Amend 0006.pdf
PDF 191 KB Posted
- Attached to
- Repair WWTP BNR Train A Bldg FC440
- Solicitation number
- N4008525R2539
About this file
This is Amendment 0006 to solicitation N40085-25-R-2539 for Repair WWTP BNR Train A Bldg FC440, issued by NAVFAC Mid-Atlantic at Camp Lejeune, NC. The amendment extends the proposal due date to December 11, 2024 at 1500 hours.
The amendment provides answers to technical questions about hoist requirements, including: specifying a 20' lift capability, clarifying that pendants are required unless radio controls are specifically requested, confirming NEMA 316 SS works for the outdoor/corrosive environment with Class 1 Division 2 classification extending from water level to 18" above tank, specifying 480v 3-phase bus bar requirements for the monorails, and addressing testing requirements for load tests. The amendment also highlights a structural engineering requirement for diagonal steel bracing on top flanges of all runway beams, including existing beams at Train B, which contractors are specifically warned not to overlook.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 00011.pdf | ||
| Amend 0010.pdf | ||
| Amend 0009.pdf | ||
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Amend 02 Attachment 5.pdf | ||
| Amend 02 Attachment 6.pdf | ||
| Amend 0002.pdf | ||
| Amend 02 Attachment 3.pdf | ||
| Amend 02 Attachment 8.pdf | ||
| Amend 02 Attachment 7.pdf | ||
| Amend 02 Attachment 4.pdf | ||
| Amend 02 Attachment 1.pdf | ||
| Amend 02 Attachment 2.pdf | ||
| Amend 0001.pdf | ||
| RFP 23-0039.pdf | ||
| 23-0039 APPXD.pdf | ||
| N4008523B0039 Specs.pdf | ||
| N4008523B0039 Dwgs.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 3
AMENDMENT NO. 0006 12/04/24 23-0039
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107 A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-25-R-2539
09/03/24
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
23-0039, Repair WWTP BNR Train A Bldg FC440 RFI answers.
The time and date for receipt of proposals is extended to 1500, 11 December 2024.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
N40085-25-R-2539 Amendment 0006
CONTINUATION SHEET
1. QUESTION: The specification doesn’t list how much lift the hoist needs? It appears that the top of header down tot top of wall is 15’, but not sure if the hoist hooks need to go further down beyond the top of the wall?
ANSWER: Provide 20’ lift. User can utilize additional straps/cables if needed.
2. QUESTION: It calls for hoists to have pendants, but the photos of the hoists you sent have radio controls. Can we get clarification on the radio controls requirements.
ANSWER: Provide pendants, unless user requires radio controls; if so request crane servicer to provide/suggest requirements.
3. QUESTION: The specification asks for outdoor / corrosive environment conditions such that they are asking for stainless steel rope and mentioning hazardous environment, but neglect to say what class and div here.
ANSWER: NEMA 316 SS works. The classified location (Class 1 Division 2) extends from water level to 18” above tank for a 10 envelope around the tank. Unclassified outside this area.
4. QUESTION: What are the electrified buss bar down the monorails requirements.
ANSWER: Bus bar 480v, 3 phase. (spec says 460v). Other specifics of the bus are in the crane spec.
5. QUESTION: Testing requirements ANSWER: Provide load tests (no load and loaded) per crane specification.
6. QUESTION: They are asking for non-sparking parts on the hoists, but then will be o.k. with conductor bar to power them that inherently would pose a risk for sparking?
ANSWER: Not an issue.
NOTE: The structural engineer has called for diagonal steel bracing for the top flanges of all the runway beams, with a note to include these on all the existing beams at Train B – we want to ensure all contractors are aware of this, it could be missed. The snip is from sheet S-102.
N40085-25-R-2539 Amendment 0006
7. Proposal due date extended to 1500, on 11 December 2024.
8. All other terms and conditions remain unchanged.
File details come from the government source that posted it. Updated .