This document is an Amendment to a solicitation for an Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple Award Construction Contract (MACC) for Design-Build (DB) and Design-Bid-Build (DBB) Waterfront Construction Projects in the Hampton Roads area of Virginia.
The key changes in this amendment include: 1) Updates to the Instruction to Offerors, including revisions to the Construction Experience evaluation factor, allowing small business first-tier subcontractors' experience to be considered, and clarifying requirements for project submissions; 2) Responses to Pre-Proposal Inquiries, including information about bonding capacity and wage determinations; and 3) Inclusion of an Attachment O-Site Visit Log. The overall solicitation is a total small business set-aside with an effective date of March 29, 2024. Offerors are required to submit a bid bond and provide confirmation of their bonding capacity.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4008524R2545 Indef inite Delivery/ Indefinite Quantity (IDIQ), Multiple Aw ard Construction Contract (MACC) for Design-Build (DB)/ Design-Bid-Build (DBB) Waterfront Construction Projects, Hampton Roads Area of Operations, Virginia
Contract POC: Kristy Gerrek, kristy.l.gerrek.civ@us.navy.mil
Please see continuation pages.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Mar-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008524R2545
X 9B. DATED (SEE ITEM 11)
04-Mar-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Mar-2024
CODE
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008524R2545
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001
This amendment is issued to incorporate the following:
1. Updated Instruction to Offerors (changes denoted in red)
2. Provide responses to Pre-proposal Inquiries
3. Provide Attachment O-Site Visit Log (attached separately)
1. INSTRUCTION TO OFFERORS
4. EVALUATION FACTORS FOR AWARD
Change as follows:
(iii) Bid Bond (SF-24). Offeror shall submit a bid bond (SF-24) in the amount of 20% of total project bid price for the seed project or $3M, whichever amount is less. The bid bond shall be in the name of the Offeror identified on the SF1442. In addition, the Offeror shall provide a letter from its bonding company confirming that it has a single award bonding capacity of at least $10,000,000 and the ability to bond multiple projects.
Change as follows:
Factor 1, Corporate Experience
(i) Solicitation Submittal Requirements:
a. Construction Experience:
Offerors shall submit a minimum of three (3) up to a maximum of five (5) relevant construction projects that best demonstrate their experience on relevant projects similar in size, scope, and complexity to the projects proposed for this MACC.
Experience shall be that of the Offeror, either performed as a prime or a subcontractor. Experience of proposed subcontractors will not be considered with the exception of the note below regarding 13 CFR 125.2 (g).
For purposes of this evaluation, a relevant project is further defined as follows:
Size: Completed waterfront/marine project with a final construction cost of $1,000,000 or more. At least one (1) project must have a final construction cost of $4,000,000 or more.
Scope and Complexity: Waterfront/Marine projects that include one or more of the following elements:
Piers; Wharves; Quay Walls; Dry Docks; Bulkheads; Crane Rail Systems; Fender Systems;
Berthing And Mooring; And Waterfront Related Utilities (e.g., Steam; Low Pressure Compressed Air; Fresh Water; Salt Water; Sanitary Sewer; Oily Waste Water Collection; High Voltage to Low Voltage Electrical; and Fire Protection Systems). Note: The Offeror’s proposal shall, cumulatively, demonstrate experience with at least four (4) of the listed elements. All elements do not have to be demonstrated in each project. Offerors should list all the waterfront related element(s) and briefly describe the work performed for those elements in each submitted project and identify self-performed waterfront related work.
Additionally, submitted relevant projects shall, cumulatively, demonstrate the following characteristics:
Experience with (at least one (1) project) that required staging and performing construction in or over open tidal waters from barges and/or other floating or affixed work platforms.
Experience with design-build (at least one (1) project).
Note: In accordance with 13 CFR 125.2(g), small business Offerors may utilize the experience of a small business first-tier subcontractor(s) to demonstrate experience under this evaluation factor if that small business Offeror cannot independently satisfy the experience requirement as defined above. In order to utilize the experience of a small business first-tier subcontractor(s), the offeror must specifically identify the proposed small business first-tier contractor(s) in its proposal in accordance with this Factor. The Government notes that 13 CFR 125.2(g) is specific to only small business Offerors and named small business first-tier subcontractors. As such, the small business Offeror is not permitted to use the experience of a large business subcontractor or large business corporate affiliate in place of its own if the small business Offeror cannot independently satisfy the experience requirement as defined above.
Note: Projects submitted that only include horizontal or civil site work will not be considered relevant.
Recent is defined as having been 100% completed within the past ten (10) years from the date of issuance of this
RFP.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project and will not be considered; rather, Offerors shall submit the work performed under a task order as a project.
The attached Construction & Design Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate Construction and Design Experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages). Information beyond this page limit will not be considered.
For all submitted projects, the description of the project shall clearly describe the Waterfront related scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods, environmental permits) using the criteria identified above and in the basis of evaluation.
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Offerors are still limited to a total of five (5) projects combined. Offerors may submit experience where a member of the JV performed as a JV with another entity, but must clearly demonstrate how its work on that project met Size and Scope/Complexity as defined above. Likewise, Offerors that are not submitting as a JV may submit a project where it performed as a JV with another entity, but must clearly demonstrate how its work on that project met Size and Scope/Complexity as defined above. Offerors are still limited to a total of five (5) projects combined.
For a JV, the offeror shall submit the signed JV agreement. For an 8(a) Mentor-Protégé Joint Venture, the offeror shall submit the signed U.S. Small Business Administration (SBA) Mentor-Protégé approval letter and signed JV agreement.
If an Offeror is utilizing the prime contractor experience of a corporate affiliate (e.g., subsidiaries, sister companies, predecessor companies, and parent companies) or first-tier small business subcontractor; the proposal shall include, on the corporate affiliate or first-tier small business subcontractor’s letterhead, a teaming agreement or letter of commitment. In order for the experience to be considered, the Offeror is also required to clearly demonstrate that the corporate affiliate(s) or first-tier small business subcontractor(s) will have meaningful involvement in the performance of the contract by identifying the personnel or resources from the corporate affiliate(s) or first-tier small business subcontractor(s) that will be dedicated to the contract.
2. Pre- proposal Inquiries PPI # Page Section Paragraph Question Responses
8 4
3.a.1.iii
Paragraph indicates that a minimum single award bond capacity of $15M is required. Since the procurement is Total Small Business set-aside would NAVFAC consider reducing the required bonding capacity $5M for a single project, $10M aggregate?
Please see Amendment 0001.
Wage
Determination N/A
Please provide prevailing wage rates for divers and tenders.
These categories are specialized and there is not a wage decision applicable.
Please bid per RFP.
10 Factor 1 N/A
Would the Government reconsider their stance on utilizing a subcontractor to meet past performance requirements? Allowing a team to submit their projects together provides the Government with a highly qualified group of individuals to compete within this
IDIQ
Please see Amendment 0001. Small business first- tier subcontractors are able to be utilized.
10 Factor 1 N/A
Would the Government allow contractors to provide projects completed by key personnel? Our team is comprised of individuals with extremely relevant experience, and they are more than capable of completing the work required and providing experience
No. Please bid per RFP.
5 N/A N/A N/A Is there flexibility to modify the set-aside designation from small business to large business for this specific project?
No. Please bid per RFP.