AMENDMENT 0002 25R2699.pdf

PDF 186 KB Posted

Attached to
REPLACE TUBE BUNDLE IN COOLING TOWER 2, BLDG. 464, DAM NECK ANNEX, VIRGINIA BEACH, VIRGINIA
Solicitation number
N4008525R2699
Issued by

About this file

This document is a Standard Form 30 (SF-30) Amendment 0002 to Solicitation N4008525R2699 for replacing a tube bundle in Cooling Tower 2, Building 464, at Dam Neck Annex in Virginia Beach, Virginia. The amendment, issued by NAVFACSYSCOM MID-ATLANTIC on 28-May-2025, is specifically for contractors in MACC Group ID: ML-C00075. The purpose of this amendment is to issue PPI (Presumably Price/Proposal Information) Spreadsheet Responses, which are embedded in the document.

The solicitation requires the contractor to provide supervision, labor, materials, and equipment to replace the heat exchanger coil while following OSHA-approved Lockout/Tagout procedures. Proposals are due on 18 June 2025 at 2:00 PM, with no change to the proposal due date resulting from this amendment. The project involves securing electrical power and managing hazardous energy control in accordance with specific safety regulations (EM 385-1-1 Section 12, 29 CFR 1910.333, 29 CFR 1915.89).

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

J

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

28-May-2025

4. REQUISITION/PURCHASE REQ. NO.

ACQR6109462

5. P ROJECT NO.(If applicable)

6. ISSUED BY CODE N40085 7. ADMINISTERED BY (If other than item 6) CODE

NAVFACSYSCOM MID-ATLANTIC

PWD OCEANA

FACILITIES ENGINEERING & ACQ DIV

953 HORNET DR SUITE 213

VIRGINIA BEACH VA 23460-2190

See Item 6

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X

9A. AMENDMENT OF SOLICITATION NO.

N4008525R2699

X 9B. DATED (SEE ITEM 11)

16-May-2025

10A. MOD. OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue ofthis amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES T HE CONT RACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. T HIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO T HE AUT HORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SOLICITATION N4008525R2699 REPLACE TUBE BUNDLE IN COOLING TOWER 2, BLDG 464, DAM NECK ANNEX VIRGINIA BEACH, VIRGINIA.

The purpose of this amendment is to issue PPI Responses.

THERE IS NO CHANGE TO THE PROPOSAL DUE DATE AS A RESULT OF THIS AMENDMENT.

PROPOSALS ARE DUE 18 JUNE 2025 AT 2:00 PM.

SEE CONTINUATION PAGE.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

28-May-2025

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 ST ANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

N4008525R2699

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

SOLICITATION N4008525R2699 REPLACE TUBE BUNDLE IN COOLING TOWER 2, BLDG 464, DAM

NECK ANNEX VIRGINIA BEACH, VIRGINIA.

The purpose of this amendment is to issue the following documents:

Attachments:

1. PDF: PPI Spreadsheet Responses

The PPI Spreadsheet Responses is embedded into this Amendment.

(End of Summary of Changes)

Page Section Para. Dwg #

1 MIG GOV 05/27/25

During the site visit, there was mention of a geothermal well field. Can contractors be provided information on the well field, and will there be any work that needs to be performed in the well field for this soliciation? There was no mention of this in the RFP.

After reviewing further no work will be done in the geothermal well field, no documentation will be provided.

2 MIG GOV 05/27/25

During the site visit, the command brought up that there may be issues with the DDC controls which may be causing the issues with the heat exchange coil.

There is no mention of modifications to the current DDC controls in the RFP. Will any work need to be done to the DDC system?

After reviewing further no modifications will be done done to the existing DDC Controls.

3 MIG GOV 05/27/25

There appears to be new chillers that were installed with the current project that is ongoing at 464. Is the plan to remove the existing chillers, including the one on this contract, once the current project is completed?

After further review yes the existing chillers will be taken offline after existing Milcon is completed.

Project Title: REPLACE TUBE BUNDLE IN COOLING TOWER

2, BLDG 464, DAM NECK ANNEX

Solicitation / RFP#: N4008525R2699 - PPI Cut Off Date: 06 June 2025

Amend No.

GOVERNMENT RESPONSE

PPI No.

Offeror Date

Submitted

REFERENCE QUESTION

Sheet1