N4008524R2723-01.pdf
PDF 133 KB Posted
- Attached to
- Cooling Tower and Chiller Maintenance and Eddy Current Testing Services_MCRD Parris Island, South Carolina
- Solicitation number
- N4008524R2723
About this file
This document is an amendment to Solicitation N4008524R2723 for Cooling Tower and Chiller Maintenance and Eddy Current Testing Services at MCRD Parris Island, South Carolina. The amendment provides responses to pre-proposal inquiries, confirming that eddy current testing is required for both condenser and evaporator tubes, and that the contractor is responsible for providing all necessary supplies, with the costs included in their proposal. The solicitation has a closing date of September 24, 2024, and the amendment must be acknowledged in the proposal submission. The FEAD MCRD Parris Island is the issuing office for this requirement under the Naval Facilities Engineering Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008524R2723_Ktr Release.pdf | ||
| N4008524R2723_ELINs.xlsx | XLSX spreadsheet | |
| N4008524R2723_WD.pdf | ||
| N4008524R2723.pdf | ||
| N4008524R2723_PPI.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Cooling Tow er and Chiller Maintenance and Eddy Current Testing Services at MCRD Parris Island, SC. This amendment is issued in response to Pre-Proposal Inquiries submitted by contractors. Please see questions and answ ers below :
1. Please confirm w hether EDDY Current Testing is required for both the condenser and evaporators tubes? Yes, Eddy Current Testing is required for both the condenser and evaporator tubes.
2. Does the Government provide all supplies ie oil f ilters, dryers, etc for this requirement? If not, w hat supplies w ill the contractor be reponsbile for providing and how should the contractor price the supplies? No, the Government does not provide supplies. Contractors are responsible for know ing w hat to supply, supplying the supplies, and including supply costs into their proposal.
This amendment must be acknow ledged w hen your offer is submitted. Failure to acknow ledge this amendment may constitute grounds for rejection of your offer.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Sep-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008524R2723
X 9B. DATED (SEE ITEM 11)
04-Sep-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Sep-2024
CODE
NAVFACSYSCOM MID-ATLANTIC
FEAD MCRD PARRIS ISLAND
BLDG 852 ATSUGI STREET
BEAUFORT SC 29905
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008524R2723
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
File details come from the government source that posted it. Updated .