Amendment 0003 N4008524R2808.pdf
PDF 367 KB Posted
- Attached to
- Replace Oil Switch #26, BLDG 464, Dam Neck Annex
- Solicitation number
- N4008524R2808
About this file
This document is an Amendment 0003 to Solicitation N4008524R2808 for the replacement of Oil Switch #26 in Building 464 at the Dam Neck Annex in Virginia Beach, Virginia. The purpose of this amendment is to change the Contract Completion Date (CCD) from 630 days to 690 days. The original solicitation was issued on August 5, 2024, and best and final offers are now due by September 10, 2024 at 2:00 PM EDT. The work includes demolition of the existing oil switch and installation of a new SF6 switch, along with related incidental work. The contracting agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
9 Sept-2024
4. REQUISITION/PURCHASE REQ. NO.
ACQR 6028913
5. P ROJECT NO.(If applicable)
6. ISSUED BY CODE N40085 7. ADMINISTERED BY (If other than item 6) CODE
NAVFACSYSCOM MID-ATLANTIC
D OCEANA
FACILITIES ENGINEERING & ACQ DIV
953 HORNET DR SUITE 213
VIRGINIA BEACH VA 23460-2190
See Item 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION
NO. N40085-24-R-2808
X 9B. DATED (SEE ITEM 11)
05 August-2024
10A. MOD. OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X is not extended.
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer Xis extended, Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue ofthis amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES T HE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. T HIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO T HE AUT HORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SOLICITATION N40085-24-R-2808, Replace Oil Switch #26 BLDG 464, Dam Neck Annex, VIRGINIA BEACH, VIRGINIA
The purpose of this amendment is to Change the CCD date from 630 days to 690 days.
BEST and Final Proposals Due 10 September 2024 no later than 2:00 PM EDT
SEE CONTINUATION PAGE.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE
SIGNED 9 Sept -2024
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N40085-24-R-2808 0003 Page
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SOLICITATION N40085-24-R-2808, Replace Oil Switch #26 BLDG 464, Dam Neck Annex, VIRGINIA BEACH, VIRGINIA
The purpose of this amendment is to
1. Change the CCD date from 630 days to 690 days.
2. BEST and Final Proposals Due 10 September 2024 no later than 2:00 PM EDT
| AMENDMENT_0002_N4008524R2808 Oil Switch 26 |
| SITEVISIT |
| PPI Spreadsheet - MIG GOV_NAVFAC Response |
| PPI Submission Form |
File details come from the government source that posted it. Updated .