This is Amendment 0001 to solicitation N40085-26-R-9062, issued by NAVFAC Mid-Atlantic on August 13, 2026, for Building RR155 Replace ERU (Energy Recovery Unit) at Camp Lejeune, NC. The amendment answers three requests for information submitted by potential offerors. The proposal receipt deadline remains unchanged. Offerors must acknowledge receipt of this amendment when submitting their proposals, as failure to do so may result in rejection. The amendment contains responses to vendor inquiries regarding the ERU specifications and existing ductwork, including confirmation that the electrical panel operates at 208 3-phase voltage, acceptance of an enthalpy core ERU design with access doors on the bottom of the unit at no additional cost to the government, and provision of an attached PDF showing the existing ductwork installation and layout connections.
The continuation sheet provides the specific questions and answers from the pre-proposal phase. Question 1 clarified that the electrical panel is 208 3-phase. Question 2 addressed acceptance of alternative ERU core designs with modified access configurations, which the government approved at no cost impact. Question 3 requested documentation of existing duct systems and layout connections, to which the government provided an attached floor plan drawing (P1187 MARSOC Fire Station First Floor Plan) showing the ductwork installation details and spatial arrangements necessary for matching connections to the replacement unit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25-0043 SOW.pdf | ||
| N4008525B0043 Specs.pdf | ||
| RFP Bldg RR155 Replace ERU.pdf | ||
| N4008525B0043 Dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
AMENDMENT NO. 0001 08/13/26 25-0043
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-26-R-9062
7/16/26
25-0043, Bldg RR155 Replace ERU Amendment 0001, Answer Requests for information
The time and date for receipt of proposals remains unchanged.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
N40085-26-R-9062 Amendment 0001
CONTINUATION SHEET
1. QUESTION: Looking at the ERU schedule it doesn’t list the required voltage. Can the government confirm what the voltage is for the ERU?
ANSWER: Electrical panel is listed 208 3 phase.
2. QUESTION: Would the government accept an enthalpy core ERU in lieu of a wheel if it meant ease of access? (i.e. access doors on bottom of unit as opposed to the sides)
ANSWER: The government takes no exception with core unit but will be at no cost to the government.
3. QUESTION: Can the government confirm the existing duct systems and layout connections and arrangements at the ERU, so that we may match the existing duct connections to the new unit?
ANSWER: See attached pdf showing ductwork installation.