AMENDMENT 0006 25R2699.pdf
PDF 252 KB Posted
- Attached to
- REPLACE TUBE BUNDLE IN COOLING TOWER 2, BLDG. 464, DAM NECK ANNEX, VIRGINIA BEACH, VIRGINIA
- Solicitation number
- N4008525R2699
About this file
This document is an Amendment (0006) to Solicitation N4008525R2699 for replacing the tube bundle in Cooling Tower 2 at Building 464, Dam Neck Annex in Virginia Beach, Virginia. The amendment includes a series of Pre-Proposal Information (PPI) responses addressing contractor questions about the project, such as geothermal well field involvement, DDC controls, existing chillers, crane placement, and commissioning requirements. Key details include confirmation that no work will be done in the geothermal well field, no modifications will be made to existing DDC controls, and existing chillers will be taken offline after current military construction is completed.
The solicitation is specifically for Naval Facilities Engineering Command and is limited to contractors in MACC Group ID: ML-C00075. The project involves replacing a heat exchanger coil in Cooling Tower #2 (Model 10077923-B1-MHF7105QAEBNG-13), with requirements for proper electrical power securing and hazardous energy control using OSHA-approved lockout/tagout procedures. Proposals are due on 18 June 2025 at 2:00 PM, and the amendment includes a PPI spreadsheet with responses to contractor inquiries about project-specific details.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
30-May-2025
4. REQUISITION/PURCHASE REQ. NO.
ACQR56109462
5. P ROJECT NO.(If applicable)
6. ISSUED BY CODE N40085 7. ADMINISTERED BY (If other than item 6) CODE
NAVFACSYSCOM MID-ATLANTIC
PWD OCEANA
FACILITIES ENGINEERING & ACQ DIV
953 HORNET DR SUITE 213
VIRGINIA BEACH VA 23460-2190
See Item 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X
9A. AMENDMENT OF SOLICITATION NO.
N4008525R2699
X 9B. DATED (SEE ITEM 11)
16-May-2025
10A. MOD. OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue ofthis amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES T HE CONT RACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. T HIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO T HE AUT HORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SOLICITATION N4008525R2699 REPLACE TUBE BUNDLE IN COOLING TOWER 2, BLDG 464, DAM NECK ANNEX VIRGINIA BEACH, VIRGINIA.
The purpose of this amendment is to issue PPI Responses.
THERE IS NO CHANGE TO THE PROPOSAL DUE DATE AS A RESULT OF THIS AMENDMENT.
PROPOSALS ARE DUE 18 JUNE 2025 AT 2:00 PM.
SEE CONTINUATION PAGE.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
30-May-2025
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 ST ANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
N4008525R2699
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0006
SOLICITATION N4008525R2699 REPLACE TUBE BUNDLE IN COOLING TOWER 2, BLDG 464, DAM
NECK ANNEX VIRGINIA BEACH, VIRGINIA.
The purpose of this amendment is to issue the following documents:
Attachments:
1. PDF: PPI Spreadsheet Responses
The PPI Spreadsheet Responses is embedded into this Amendment.
(End of Summary of Changes)
Page Section Para. Dwg #
1 MIG GOV 05/27/25
During the site visit, there was mention of a geothermal well field. Can contractors be provided information on the well field, and will there be any work that needs to be performed in the well field for this soliciation? There was no mention of this in the RFP.
After reviewing further no work will be done in the geothermal well field, no documentation will be provided.
2 MIG GOV 05/27/25
During the site visit, the command brought up that there may be issues with the DDC controls which may be causing the issues with the heat exchange coil.
There is no mention of modifications to the current DDC controls in the RFP. Will any work need to be done to the DDC system?
After reviewing further no modifications will be done to the existing DDC Controls.
3 MIG GOV 05/27/25
There appears to be new chillers that were installed with the current project that is ongoing at 464. Is the plan to remove the existing chillers, including the one on this contract, once the current project is completed?
After further review yes the existing chillers will be taken offline after existing Milcon is completed.
4 Baron/Rand 05/28/25 Where is an approved area to set up a crane?
After further review before a approved location can be determined, a crane lift plan would have to be submitted and approved. The Geothermal area would be off limits. The area next to the building would be the most appropriate location as long as it can be approved. 0003
5 Baron/Rand 05/28/25 What is the existing unit serial number?
Model 10077923-B1-MHF7105QAEBNG-13 0003
6 MIG GOV 05/28/25
Following up on one of the responses, if the existing chillers are being taken offline once current construction is completed, would it be more cost-efficient for the government to continue using the temporary chiller that is currently on-site until construction is complete, rather than repair a chiller that is going to be removed later on?
That question was brought up previously. It has been decided to move forward with current plan.
7 TDSC 05/29/25 Is commissioning needed for this project?
Yes, commissioning will be required to take the temporary chiller offline once project is complete. 0005
Project Title: REPLACE TUBE BUNDLE IN COOLING TOWER
2, BLDG 464, DAM NECK ANNEX
Solicitation / RFP#: N4008525R2699 - PPI Cut Off Date: 06 June 2025
Amend No.
GOVERNMENT RESPONSE
PPI No.
Offeror
Date
Submitted
REFERENCE
QUESTION
8 Baron/Rand 05/30/25
Is this boiler plate in the specs? I don’t see us demoing any system that has refrigerant in it. Water is in the tower.????
3.6 Refrigerants in the HVAC system to
be demolished must be evacuated prior to disposal. Remove air conditioning, refrigeration, and other equipment containing refrigerants without releasing chlorofluorocarbon refrigerants to the atmosphere in accordance with the Clean
Air Act Amendment of 1990.
Refrigeration, and other equipment containing refrigerants and dispose of in accordance with UFGS 02 41 00
DEMOLITION AND
DECONSTRUCTION.
Section 3.6 is a formallity to cover all units in the event that there is refrigerants.
9 Baron/Rand 05/30/25 Which tower in the is the one with the coil we are quoting replacement on?
The tower is #2
Page Section Para. Dwg #
1 MIG GOV 05/27/25
During the site visit, there was mention of a geothermal well field. Can contractors be provided information on the well field, and will there be any work that needs to be performed in the well field for this soliciation? There was no mention of this in the RFP.
After reviewing further no work will be done in the geothermal well field, no documentation will be provided.
2 MIG GOV 05/27/25
During the site visit, the command brought up that there may be issues with the DDC controls which may be causing the issues with the heat exchange coil.
There is no mention of modifications to the current DDC controls in the RFP. Will any work need to be done to the DDC system?
After reviewing further no modifications will be done to the existing DDC Controls.
3 MIG GOV 05/27/25
There appears to be new chillers that were installed with the current project that is ongoing at 464. Is the plan to remove the existing chillers, including the one on this contract, once the current project is completed?
After further review yes the existing chillers will be taken offline after existing Milcon is completed.
4 Baron/Rand 05/28/25 Where is an approved area to set up a crane?
After further review before a approved location can be determined, a crane lift plan would have to be submitted and approved. The Geothermal area would be off limits. The area next to the building would be the most appropriate location as long as it can be approved. 0003
5 Baron/Rand 05/28/25 What is the existing unit serial number?
Model 10077923-B1-MHF7105QAEBNG-13 0003
6 MIG GOV 05/28/25
Following up on one of the responses, if the existing chillers are being taken offline once current construction is completed, would it be more cost-efficient for the government to continue using the temporary chiller that is currently on-site until construction is complete, rather than repair a chiller that is going to be removed later on?
That question was brought up previously. It has been decided to move forward with current plan.
7 TDSC 05/29/25 Is commissioning needed for this project?
Yes, commissioning will be required to take the temporary chiller offline once project is complete. 0005
Project Title: REPLACE TUBE BUNDLE IN COOLING TOWER
2, BLDG 464, DAM NECK ANNEX
Solicitation / RFP#: N4008525R2699 - PPI Cut Off Date: 06 June 2025
Amend No.
GOVERNMENT RESPONSE
PPI No.
Offeror
Date
Submitted
REFERENCE
QUESTION
8 Baron/Rand 05/30/25
Is this boiler plate in the specs? I don’t see us demoing any system that has refrigerant in it. Water is in the tower.????
3.6 Refrigerants in the HVAC system to
be demolished must be evacuated prior to disposal. Remove air conditioning, refrigeration, and other equipment containing refrigerants without releasing chlorofluorocarbon refrigerants to the atmosphere in accordance with the Clean
Air Act Amendment of 1990.
Refrigeration, and other equipment containing refrigerants and dispose of in accordance with UFGS 02 41 00
DEMOLITION AND
DECONSTRUCTION.
Section 3.6 is a formallity to cover all units in the event that there is refrigerants.
9 Baron/Rand 05/30/25 Which tower in the is the one with the coil we are quoting replacement on?
The tower is #2