This document is an Amendment of Solicitation (Standard Form 30) for a Naval Facilities Engineering Command contract for Fuel Farm Repairs at UN360 and TC366 sites. Amendment No. 0002 extends the time and date for receipt of proposals to 1400 hours on 23 May 2025, and includes a Request for Information (RFI) with five key contractor questions about the project specifications and site work conditions.
The RFI addresses critical project details, including: confirmation that ICC IBC Special Inspection Certification can be removed from specifications (YES), eOMSI cannot be removed from specifications (NO), fuel farm sites must remain operational during construction with potential temporary outages, and both construction sites can be worked on simultaneously. The solicitation is specifically targeted to Mechanical MACC Contractors for repair work in the Camp Lejeune area of responsibility, with the amendment serving to clarify technical and operational parameters for potential bidders.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-25-R-2644 Fuel Farm UN360 and TC366
RFI #1
Contractor Questions
1. Question: Can ICC IBC Special Inspection Certification (Telecommunications Systems Installation Specialist) be removed from specifications?
Answer: YES
2. Question: Can (eOMSI) be removed from the specifications?
Answer: NO
3. Question: Would the Fuel Farm sites and fuel pumps be in use for vehicle fueling during construction or not?
Answer: YES. Fuel Farms must remain in service. Temporary outages can be scheduled.
4: Question: Can the work on both construction sites be performed simultaneously at the same time, or they need to be competed in sequence one after another?
Answer: BOTH sites can be worked on simultaneously.
5. Question: Drawings sheet CG100 notes 10 and 11 require connecting the 8” storm drainpipe to the existing sewer manhole. Please confirm.
Answer: YES