This document is an Addendum (0001) to a Statement of Work (SOW) for replacing the generator at Building 372 at NAS Oceana, Dam Neck Annex in Virginia Beach, VA. The addendum details comprehensive requirements for demolishing the existing 208V generator and automatic transfer switch, and installing a new 125kW, 208/120V, 3-phase generator with specific technical specifications. Key installation requirements include a corrosion-resistant aluminum enclosure with Level 1 sound attenuation, factory-applied coating system, battery charger, local annunciator, and jacket water heater.
The addendum also specifies detailed infrastructure modifications, including installing a new generator grounding system, a 400A service entrance rated automatic transfer switch with maintenance bypass, new disconnect switch, and power/control conductors. A critical requirement is the fuel tank, which must be an above-ground, double-walled, stainless-steel, factory-fabricated diesel storage sub-base tank conforming to UL 2085 standards, with secondary containment, electronic overfill and leak detection systems, and capacity for 24-hour continuous operation under full load.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 372 – REPLACE GENERATOR
NAS Oceana, Dam Neck Annex Virginia Beach VA
Addendum 0001
23 JUL 2025
1) In Part 3, Paragraph D5090 OTHER ELECTRICAL SERVICES, on Pages 35 and 36 of 223:
DELETE:
All paragraphs.
REPLACE WITH:
The generator design must comply with the design criteria specified in UFC 3-540-01, Engine-Driven Generator Systems for Prime and Standby Power Applications, and its referenced documents.
Demolish existing generator and automatic transfer switch.
Demolish existing concrete equipment pad.
Demolish existing generator grounding system.
Existing automatic transfer switch information:
ASCO
Cat#E00300030400C10C 400A, 208V, 60Hz Serial# 994648-008RE
See Photos in Part 6 Attachments for existing generator information
Demolish existing power and controls conductors between the generator and the automatic transfer switch. Reuse existing conduit. Modify as required at the generator and at the building.
Demolish conduit and conductors from automatic transfer switch to Panel P.
Provide and install new 125kW, 208/120V, 3 Phase, 4 Wire generator. Generator to include battery charger, local annunciator, and jacket water heater.
Generator enclosure to be aluminum, corrosion resistant and fully weather resistant.
Enclosure shall be Level 1 sound attenuated. The generator and enclosure shall have factory applied coating system for the severe corrosive environment present at the building location. Field applied coatings will not be acceptable.
BUILDING 372 – REPLACE GENERATOR
NAS Oceana, Dam Neck Annex Virginia Beach VA
Addendum 0001
23 JUL 2025
Provide and install new generator grounding system. Ground new generator and new concrete equipment pad.
Provide and install new 3 phase, 60Hz, 208V, 400A, service entrance rated, open transition, automatic transfer switch with maintenance bypass.
Provide and install new disconnect switch.
Provide and install new power and control conductors from generator to automatic transfer switch.
Provide and install new conduit and conductors from automatic transfer switch to Panel P.
Connect normal building power to line side of new disconnect switch.
Provide and install new conduit and conductors from load side of disconnect switch to automatic transfer switch.
Provide and install power circuits for battery charger and engine heater for generator.
The fuel tank for the generator shall be an above-ground, double-walled, stainless-steel, factory-fabricated diesel fuel storage sub-base tank. The secondary containment reservoir shall be a factory-fabricated stainless steel-type that fully encloses the primary storage tank. The entire tank assembly shall conform to UL 2085 and bear the UL label for a protected tank. The tank shall be inspected in accordance with STI/SPFA SP001.
The tank shall be strength tested before being placed in use in accordance with the applicable code or standard under which it was built per 9VAC25-91-140(B). All tank attachments and connected components shall meet applicable NFPA material requirements and fire ratings. The tank shall be sized for a continuous run time of 24 hours, under full load. The tank shall be provided with a manual direct reading fuel level gauge. The tank shall be provided with an electronic overfill and leak detection system with audible alarms.
**End of Addendum 0001**