N4008525R0036_0002.pdf
PDF 809 KB Posted
- Solicitation number
- N4008525R0036
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008525R0036_0003.pdf | ||
| N4008525R0036_0005.pdf | ||
| N4008525R0036_0004.pdf | ||
| N4008525R0036_0006.pdf | ||
| N4008525R0036_0001.pdf | ||
| 25R0036 General Requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
BUILDING 708, RENOVATATION FOR NAVIFOR LVC TRAINING SPACES, JEB LITTLE CREEK - FORT STORY, VIRGINIA
BEACH, VIRGINIA
Proposal due date of Wednesday, 20 August 2025 @ 1400 hours remains unchanged.
The purpose of this amendment is to provide the following:
(1) Site Visit Log; (2) PPI response (01-05); (3) Complete Drawing Package
SEE SF 30 BLOCK 14 CONTINUATION PAGE
NAVFACSYSCOM MID-ATLANTIC
PWD LITTLE CREEK
FACILITIES ENGINEERING & ACQ DIV
1450 GATOR BLVD SUITE 150
VIRGINIA BEACH VA 23459-8616
N4008525R0036
1 3
07/23/2025
07/08/2025
N4008525R0036
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
This amendment is issued for the following:
(1) Site Visit Log:
a) Attachment M – Site Visit Log
(2) Pre-Proposal Inquiry (01-05)
RFI
No.
Date Submitted
REFERENCE
QUESTION GOVERNMENT RESPONSE
Page Section Para.
7/16/2025 3-Jan 115 1.2
Reference Specification Section 00 01 15 List of Drawings. There are 122 drawings identified on the List of Drawings for the project.
Attachment B (Drawings) located on the PIEE portal appears to contain only 12 drawings. Please review and if your findings are the same, reissue Attachment B with the complete set of Plan Sheets.
Drawing package provided via Amendment 0002
7/16/2025 N/A N/A N/A
Reference Exhibit D (Construction Security Plan). It appears each of the 166 pages of this document appears to include “CUI.” Our understanding is this indicates the document is Controlled Unclassified Information. Are there any restrictions which would prevent us from publishing these documents on our website and disseminating them to plan rooms to allow Trade Partner access?
All documents provided should not be issued/published on any front-facing websites.
Restrictive access only.
No project information, details, specifications, descriptions, or photographs shall be uploaded to the internet, shared with non-vetted personnel, or used in any way not specifically approved by
NAVFAC.
N4008525R0036
7/16/2025 N/A N/A N/A
Reference Amendment 0001 which sets the time and date for the Site Visit along with one day pass request instructions. Is there a particular location (Gate Number, Pass Office address, etc.) attendees should report to in order to receive base access to Building 708?
Attendees should report to Little Creek Gate 3 (B3710) to receive base access for Building 708
7/16/2025 N/A N/A N/A
Will photographs of the interior and exterior of Building 708 be allowed during the Site Visit? Yes, photos will be allowed
7/16/2025
Drawings are noted Preliminary and are not complete. Please advise if there are drawings missing or is this a "design build" project?
If this is design build, please provide the Design Build RFP documents.
Drawing package provided via Amendment 0002
(3) Complete Drawing Package
a) Attachment N – Drawing Package
(End of Summary of Changes)
File details come from the government source that posted it. Updated .