25R0079 - Amend 0002.pdf

PDF 246 KB Posted

Attached to
N4008525R0079, MWR MARINA REPAIRS, NAVAL STATION NEWPORT, NEWPORT, RI
Solicitation number
N4008525R0079
Issued by

About this file

This document is an Amendment of Solicitation (Standard Form 30) for Solicitation No. N4008525R0079, a contract for MWR Marina Repairs at Naval Station Newport, Rhode Island. Amendment 0002 incorporates several key additions: the Rhode Island General Permit document, a map for the laydown area, a Continuation Sheet, and responses to Pre-Proposal Inquiries (PPI). The amendment addresses specific technical questions related to environmental permits, electrical conduits, line striping, equipment notification, and project logistics. Key details include maintaining electricity to docks throughout the project, using waterborne paint for line striping, providing a designated laydown area, and referencing various environmental permits from the Rhode Island Department of Environmental Management. The amendment was issued by NAVFACSYSCOM Mid-Atlantic Contracting Core, with the contract point of contact being Leslie McGehee.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

N40085

SOLICITATION NO.: N4008525R0079, MWR Marina Repairs, Naval Station Newport, Newport, Rhode Island.

Contract POC: Leslie McGehee, leslie.m.mcgehee.civ@us.navy.mil, 757-341-1624

See Continuation Page(s)

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511

See Item 6

J

N4008525R0079

1 3

08/25/2025

07/24/2025

N4008525R0079

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 – BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

This Amendment 0002 is issued to incorporate the following:

1. Provide the Rhode Island General Permit document (attached separately)

2. Provide a map for the laydown area (attached separately)

3. Provide the Continuation Sheet (attached separately)

4. Provide Pre-Proposal Inquiry (PPI) responses.

1. Please see the separately attached Rhode Island General Permit document labeled, 25R0079 - Rhode-Island-

General-Permit

2. Please see the separately attached map for the laydown area labeled, 25R0079 - Marina Laydown Area 1

3. Please see the separately attached Continuation Sheet labeled, 25R0079 - CONTINUATION SHEET

4. Please see PPI responses below:

No.

Reference

Question Response Page Section Paragraph

1 01 57 19 1.4

1.4 indicates to comply with the US

ACOE General Permit appended at the end of this section however the

General Permit does not exist after

01 57 19. Please provide.

Please see the attachment labeled:

25R0079 - Rhode-Island-General-Permit

2 01 57 19 1.8

1.8 lists 4 permits the government has obtained and 2 others that the government will obtain. Please provide copies of all permits.

All permits and EV considerations are found in attachment labeled, ATTACHMENT A3 - CATX RONA

MWR MARINA June 25, which was provided at the time of the initial Request for Proposal.

Please also see the attachment labeled:

25R0079 - Rhode-Island-General-Permit

N4008525R0079

3 01 57 19 3.2.4

3.2.4 indicates to comply with the installations MS4 per it requirements. Please provide a copy of the MS4 permit.

Please refer to the Rhode Island

Department of Environmental

Management for the MS4 General Permit

4 01 57 19 3.5.1

3.5.1 indicates to provide notification 6 months in advance prior to bringing equipment on the installation so that air permits can be secured. Is this in fact the case as

6-months is approximately 70% of the contract duration of this project.

Paragraph 3.5.1 relates to stationary fuel burning equipment that will be permanently installed at the Navy Base

G103-

G105

Within the pics on these pages exist existing electrical conduits branching out to each dock from the land side utility trench. Please confirm routing of the conduits and how they exit the utility trench.

Please advise process for disconnecting power and duration of allowed outage.

Electricity to the docks must be maintained through out the project. The

Marina may offer winter berthing on the docks and will require electric. Access to the docks will be provided by a small skiff with the understanding that the docks will not be accessible from the road. Electrical outages must not last more than 8 hours.

The Navy does not have any information on the electrical routing.

6 01 50 00

Please provide the area in which the contractor will have for laydown, storage, and office trailer.

Please see the laydown area in the attachment labeled:

25R0079 - Marina Laydown Area

7 G105

Pics on G105 display line stripping.

Are their any line stripping requirements under this project? If so, please provide scope and material specifications.

Line striping to match existing shall be required. Paint shall be waterborne paint

MPI 97.

Please see the attached CONTINUATION

SHEET for further information.

0002, SF30, pg1
0002, CONTINUATION PAGE