This is Amendment No. 0002 to Solicitation N40085-26-R-9006 for Building 1231 Replace RTU at Camp Lejeune, North Carolina, issued by NAVFAC Mid-Atlantic. The amendment extends the proposal submission deadline to 23 January 2026 at 1500 hours and must be acknowledged upon proposal submission. The work involves replacement of two rooftop unit (RTU) heating, ventilation, and air conditioning systems—RTU-7 and RTU-10—at a military exchange facility. Key technical clarifications provided include: electrical rooms for both units are located in the rooftop doghouse area; conductors should be spliced to extend as needed rather than installing new wiring; bolted connections are acceptable for equipment rack mounting; minimal interior work is required with coordination needed with store management; existing thermostat conduit should be reused; and ATFP emergency stops and associated conduits have been removed from project scope. The amendment also updates the prevailing wage determination from NC20250010 (dated 12/12/2025) to NC20260010 (dated 01/02/2026) for Onslow County, North Carolina building construction projects, establishing hourly rates and fringe benefits for multiple labor classifications including ironworkers, pipefitters, electricians, carpenters, plumbers, roofers, and various other skilled trades, with rates ranging from $11.98 to $33.96 per hour plus applicable fringes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0001.pdf | ||
| N4008525B0053 Specs.pdf | ||
| RFP 250053.pdf | ||
| N4008525B0053 Dwgs.pdf | ||
| 25-0053 SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 9
AMENDMENT NO. 0002 01/21/26
5. PROJECT NO. (If applicable)
25-0053
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-26-R-9006
12/17/25
25-0053, Building 1231 Replace RTU Amendment 0002, Answer Requests for information
The time and date for receipt of proposals is hereby changed to 23 January 2026 at 1500.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
N40085-26-R-9006 Amendment 0002
CONTINUATION SHEET
1. QUESTION: The electrical room location is not shown in the contract documents.
ANSWER: The electrical room for RTU-7 is located directly under the unit behind Panda Express. The electrical room for RTU-10 is located at the back upper left corner of the store near that unit and directly beneath (quantity 3) exhaust fans.
2. QUESTION: Are we to install new wiring to the new roof top equipment rack or splice conductors to extend as needed?
ANSWER: Splice conductor to extend as needed.
3. QUESTION: Detail 1 on sheet E501 is shown to be welded in place, Is the area below the 2 equipment racks open or is there combustible ceilings below it? Would a bolted connection work?
ANSWER: A bolt connection is acceptable.
4. QUESTION: Phasing of work calls for both units to be removed and back in operation within 24 hours, this doesn’t seem possible without all interior work being completed prior to the roof work. Please advise.
ANSWER: Minimal work should be required in the store. Please coordinate work with the store manager.
5. QUESTION: Are we able to remove all the ceilings for the conduit to be installed during normal working hours?
ANSWER: Please reuse conduit for thermostat associated with RTU-10. Please disregard zone thermostat for RTU-7.
6. QUESTION: A reflective ceiling plan wasn’t provided and we have no idea what type of ceilings are in the work areas. Please provide.
ANSWER: No reflective ceiling plan is needed.
7. QUESTION: The ATFP Emergency Stops are located across the building from the units.
See plan sheet M102. The conduit has to be run above the ceilings to the stops. We don’t know the ceiling types, whether the work can be performed during the hours the PX is open, who provides security of the goods and or removal for the work the take place. Please review and advise.
ANSWER: Please remove ATFP emergency stops and associated conduits from project scope.
8. QUESTION: Will dust walls be required?
ANSWER: Dust walls will not be required.
9. QUESTION: The HHW valve locations are not shown to isolate the HHW at the units.
Please provide the locations.
ANSWER: Hot water valve locations should be in the rooftop doghouse.
10. QUESTION: What is the height of the existing ceilings?
ANSWER: Approximately 12 feet.
11. QUESTION: What is the height of the Roof?
ANSWER: Approximately 20 feet.
12. QUESTION: Can As Built drawings be provided to show what is above the ceilings?
ANSWER: As Built drawings are not available.
13. QUESTION: There is thermostat conduit located in the columns behind the sheetrock that is to be removed, this isn’t shown on the drawings. See note 1 on plan sheet MD102.
ANSWER: Please reuse existing thermostat conduit.
14. Remove Wage Determination NC20250010 dated 12/12/2025 and replace with the following:
General Decision Number: NC20260010 01/02/2026
Superseded General Decision Number: NC20250010
State: North Carolina
Construction Type: Building
County: Onslow County in North Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 01/02/2026
IRON0848-003 07/01/2025
Rates Fringes
IRONWORKER.......................$ 29.75 18.00
PLUM0421-006 07/01/2023
Rates Fringes
PIPEFITTER.......................$ 33.96 13.48
SUNC2018-010 08/08/2023
Rates Fringes
BRICKLAYER.......................$ 19.13 0.00
CARPENTER, Excludes Form Work....$ 18.11 2.63
CEMENT MASON/CONCRETE FINISHER...$ 16.72 0.00
ELECTRICIAN......................$ 22.15 5.93
FORM WORKER......................$ 14.51 1.88
LABORER: Common or General......$ 11.98 0.81
LABORER: Mason Tender - Brick...$ 13.17 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 15.26 0.00
LABORER: Pipelayer..............$ 16.33 3.11
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 21.00 2.89
OPERATOR: Bulldozer.............$ 17.54 2.63
OPERATOR: Forklift..............$ 16.75 0.00
OPERATOR: Grader/Blade..........$ 22.68 3.27
OPERATOR: Roller................$ 15.31 1.46
PAINTER..........................$ 15.55 1.05
PLUMBER..........................$ 23.11 0.00
ROOFER...........................$ 18.26 4.38
SHEET METAL WORKER...............$ 19.67 13.27
TRUCK DRIVER: Dump Truck........$ 15.98 2.93
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded.
If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
15. All other terms and conditions remain unchanged.