the substrate.
e. Substrate is sloped as indicated to provide positive drainage.
f. Walls and vertical surfaces are constructed to receive counter flashing, and will permit mechanical fastening of the base flashing materials.
g. Treated wood nailers are in place on non-nailable surfaces, to permit nailing of base flashing at minimum height of 8 inch above finished roofing surface.
h. Protect all combustible materials and surfaces which may contain concealed combustible or flammable materials. All fire extinguishing equipment has been placed as specified.
i. Verify all Fire Watch personnel assignments.
j. Treated wood nailers are fastened in place at eaves, gable ends, openings, and intersections with vertical surfaces for securing of membrane, edging strips, attachment flanges of sheet metal, and roof fixtures. Surface-applied nailers are the same thickness as the roof insulation.
k. Cants are securely fastened in place in the angles formed by walls and other vertical surfaces. The angle of the cant is 45 degrees and the
SECTION 07 52 00 Page 13 height of the vertical leg is not less than 3-1/2 inch.
l. Insulation boards are installed smoothly and evenly, and are not broken, cracked, or curled. There are no gaps in insulation board joints exceeding 1/4 inch in width. Insulation is being roofed over on the same day the insulation is installed.
3.2 PREPARATION
3.2.1 Protection of Property
3.2.1.1 Protective Coverings
Install protective coverings at paving and building walls adjacent to hoistsl prior to starting the work. Lap protective coverings not less than 6 inch, secure against wind, and vent to prevent collection of moisture on covered surfaces. Keep protective coverings in place for the duration of the roofing work.
3.2.1.2 Bitumen Stops
Provide felt bitumen stops or other means to prevent bitumen drippage at roof edges, openings, and vertical projections before hot mopped application of the roofing membrane.
3.2.2 Equipment
3.2.2.1 Mechanical Application Devices
Mount mechanical application devices on pneumatic-tired wheels. Use devices designed and maintained to operate without damaging the insulation, roofing membrane, or structural components.
3.2.3 Priming of Surfaces
Prime all surfaces to be in contact with adhered membrane materials.
Apply primer at the rate of 0.75 gallon per 100 sq. ft. or as recommended by modified bitumen sheet manufacturer's printed instructions to promote adhesion of membrane materials. Allow primer to dry prior to application of membrane materials to primed surface. Avoid flammable primer material conditions in torch applied membrane applications.
3.2.3.1 Priming of Concrete and Masonry Surfaces
After surface dryness requirements have been met, coat concrete and masonry surfaces which are to receive membrane materials uniformly with primer.
3.2.3.2 Priming of Metal Surfaces
Prime flanges of metal components to be embedded into the roof system prior to setting in bituminous materials or stripping into roofing system.
3.2.4 Membrane Preparation
Unroll modified bitumen membrane materials and allow to relax a minimum of 30 minutes prior to installation. In cold weather, adhere to membrane manufacturer's additional recommendations for pre-installation membrane handling and preparation. Inspect for damage, pinholes, particles of
SECTION 07 52 00 Page 14 foreign matter, non-dispersed raw material, factory splices, or other conditions that might affect serviceability. Edges of seams must be straight and flat so that they may be seamed to one another without forming fish mouths or wrinkles. Discard damaged or defective materials.
3.2.5 Substrate Preparation
Apply membrane to clean, dry surfaces only. Do not apply membrane to surfaces that have been wet by rain or frozen precipitation within the previous 12 hours. Provide cleaning and artificial drying with heated blowers or torches as necessary to ensure clean, dry surface prior to membrane application. Torches may not be used to ensure clean, dry surfaces prior to membrane applications if the roof deck or materials used in the installation of the roofing system are combustible.
3.3 APPLICATION
Apply roofing materials as specified herein unless approved otherwise by the Contracting Officer. Keep roofing materials dry before and during application. Complete application of roofing in a continuous operation.
Begin and apply only as much roofing in one day as can be completed that same day. Maintain specified temperatures for asphalt. Provide temporary roofing and flashing as specified herein prior to application of permanent roofing system.
3.3.1 Application Method
3.3.2 The ambient temperature shall be above 50 F (10 C), and the adhesive temperature shall be a minimum of 70 F (21 C) at the point of membrane application.
3.3.3 To ensure the adhesive is applied at 70 F (21 C), during cold weather, drums and 5 gallon pails shall be stored in heated areas.
Drums and 5 gallon pails exposed to cold temperature on the roof shall be provided with heaters when necessary to ensure the minimum application temperature is maintained.
3.3.4 Priming substrates is optional when solvent-based membrane adhesives are used. Primer may be applied to reduce adhesive consumption rates for some absorptive substrates.
3.3.5 Adhesive may be applied using a 3/16 - 3/8 inch notched squeegee, brush or spray equipment.
3.3.6 Adhesive may be applied using a 3/16 - 3/8 inch notched squeegee or brush.
3.3.7 Apply adhesive to clean, dry and prepared compatible substrates as required to ensure full adhesion.
3.3.8 Follow the adhesive product data sheet requirements for application rates.
3.3.9 Apply a uniform application of membrane adhesive at the application rate published on the product data sheet.
3.3.10 Apply 1-1/2 to 2 gallons per square between membrane plies. The application rate is 2 to 3 gallons per square or more over absorptive substrates and over granule surfaces. Refer to
SECTION 07 52 00 Page 15 manufacturer's product data sheet, and adjust application rate based upon surface conditions.
3.3.11 Install the SBS membrane ply before the adhesive begins to skin over. Once adhesive skins over, the membrane ply will not adhere.
3.3.2 Modified Bitumen Membrane Application
Ensure proper sheet alignment prior to installation. Apply membrane layers perpendicular to slope of roof in shingle fashion to shed water, including application on areas of tapered insulation that change slope direction. Bucking or backwater laps are prohibited. Fully adhere membrane sheets to underlying substrate materials. Provide minimum 3 inch side laps and minimum 6 inch end laps and as otherwise required by membrane manufacturer. Stagger end laps minimum 36 inch. Offset side laps between membrane layers a minimum of 12 inch. Offset end laps between membrane layers a minimum of 36 inch. Install all membrane layers the same workday, unless supported otherwise by roof membrane manufacturer application instructions and approved by the Contracting Officer. Provide tight smooth laminations of each membrane layer without wrinkles, ridges, buckles, kinks, fishmouths, or voids. Ensure full membrane adhesion and full lap seals. Rework to seal any open laps prior to application of subsequent membrane layers. The completed membrane application must be free of surface abrasions, air pockets, blisters, ridges, wrinkles, buckles, kinks, fishmouths, voids, or open seams.
3.3.2.1 Cap Sheet Installation
Underlying applied membrane must be inspected and repaired free of damage, holes, puncture, gouges, abrasions, and any other defects, and free of moisture, loose materials, debris, sediments, dust, and any other conditions required by the membrane manufacturer prior to cap sheet installation. Do not apply cap sheet if rain or frozen precipitation has occurred within the previous 24 hours. Align cap membrane and apply by the specified method with the proper side and end lap widths. Cut at a 45 degree angle across selvage edge of cap membrane to be overlapped in end lap areas prior to applying overlapping cap membrane. Apply matching granules in any areas of adhesive bleed out while the adhesive is still tacky. Minimize traffic on newly installed cap sheet membrane.
3.3.3 Membrane Flashing
Apply two-ply modified bitumen strip flashing and sheet flashing in the angles formed where the roof deck abuts walls, curbs, ventilators, pipes, and other vertical surfaces, and where necessary to make the work watertight. Apply membrane flashing in accordance with the roof membrane manufacturers printed instructions and as specified. Cut at a 45 degree angle across terminating end lap area of cap membrane prior to applying adjacent overlapping cap membrane. Press flashing into place to ensure full adhesion and avoid bridging. Ensure full lap seal in all lap areas.
Mechanically fasten top edge of modified bituminous base flashing 150 mm (6 inches) on center through minimum 1 inch diameter tin caps with fasteners of sufficient length to embed minimum one inch into attachment substrate. Apply matching granules in any areas of adhesive bleed out while the adhesive is still tacky. Apply membrane liner over top of exposed nailers and blocking and to overlap top edge of base flashing installation at curbs, parapet walls, expansion joints and as otherwise indicated to serve as waterproof lining under sheet metal flashing components. Metal flashing per SMACNA 1793 guidelines and standards is
SECTION 07 52 00 Page 16 specified under Section 07 60 00 FLASHING AND SHEET METAL. Do not set metal flashing in hot asphalt.
3.3.3.1 Membrane Strip Flashing
Set primed flanges of metal flashing in full bed of modified bituminous cement material and securely fasten through to attachment substrate.
Strip-in with membrane flashing so that strip extends not less than 4 inch beyond outer edge of flange. Where multiple membrane stripping plies are installed, extend each additional stripping ply minimum 4 inch beyond edge of previous ply.
3.3.3.2 Membrane Flashing at Roof Drain
Roof drains are specified in Section 22 00 00 PLUMBING, GENERAL PURPOSE.
Flashing for roof drains, is specified in Section 07 60 00 FLASHING AND SHEET METAL. Extend membrane sheets to edge of drain bowl opening at the roof drain deck flange in accordance with membrane manufacturer's printed application instructions. Securely clamp membrane sheets and metal roof drain flashing and strip flashing in the flashing clamping ring. Secure clamps so that sheets and metal flashing are free from wrinkles and folds. Trim stripping must be flush with inside of clamping ring.
3.3.3.3 Pre-fabricated Curbs
Securely anchor prefabricated curbs to nailer or other base substrate and flash with modified bitumen membrane.
3.3.3.4 Set-On Accessories
Where pipe or conduit blocking, supports and similar roof accessories are set on the membrane, adhere walkpad material to bottom of accessories prior to setting on roofing membrane. Install set-on accessories to permit normal movement due to expansion, contraction, vibration, and similar occurrences without damaging roofing membrane. Do not mechanically secure set-on accessories through roofing membrane into roof deck substrate.
3.3.4 Roof Walkpads
Install walkpads at roof access points and where otherwise indicated for traffic areas and for access to mechanical equipment, in accordance with the modified bitumen sheet roofing manufacturer's printed instructions.
Provide minimum 6 inch separation between adjacent walkpads to accommodate drainage. Provide walkpad or an additional layer of cap sheet under precast concrete paver blocks to protect the roofing.
3.3.5 Correction of Deficiencies
Where any form of deficiency is found, take additional measures as deemed necessary by the Contracting Officer to determine the extent of the deficiency and perform corrective actions as directed by the Contracting Officer.
3.3.6 Clean Up
Remove debris, scraps, containers and other rubbish and trash resulting from installation of the roofing system from job site each day.
SECTION 07 52 00 Page 17
3.4 CORRECTION OF DEFICIENCIES
Where any form of deficiency is found, take additional measures as deemed necessary by the Contracting Officer to determine the extent of the deficiency and perform corrective actions as directed by the Contracting Officer.
3.5 PROTECTION OF APPLIED ROOFING
At the end of the day's work and when precipitation is imminent, protect applied modified bitumen roofing system from water intrusion.
3.5.1 Water Cutoffs
Straighten insulation line using loose-laid cut insulation sheets and seal the terminated edge of modified bitumen roofing system in an effective manner. Remove the water cut-offs to expose the insulation when resuming work, and remove the insulation sheets used for fill-in.
3.5.2 Temporary Flashing for Permanent Roofing
Provide temporary flashing at drains, curbs, walls and other penetrations and terminations of roofing sheets until permanent flashing can be applied. Remove temporary flashing before applying permanent flashing.
3.5.3 Temporary Walkways, Runways, and Platforms
Do not permit storing, walking, wheeling, and trucking directly on applied roofing materials. Provide temporary walkways, runways, and platforms of smooth clean boards, mats or planks as necessary to avoid damage to applied roofing materials, and to distribute weight to conform to live load limits of roof construction. Use rubber-tired equipment for roofing work.
3.6 FIELD QUALITY CONTROL
Perform field tests in the presence of the Contracting Officer. Notify the Contracting Officer one day before performing tests.
3.6.1 Construction Monitoring
During progress of the roof work, make visual inspections as necessary to ensure compliance with specified parameters. Additionally, verify the following:
a. Materials comply with the specified requirements.
b. Materials are not installed in adverse weather conditions.
All materials are properly stored, handled and protected from moisture or other damages.
c. Equipment is in working order. Metering devices are accurate.
d. Substrates are in acceptable condition, in compliance with specification, prior to application of subsequent materials.
(1) Nailers and blocking are provided where and as needed.
SECTION 07 52 00 Page 18
Insulation substrate is smooth, properly secured to its substrate, and without excessive gaps prior to membrane application.
(2) The proper number, type, and spacing of fasteners are installed.
Membrane heating, hot mopping, or adhesive application is provided uniformly and as necessary to ensure full adhesion of roll materials. Asphalt is heated and applied within the specified temperature range.
The proper number and types of plies are installed, with the specified overlaps.
Applied membrane surface is inspected, cleaned, dry, and repaired as necessary prior to cap sheet installation.
(3) Lap areas of all plies are completely sealed.
Membrane is fully adhered without ridges, wrinkles, kinks, fishmouths, or other voids or delaminations.
Installer adheres to specified and detailed application parameters.
Associated flashing and sheet metal are installed in a timely manner in accord with the specified requirements.
Temporary protection measures are in place at the end of each work shift.
3.6.1.1 Manufacturer's Inspection
Manufacturer's technical representative must visit the site a minimum of three times during the installation for purposes of reviewing materials installation practices and adequacy of work in place.
Inspections must occur during the first 20 squares of membrane installation, at mid-point of the installation, and at substantial completion, at a minimum. Additional inspections must not exceed one for each 100 squares of total roof area with the exception that follow-up inspections of previously noted deficiencies or application errors must be performed as requested by the Contracting Officer. After each inspection, submit a report, signed by the manufacturer's technical representative to the Contracting Officer within 3 working days. Note in the report overall quality of work, deficiencies and any other concerns, and recommended corrective action.
3.7 INSTRUCTIONS TO GOVERNMENT PERSONNEL
Furnish written and verbal instructions on proper maintenance procedures to designated Government personnel. Furnish instructions by a competent representative of the modified bitumen membrane manufacturer and include a minimum of 4 hours on maintenance and emergency repair of the membrane.
Include a demonstration of membrane repair, and give sources of required special tools. Furnish information on safety requirements during maintenance and emergency repair operations.
3.8 INFORMATION CARD
For each roof, furnish a typewritten information card for facility Records and a card laminated in plastic and framed for interior display at roof
SECTION 07 52 00 Page 19 access point, or a photoengraved 0.039 inch thick aluminum card for exterior display. Card must be 8 1/2 by 11 inch minimum, identifying facility name and number; location; contract number; approximate roof area; detailed roof system description, including deck type, membrane, number of plies, method of application, manufacturer, insulation and cover board system and thickness; presence of tapered insulation for primary drainage, presence of vapor retarder; date of completion; installing contractor identification and contact information; membrane manufacturer warranty expiration, warranty reference number, and contact information.
Install card at roof top or access location as directed by the Contracting Officer and provide a paper copy to the Contracting Officer.
-- End of Section --
SECTION 07 52 00 Page 20