This document is Standard Form 30, Amendment No. 0002 to Solicitation N40085-26-R-9022 for Building G560 Domestic Water Line Repairs, issued by NAVFAC Mid-Atlantic on April 17, 2026. The amendment addresses a Request for Information (RFI) and clarifies the scope of work regarding domestic water system replacement at Camp Lejeune, North Carolina. The solicitation is administered by the Resident Officer in Charge of Construction at 1107A Birch Street, Camp Lejeune, NC 28547-2521. The receipt deadline for proposals remains unchanged, and offerors must acknowledge receipt of this amendment when submitting proposals to avoid potential rejection.
The amendment provides answers to four contractor inquiries regarding project scope and documentation. The primary clarification confirms that the intent is to replace all domestic water lines and water heaters inside Building G560, with replacement of hose bibs de-scoped from the project. For questions regarding reflective ceiling plans, finish schedules, and fire ratings of walls and ceilings, the government directs contractors to reference Amendment 001 Drawing set and As-built drawings. All other terms and conditions of the original solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 82-2371 G560 Addition As-Builts.pdf | ||
| 13-0433 As-Built Drawings.pdf | ||
| 24-0030 Drawings - Amendment 001.pdf | ||
| 75-0919 As-Builts.pdf | ||
| Amend01.pdf | ||
| 24-0030 ACM REPORT.pdf | ||
| N4008524B0030 Specs.pdf | ||
| RFP 240030.pdf | ||
| N4008524B0030 Dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
AMENDMENT NO. 0002 4/17/26 24-0030
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-26-R-9022
3/17/26
24-0030, Building G560 Domestic Water Line Repairs Amendment 0002, Request for Information
The time and date for receipt of proposals remains unchanged.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
N40085-26-R-9022 Amendment 0002 Page 2 or 2
CONTINUATION SHEET
1. QUESTION: Plan sheet P101 shows all domestic water piping being demolished. Is the intent for the water heaters (Plumbing Notes 1 thru 3) to be removed or the complete domestic water system as shown? If the system is to be completely removed, is the waterlines in the walls to be removed as well?
ANSWER: See Amendment 001 Drawing set attached. The intent is to replace all domestic water lines and water heaters inside the building. Replacement of hose bibs has been de-scoped.
2. QUESTION: If the entire system is to be removed, we need a reflective ceiling plan for this project. Please provide.
ANSWER: See As-built drawings for reference.
3. QUESTION: If the entire system is to be removed, we need a finish schedule for the project.
Please provide.
ANSWER: See As-built drawings for reference.
4. QUESTION: We also need to know the fire ratings of walls and ceiling. Please provide the appropriate drawings. Note 13 on plan sheet P001 says to maintain the fire rating of floor and wall assemblies.
ANSWER: See As-built drawings for reference.
5. All other terms and conditions remain unchanged.