DrawingsAsOne1_Part7.pdf
PDF 2 MB Posted
- Attached to
- Repair & Improve B-4279
- Solicitation number
- N400856813830
About this file
DrawingsAsOne - Part 7
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_02_-_6813830.pdf | ||
| DrawingsAsOne1_Part2.pdf | ||
| DrawingsAsOne1_Part5.pdf | ||
| DrawingsAsOne1_Part3.pdf | ||
| DrawingsAsOne1_Part8.pdf | ||
| DrawingsAsOne1_Part4.pdf | ||
| RFP_-_6813830.pdf | ||
| DrawingsAsOne1_Part1.pdf | ||
| SpecsAsOne.pdf | ||
| DrawingsAsOne1_Part6.pdf | ||
| DrawingsAsOne1_Part9.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M A
R
IN
E C
O R
P S
A
IR
S
TA
TI
O
N , C
H E
R R
Y P
O
IN
T, N
C
R E
P A
IR
S
A N
D
IM
P R
O V
E M
E N
TS
TO
B U
IL
D
IN
G
FX501
SCALE:
WET PIPE INSPECTOR'S TEST CONNECTION
N.T.S.
SCALE:
DRY PIPE INSPECTOR'S TEST CONNECTION
N.T.S.
SCALE:
DIAGRAMMATIC RISER CONFIGURATION
N.T.S.
SCALE:
TYPICAL PENDENT SPRINKLER
N.T.S.
SCALE:
TYPICAL UPRIGHT SPRINKLER ON SPRIG CONFIGURATION
N.T.S.
SHEET NOTES
FROM NEW 6-INCH DEDICATED FIRE SERVICE LINE.
6-INCH HORIZONTAL BACKFLOW PREVENTER.
6-INCH DRY-PIPE VALVE.
6-INCH RISER CHECK VALVE.
TO ATTIC DRY-PIPE SPRINKLER SYSTEM.
TO WET-PIPE OVERHEAD SPRINKLER SYSTEM.
TO FDC AND BACKFLOW PREVENTER TEST CONNECTION.
PRESSURE
MAINTENANCE
DEVICE
TO DRY SYSTEM
NITROGEN
BUFFER STORAGE
TANK
NITROGEN
GENERATOR
SYSTEM
AIR IN (AIR COMPRESSOR
OPTIONAL) TO PROVIDE
PIPING SYSTEM
PRESSURE WITHIN 30
MINUTES PER NFPA 13
SECTION 8.2.6.8.4
FLOOR
NITROGEN GENERATOR
BYPASS VALVE TO BE
MONITORED
M A
R
IN
E C
O R
P S
A
IR
S
TA
TI
O
N , C
H E
R R
Y P
O
IN
T, N
C
R E
P A
IR
S
A N
D
IM
P R
O V
E M
E N
TS
TO
B U
IL
D
IN
G
FX502
SCALE:
NITROGEN GENERATOR SYSTEM LAYOUT
N.T.S.
SCALE:
COACH SCREW HANGER SUPPORT
N.T.S.
SCALE:
HANGER SPACING REQUIREMENTS
N.T.S.
SCALE:
TYPICAL SIDE BEAM HANGER
N.T.S.
File details come from the government source that posted it.