This solicitation is for an Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple Award Construction Contract (MACC) for Design-Build (DB)/Design-Bid-Build (DBB) waterfront construction projects in the Hampton Roads area of Virginia. The Naval Facilities Engineering Command is seeking contractors to provide waterfront construction services including design-build and design-bid-build projects. The solicitation number is N4008524R2545 and responses are due based on the dates and times listed in the solicitation and applicable attachments. Awards will be made to multiple awardees as IDIQ contracts. Pricing will be negotiated on a firm-fixed-price or cost-reimbursement basis for individual task orders. There are no set-asides specified.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V47 Breakwater Pier eProject No. 1605379 Naval Station Norfolk, Norfolk, VA
APPENDIX 'C'
PROJECT AND SITE PERMITS
V47 Breakwater Pier eProject No. 1605379 Naval Station Norfolk, Norfolk, VA
THIS PAGE INTENTIONALLY LEFT BLANK
DEPARTMENT OF THE ARMY
US ARMY CORPS OF ENGINEERS
NORFOLK DISTRICT
FORT NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1011
October 12, 2023
Eastern Virginia Regulatory Section NAO-2009-02841 / VMRC# 23-v1875 (Willoughby Bay)
Naval Station Norfolk, CAPT Vince W. Baker, Commanding Officer 9742 Virginia Ave, Bldg. A-81 Norfolk, VA 23511
Dear CAPT Baker:
This is in reference to the Department of the Army application (NAO-2009-02841 / VMRC# 23-v1875) you submitted to construct a new 26-foot wide by 200-foot foot long pile-supported pier, fender pilings, and associated 200-foot long breakwater to accommodate the safe berthing of small Naval vessels. All work will be performed at the northwest corner of the small craft basin, adjacent to Building V-47 on Naval Station Norfolk in Norfolk, Virginia. Your proposed project as described above and depicted on attached drawings entitled “Proposed V47 Breakwater Pier,” dated August 8, 2023, stamped as received by our office on August 14, 2023, and attached drawings entitled “V-47 BREAKWATER PIER” dated April 28, 2023, stamped as received by our office on August 23, 2023, satisfies the terms and conditions of Norfolk District’s State Programmatic General Permit for piers, aquaculture, shoreline, dredging, and other activities (23-SPGP-PASDO), Category B. For Category B, permittees must also obtain authorization from the Virginia Marine Resources Commission (VMRC), Virginia Department of Environmental Quality (VDEQ), and/or a Local Wetlands Board by permit, rule, or regulation prior to commencing work in Waters of the U.S. Private piers for noncommercial purposes that qualify for the statutory authorization found in Section 28.2-1203(A)5 of the Code of Virginia (no permit required from the VMRC) are covered under Category B. Provided that you follow the general and permit specific conditions of the 23-SPGP-PASDO and any additional special conditions that have been included below, no further authorization will be required from the Corps.
IF THE STATE OR LOCAL WETLAND BOARD DOES NOT AUTHORIZE THE
PROPOSED ACTIVITY THIS IS A PROVISIONAL NOTIFICATION THAT A 23-SPGP-
PASDO CATEGORY C AUTHORIZATION IS REQUIRED and you (the applicant) must certify that federally licensed or permitted activities affecting Virginia’s coastal uses or resources will be conducted in a manner consistent with the Virginias’ coastal zone management program (Virginia CZM program) and obtain concurrence from the DEQ, office of environmental impact review (OEIR). It is YOUR responsibility to submit a consistency certification to the OEIR for concurrence or objection, and proof of concurrence must be submitted to the Corps prior to final permit authorization. A template federal consistency certification can be found in the Federal Consistency Manual here: https://www.deq.virginia.gov/our-programs/environmental-impact-review/federal-consistency. For more information or to obtain a list of the enforceable policies of the Virginia CZM Program, contact the DEQ-OEIR at (804) 659-1915 or e-mail: bettina.rayfield@deq.virginia.gov.
The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.
If you suspect that your project may result in purposeful take of migratory birds, contact the U.S. Fish and Wildlife Service Migratory Bird Program at PermitsR5MB@fws.gov. If you are interested in voluntarily reducing impacts to migratory birds and their habitats, please consult https://fws.gov/birds/managment/project-assessment-tools-and-guidance/conservation-measures.php for conservation measures.
Please note that you should either obtain a U.S. Fish and Wildlife Service (FWS) bald eagle take permit or a letter of concurrence from FWS indicating that a permit is not necessary prior to initiating construction activities. You should contact Thomas Wittig concerning this matter at 413-253-8577 or Thomas_wittig@fws.gov.
Enclosed is a "compliance certification" form, which must be signed and returned within 30 days of completion of the project. Your signature on this form certifies that you have completed the work in accordance with the regional permit terms and conditions.
Unless suspended or revoked, the 23-SPGP-PASDO will be in effect until September 4, 2028. Activities which have commenced (i.e., are under construction) or are under contract to commence construction in reliance upon 23-SPGP-PASDO will remain authorized provided the activity is completed within 12 months of the date of this 23-SPGP-PASDO’s expiration of September 4, 2028, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend, or revoke the authorization in accordance with 33 CFR 325.7(a-e). Activities qualifying for this extension that are not complete by September 4, 2029, must apply for new general and/or individual Corps permit authorization. Activities which have NOT commenced and are NOT under contract to commence construction by the September 4, 2028, expiration require a new general and/or individual Corps permit authorization.
The State Water Control Board provided unconditional §401 Water Quality Certification (WQC) for this 23-SPGP-PASDO. Therefore, the activities that qualify for this 23-SPGP-PASDO meet the requirements of the VDEQ Virginia Water Protection Permit Regulation, provided that you abide by the conditions of this 23-SPGP-PASDO.
You will not be required to obtain a separate §401 WQC from VDEQ. This authorization does not relieve your responsibility to comply with local requirements pursuant to the Chesapeake Bay Preservation Act (CBPA), nor does it supersede local government authority and responsibilities pursuant to the Act. You should contact your local government before you begin work to find out how the CBPA applies to your project.
Pursuant to the Coastal Zone Management Act (CZMA) of 1972, the VDEQ Virginia Coastal Zone Management Program (VCP) completed its review of the Federal Consistency Determination (FCD) for this SPGP-PASDO on June 6, 2023, and provided conditional concurrence that Category B authorizations under the 23-SPGP-PASDO are consistent with the VCP. Authorizations under this 23-SPGP-PASDO do not supersede State or local government authority or responsibilities pursuant to any State or local laws or regulations.
In granting an authorization pursuant to this permit, the Norfolk District has relied on the information and data provided by the permittee. If, subsequent to notification by the Corps that a project qualifies for this permit, such information and data prove to be materially false or materially incomplete, the authorization may be suspended or revoked, in whole or in part, and/or the Government may institute appropriate legal proceedings. Please note that you should obtain all required State and local authorizations before you proceed with the project.
If you have any questions and/or concerns about this permit authorization, please contact Traycie West via telephone at (757) 201-7179 or via email at Traycie.L.West@usace.army.mil.
Sincerely, Traycie West Eastern Virginia
Regulatory Section
Enclosure(s)
Cc: Agent Virginia Marine Resources Commission Local Wetlands Board Department of Environmental Quality
U.S. Army Corps Of Engineers Norfolk District
CERTIFICATE OF COMPLIANCE
WITH
ARMY CORPS OF ENGINEERS PERMIT
Permit Number: NAO-2009-02841
VMRC Number: 23-v1875
Corps Contact: Traycie L. West
Permittee Name: US Navy – Pier at Bldg. 47
Date of Verification: October 2023
Permit Type: 23-SPGP-PASDO
Within 30 days of completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification, and return it to the following address:
US Army Corps of Engineers - Norfolk District
CENAO-WR-R
Attn: Traycie L West 803 Front Street Norfolk, VA 23510-1011
Or scan and send via email to Traycie.L.West@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U.S.
Army Corps of Engineers representative. If you fail to comply with this permit, you are subject to permit suspension, modification, or revocation.
I hereby certify that the work authorized by the above-referenced permit has been completed in accordance with the terms and conditions of the said permit and required mitigation has been completed in accordance with the permit conditions.
Signature of Permittee Date
Proposed V47 Breakwater Pier
U.S. NAVY GEOREADINESS PROGRAM
FOR OFFICIAL USE ONLY
Created on: 8/8/2023 at 1043 Pacific Generated on GeoReadiness Explorer
Proposed V47 Breakwater Pier
SYMBOL KEY
Override 1
Override 1
Override 2
Historic District
Sensitive Areas
Cemetery (polygon)
Installation Boundary
Road Name
INSTALLATION LOCATION
0 0.1 0.20.05 mi
0 0.15 0.30.07 km
Credits: Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community, VGIN, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, EPA, NPS, USDA
This map and data contained herein is For Official Use Only. All data shown is considered Unclassified Sensitive upon Aggregation. Reproduction, distribution, publication or exhibition of this data is strictly prohibited without the written consent of the Regional Navy Command. The data contained in this map is subject to change. Please contact the creator for any questions or to request an updated version.
FOR OFFICIAL USE ONLY
Received by VMRC August 11, 2023 /blh
Received by USACE PB 08/14/2023
V-47 BREAKWATER PIER
NAVAL STATION NORFOLK ~ NORFOLK, VIRGINIA
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND ~ MID-ATLANTIC
NORTH
LOCATION MAP
SCALE: 1" = 2000'
VICINITY MAP
SCALE: NONE
PROJECT
LOCATION
NORFOLK, VIRGINIA
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
V4
Br ea kw at er P ie r\P
IE
RV
-1
-G
-0
.d wg
L
AY
O
UT
N
AM
E:
T
IT
LE
S
HE
ET
P
LO
TT
ED
: F rid ay
, A pr il 2 8,
- 1
1:
am U
SE
R:
tt ho m ps on
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
N/A
EAW/IAS
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
N/A
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
, V
A
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
, V
A
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
P R
E L
IM
IN
A
R Y
FINAL BACKCHECK SUBMITTAL - 2023/04/28
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
UNCLASSIFIED
TI
TL
E
SH
EE
T
BA TNT2 RDW
AS NOTED
12869677
G-001
CHESAPEAKE
CHESAPEAKE BAY
BRANCH
SOUTHERN
NANSEMOND RIVER
WESTERN
PORTSMOUTH
U.S. NAVAL
NORFOLK
ELIZABETH RIVER
BRANCH
NORFOLK NAVAL
SHIPYARD
CRANEY ISLAND
NAVY DEPOT
EASTERN BRANCH
AIR STATION
WILLOUGHBY
BAY
VIRGINIA
BEACH
NORTH
PROJECT SITE
U.S. NAVAL STATION
SEWELLS POINT
LITTLE CREEK
U.S. NAVAL
AMPHIBIOUS BASE
0 4000'2000' received TLW USACOE Regulatory Branch August 28, 2023
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
V4
Br ea kw at er P ie r\P
IE
RV
-1
-G
-0
.d wg
L
AY
O
UT
N
AM
E:
L ay ou t1 P
LO
TT
ED
: F rid ay
, A pr il 2 8,
- 1
1:
am U
SE
R:
tt ho m ps on
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
N/A
EAW/IAS
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
, V
A
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
P R
E L
IM
IN
A
R Y
FINAL BACKCHECK SUBMITTAL - 2023/04/28
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
UNCLASSIFIED
INDEX OF DRAWINGS
INDEX NO. SHEET NO. SHEET TITLE
GENERAL
1 G-001 TITLE SHEET
2 G-002 INDEX OF DRAWINGS
3 G-003 GENERAL NOTES AND ABBREVIATIONS
4 G-101 GENERAL ARRANGEMENT PLAN
GEOTECHNICAL
5 B-101 GEOTECHNICAL INVESTIGATIONS PLAN
6 B-601 BORING LOGS - SHEET 1 OF 2
7 B-602 BORING LOGS - SHEET 2 OF 2
SURVEY
8 V-101 EXISTING CONDITIONS PLAN
CIVIL
9 C-101 OVERALL SITE PLAN
10 C-501 CIVIL DETAILS
STRUCTURAL
11 S-001 STRUCTURAL NOTES
12 S-002 STRUCTURAL NOTES, LEGEND, AND ABBREVIATIONS
SD101 DEMOLITION PLAN AND SECTION14
S-101 PILE PLAN15
S-102 DECK PLAN16
S-301 TYPICAL SECTIONS - SHEET 1 OF 217
S-302 TYPICAL SECTIONS - SHEET 2 OF 218
S-303 SUBSTATION PLATFORM SECTION19
S-501 PRESTRESSED CONCRETE SHEET PILE DETAILS20
S-502 PRESTRESSED CONCRETE PILE DETAILS21
S-503 PIER SLAB AND PILE CAP DETAILS22
S-504 APPROACH SLAB DETAILS23
S-505 SUBSTATION PLATFORM DETAILS24
S-506 MOORING HARDWARE DETAILS25
S-507 FENDER SYSTEM AND CONCRETE PILE CAP DETAILS26
S-508 EXPANSION JOINT, WALE, AND TIE ROD DETAILS27
S-509 LADDER DETAILS28
S-510 MISCELLANEOUS DETAILS29
S-511 GUARDRAIL AND STAIR RAILING DETAILS30
S-601 PILE SCHEDULES
ELECTRICAL
E-001 ELECTRICAL NOTES, ABBREVIATIONS AND LEGEND32
E-101 ELECTRICAL SITE PLAN - LANDSIDE33
E-102 ELECTRICAL SITE PLAN - PIER34
E-103 ELECTRICAL SITE PLAN - GROUNDING35
E-401 ENLARGED PLAN - ELECTRICAL SERVICE36
E-501 ELECTRICAL DETAILS - SERVICE EQUIPMENT AND PEDESTAL37
E-502 ELECTRICAL DETAILS - GROUNDING AND DUCTBANK38
E-503 GROUNDING DETAILS - SHEET 1 OF 239
E-504 GROUNDING DETAILS - SHEET 2 OF 240
E-701 ELECTRICAL ONE-LINE DIAGRAM AND SCHEDULES
MECHANICAL
M-001 MECHANICAL NOTES, ABBREVIATIONS AND LEGEND
M-101 MECHANICAL SITE PLAN
M-102 MECHANICAL SITE PLAN - PIER
M-501 MECHANICAL DETAILS
E-702 TELECOM EQUIPMENT ENCLOSURE - EQUIPMENT AND WIRING LAYOUT
NAVFAC
DRAWING
NO.
12869677
12869678
12869679
12869680
12869681
12869682
12869683
12869684
12869685
12869686
12869687
12869688
12869689
12869690
12869691
12869692
12869693
12869694
12869695
12869696
12869697
12869698
12869699
12869700
12869701
12869702
12869703
12869704
12869705
12869706
12869707
12869708
12869709
12869710
12869711
12869712
12869713
12869714
12869715
12869716
12869718
12869719
12869720
12869721
12869717
IN
DE
X
OF
D
RA
W
IN
GS
BA TNT2 RDW
AS NOTED
12869678
G-002
S-003 SUGGESTED SEQUENCE OF CONSTRUCTION12869722
NAVAL STATION LOW WATER DATUM (SLWD)
STA EL 0.00' = NOAA -1.00'
MLLW: MEAN LOWER LOW WATER
STA EL 1.00' = NOAA 0.00'
MLW: MEAN LOW WATER
STA EL 1.12' = NOAA 0.12'
NORTH AMERICAN VERTICAL DATUM
(NAVD 88)
MHW: MEAN HIGH WATER
STA EL 3.55' = NOAA 2.55'
MHHW: MEAN HIGHER HIGH WATER
STA EL 3.76' = NOAA 2.76'
0.2 1'
1.0 0'
0.1 2'
NATIONAL GEODETIC VERTICAL DATUM
(NGVD) 1972 ADJUSTMENT
0.8 1'
0.7 1'
0.9 1'
GENERAL NOTES:
1. IN THE EVENT OF A CONFLICT BETWEEN THE SPECIFICATIONS AND THE DRAWINGS, THE SPECIFICATIONS MUST TAKE PRECEDENCE.
CONTRACTOR MUST VERIFY INFORMATION GIVEN HERE WITH SPECIFICATIONS AND OTHER DOCUMENTS AND BRING ANY CONFLICTS TO THE ATTENTION OF THE CONTRACTING OFFICER BEFORE BEGINNING AFFECTED WORK. THE CONTRACTING OFFICER WILL RESOLVE ANY
SUCH CONFLICT.
2. NOTES BELOW ARE NOT INTENDED TO REPLACE SPECIFICATIONS.
3. ALL WORK MUST CONFORM TO THE REQUIREMENTS OF THESE PLANS AND SPECIFICATIONS.
4. ALL FEDERAL, STATE, AND LOCAL SAFETY REGULATIONS ARE TO BE STRICTLY FOLLOWED.
5. THE CONTRACTOR MUST ABIDE BY ALL APPLICABLE FEDERAL, STATE, AND LOCAL ENVIRONMENTAL PROTECTION STANDARDS, LAWS
AND REGULATIONS.
6. THE CONTRACTOR MUST KEEP COPIES OF ALL ENVIRONMENTAL PERMITS AND LICENSES ON SITE DURING CONSTRUCTION.
7. THE CONTRACTOR MUST BE RESPONSIBLE FOR ALL NAVFAC, EM 385-1-1 AND OSHA SAFETY PRECAUTIONS. METHOD OF DEMOLITION, CONSTRUCTION AND ERECTION OF STRUCTURE ARE THE RESPONSIBILITY OF THE CONTRACTOR.
8. PRIOR TO START OF CONSTRUCTION THE CONTRACTOR MUST CHECK THE DRAWINGS AGAINST THE WORK SITE AND NOTIFY THE CONTRACTING OFFICER IN WRITING OF ANY DISCREPANCIES IN DIMENSIONS OR SITE CONDITIONS. THE CONTRACTOR MUST NOT BEGIN CONSTRUCTION IN ANY SUCH AFFECTED AREA UNTIL THE DISCREPANCY HAS BEEN RESOLVED BY THE CONTRACTING OFFICER.
9. FIELD VERIFY ALL FEATURES, DIMENSIONS, AND ELEVATIONS PRIOR TO FABRICATION OF ASSEMBLIES OR CONSTRUCTION. SEE THE CONTRACT DRAWINGS FOR THE SIZE AND LOCATION OF ALL OPENINGS, VERIFYING SIZE AND LOCATION OF ALL ARCHITECTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION OPENINGS WITH THE RESPECTIVE SUBCONTRACTOR, AS WELL AS COORDINATING ALL ATTACHMENTS FOR THE USE OF OTHER TRADES. THE CONDITIONS SHOWN ON THESE DRAWINGS ARE BASED ON AVAILABLE EXISTING DATA. NOTIFY THE CONTRACTING OFFICER OF ANY DISCREPANCIES BEFORE BEGINNING THE AFFECTED WORK.
10. THE LOCATION AND SIZE OF THE EXISTING UTILITIES SHOWN ON THE CONTRACT DRAWINGS ARE APPROXIMATE, THE FOLLOWING MUST
BE PERFORMED:
A. VERIFY THE LOCATION OF EXISTING UNDERGROUND UTILITIES WITHIN THE WORK AREA PRIOR TO CONSTRUCTION.
B. EXERCISE EXTREME CAUTION WHEN WORKING ADJACENT TO EXISTING LINES TO PREVENT DAMAGE TO THESE LINES.
C. IMMEDIATELY REPAIR ANY DAMAGE TO THE EXISTING UTILITIES RESULTING FROM CONSTRUCTION.
D. MAINTAIN UTILITIES IN ACTIVE OPERATION AT ALL TIMES. INSTALL, TEST AND MAKE FULLY OPERATIONAL PERMANENT OR
TEMPORARY BEFORE EXISTING UTILITIES ARE DISCONNECTED.
11. ALL ELEVATIONS PROVIDED ON THE DRAWINGS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM (NAVD88), UNLESS
OTHERWISE NOTED.
12. HORIZONTAL DATUM IS BASED ON THE VIRGINIA STATE PLANE COORDINATES, VIRGINIA SOUTH NAD 83/93.
13. LINES AND GRADES: ELEVATION DATUM AND CONSTRUCTION BASELINE MUST BE ESTABLISHED AND MAINTAINED BY THE CONTRACTOR.
14. THE CONTRACTOR MUST ENSURE THAT ALL PIPES, CATCH BASINS, MANHOLES, SWALES, ETC. WITHIN AND NEAR THE AREA OF WORK ARE KEPT FREE FROM MATERIAL THAT WOULD HAMPER THE PERFORMANCE OF THE DRAINAGE SYSTEMS. UPON COMPLETION OF THE CONSTRUCTION, REMOVE ACCUMULATED SEDIMENT, DISPOSE OF ALL UNSUITABLE OR EXCESS EXCAVATED MATERIALS AWAY FROM THE
NAVAL STATION AT A LEGAL DISPOSAL SITE APPROVED FOR SUCH MATERIALS.
15. THE CONTRACTOR MUST PLACE SEDIMENT CONTROL DEVICES AND OTHER DEVICES AS NECESSARY TO PREVENT CONSTRUCTION MATERIALS FROM ENTERING THE WATER AND LEAVING THE IMMEDIATE VICINITY OF THE SITE. THE CONTRACTOR MUST BE RESPONSIBLE
FOR CLEAN-UP OF ANY MATERIALS DEPOSITED OUTSIDE THE WORK AREA.
16. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE MAINTENANCE OF THE CONSTRUCTION SITE AND THE AREAS OF WORK WHILE PERFORMING THE WORK OF THIS CONTRACT. CONSTRUCTION DEBRIS MUST BE REMOVED FROM THE CONSTRUCTION SITE ON A DAILY
BASIS. NO BURNING OF DEBRIS MUST BE PERMITTED.
17. ALL DEMOLITION MATERIAL, EXCESS EXCAVATION MATERIAL, AND ALL UNSUITABLE MATERIAL MUST BE HAULED OFF-SITE AND PROPERLY
DISPOSED OF IN ACCORDANCE WITH STATE AND FEDERAL LAW.
18. THE CONTRACTOR MUST UTILIZE WET METHODS OR PROVIDE SUFFICIENT LOCAL EXHAUST VENTILATION WHEN DRILLING, CUTTING, OR
OTHERWISE PENETRATING CONCRETE TO REDUCE AIRBORNE CONCENTRATIONS OF SILICA.
19. THE CONTRACTOR MUST ENSURE PAINTS AND COATINGS ON METAL STRUCTURES ARE SCALED BACK TO A MINIMUM OF 4" PRIOR TO
PERFORMING WELDING OPERATIONS.
20. CONTRACTOR INITIATED CHANGES MUST BE SUBMITTED IN WRITING TO THE CONTRACTING OFFICER FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES ONLY SHOWN ON SHOP DRAWINGS MUST NOT SATISFY THIS REQUIREMENT.
21. ALL STRUCTURAL SYSTEMS WHICH ARE TO BE COMPOSED OF COMPONENTS TO BE FIELD ERECTED MUST BE SUPERVISED BY THE MANUFACTURER DURING MANUFACTURING, DELIVERY, HANDLING, STORAGE AND ERECTION IN ACCORDANCE WITH INSTRUCTIONS
PREPARED BY THE MANUFACTURER.
22. CONTRACTOR MUST TEMPORARILY BRACE INCOMPLETE PARTS OF THE STRUCTURE UNTIL SUCH TIME AS EACH ELEMENT AS A WHOLE IS
COMPLETE.
23. SHOP DRAWING REVIEW: DIMENSIONS AND QUANTITIES ARE NOT REVIEWED BY THE CONTRACTING OFFICER. THESE ITEMS MUST FIRST BE VERIFIED, REVIEWED, AND STAMPED BY THE CONTRACTOR PRIOR TO DELIVERY TO THE CONTRACTING OFFICER.
24. FOR CONSTRUCTION GENERAL ARRANGEMENT AND WORK LIMITS OF PROJECT SITE, SEE SHEET G-101.
DEMOLITION, REMOVAL AND STORAGE:
1. DEMOLITION WORK MUST BE IN ACCORDANCE WITH THE PLANS AND PROJECT SPECIFICATIONS. DEMOLITION PLANS INCLUDED FOR EACH
DISCIPLINE ARE LIMITED TO THAT SPECIFIC DISCIPLINE AND NOT ALL ENCOMPASSING.
2. NECESSARY PRECAUTIONS MUST BE TAKEN TO ENSURE THAT ADJACENT STRUCTURES ARE PROTECTED DURING DEMOLITION.
3. PARTIAL DEMOLITION OF EXISTING CONCRETE MUST BE AS INDICATED. RUBBISH AND DEBRIS MUST BE COLLECTED AND REMOVED FROM
GOVERNMENT PROPERTY AND DISPOSED OF AT A LEGAL OFF-SITE LANDFILL.
4. PERFORM BOTTOM DEBRIS SURVEY PRIOR TO ANY PILE INSTALLATION. REMOVE ALL EXISTING DEBRIS WITHIN THE FOOTPRINT OF THE
NEW STRUCTURE.
5. COLLECT AND DISPOSE OF ALL CONSTRUCTION DEBRIS. DO NOT LET DEBRIS, CONCRETE, REMOVED ITEMS, ETC., FALL INTO THE WATER.
6. ALL DEBRIS THAT FALLS INTO THE WATER MUST BE RETRIEVED AND DISPOSED OF PROPERLY.
7. DEMOLITION MUST BE ACCOMPLISHED IN A MANNER THAT MEETS ALL FEDERAL/STATE/LOCAL REGULATIONS AND PERMIT REQUIREMENTS
AND DOES NOT DIMINISH THE STRUCTURAL INTEGRITY OF THE EXISTING STRUCTURE.
8. ALL EXPOSED REINFORCING STEEL AND ANCHOR RODS FOR DEMOLISHED CONCRETE MUST BE GROUND SMOOTH. APPLY COATING ON
THE BARE METAL WITH ZINC RICH PRIMER.
NAVAL BASE
NORFOLK, VIRGINIA
DIAGRAM OF DATUM PLANE
VERTICAL CONTROL
[*2001 EPOCH]
(NOT TO SCALE)
NOTE: "DIAGRAM OF DATUM PLANE", PROVIDED ABOVE SERVES ONLY TO PROVIDE RELATIVE
DIFFERENCES BETWEEN DATUMS TO AID IN DATUM CONVERSIONS. THIS INFORMATION IS
NOT INTENDED TO IMPLY TIDAL ELEVATIONS OR TIDAL RANGES.
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
V4
Br ea kw at er P ie r\P
IE
RV
-1
-G
-0
.d wg
L
AY
O
UT
N
AM
E:
L ay ou t1 P
LO
TT
ED
: F rid ay
, A pr il 2 8,
- 1
1:
am U
SE
R:
tt ho m ps on
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
N/A
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
P R
E L
IM
IN
A
R Y
FINAL BACKCHECK SUBMITTAL - 2023/04/28
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
UNCLASSIFIED
GE
NE
RA
L N
OT
ES
A
ND
A
BB
RE
VI
AT
IO
NS
BA TNT2 RDW
AS NOTED
12869679
G-003
B6 S-506
GENERAL SYMBOLS
EXTERIOR ELEVATION INDICATORSECTION CUT INDICATOR
PHOTOGRAPH INDICATOR
VIEW NUMBER*
SHEET WHERE SECTION
IS SHOWN
TRUE NORTH DIRECTION
A1 S-601
A2 S-555
CALL-OUT INDICATOR
C3 S-555
DIRECTION OF VIEW
PHOTOGRAPH NUMBER*
SHEET WHERE
PHOTOGRAPH IS SHOWN
D
C
B
A
1 2 3 4 5
DRAWING AREA COORDINATE SYSTEM (DACS)
* VIEW NUMBER BASED ON THE (DACS) LOCATION OF THE LOWER LEFT EXTENTS OF THE VIEW ON THE REFERENCED SHEET. WHEN REFERENCING DRAWING INFORMATION BETWEEN SHEETS BOTH THE VIEW AND THE SHEET NUMBER MUST BE QUOTED TOGETHER - EITHER IN CALLOUT FORMAT AS SHOWN ABOVE OR IN THE
FORM "VIEW NO./SHEET NO.' (A1/C-501).
D
C
B
A
1 2 3 4 5
A1 A2 A3 A4 A5
B1 B2 B3 B4 B5
C1 C2 C3 C4 C5
D1 D2 D3 D4 D5
VIEW NUMBER*
VIEW NUMBER*
SHEET WHERE
VIEW IS SHOWN
INDICATES DIRECTION
OF VIEW
VIEW NUMBER*
SHEET WHERE ELEVATION
IS SHOWN
DRAWING AREA
SCALE: 1 1/2" = 1'-0"
VIEW TITLEC2 REF SHEET
BACK REFERENCE AS REQUIRED,
WERE VIEW IS FROM
PLAN
NORTH
SCALE: NTS
PLAN TITLE
REF SHEET
BACK REFERENCE AS REQUIRED,
WERE VIEW IS FROM
EROSION CONTROL NOTES
1. EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH SPECIFICATIONS
AND THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH), WHEN THE HANDBOOK CONFLICTS WITH THE
SPECIFICATIONS, THE SPECIFICATIONS TAKE PRECEDENCE.
2. TEMPORARY SOIL STABILIZATION MUST BE APPLIED TO DENUDED AREAS WITHIN 14 DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION MUST BE APPLIED WITHIN 14 DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 21 DAYS. PERMANENT STABILIZATION MUST BE APPLIED WITHIN 14 DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE, BUT ARE TO BE LEFT DORMANT FOR MORE
THAN 21 DAYS.
3. DURING CONSTRUCTION OF THE PROJECT, TEMPORARY SOIL STOCK PILES AND BORROW AREAS MUST BE STABILIZED OR PROTECTED WITH AN APPROPRIATE SEDIMENT CONTROL MEASURE. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES BOTH ON SITE AS WELL AS AT OFF-SITE
BORROW AND DISPOSAL AREAS.
4. STABILIZATION MEASURES MUST BE APPLIED TO EARTHEN STRUCTURES SUCH AS SLOPES, DIKES, AND DIVERSIONS
IMMEDIATELY AFTER INSTALLATION.
5. EROSION AND SEDIMENT CONTROL DEVICES MUST BE CONSTRUCTED AND INSTALLED AS A FIRST STEP IN ANY LAND-DISTURBING ACTIVITY AND MUST BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
6. UNDERGROUND UTILITY LINES, MUST BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO
OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL MUST BE PLACED ON THE UPHILL SIDE OF TRENCHES WHENEVER POSSIBLE.
C. EFFLUENT FROM DEWATERING OPERATIONS MUST BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS
OR OFF-SITE PROPERTY.
D. LESS THAN ONE ACRE OF LAND DISTURBANCE MUST BE MAINTAINED AT ANY TIME. DISTURBED LAND WHERE WORK HAS
BEEN COMPLETED MUST BE STABILIZED ON A DAILY BASIS.
E. RESTABILIZATION MUST BE IN ACCORDANCE WITH THE ABOVE NOTES.
7. CONTRACTOR MUST DESIGN, INSTALL AND MAINTAIN POLLUTION PREVENTION MEASURES TO:
A. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER
WASH WATERS;
B. MINIMIZE THE EXPOSURE OF BUILDING MATERIALS, BUILDING PRODUCTS, CONSTRUCTION WASTES, TRASH, LANDSCAPE MATERIALS, FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS, SANITARY WASTE, AND OTHER MATERIALS PRESENT
ON-SITE TO PRECIPITATION AND TO STORMWATER;
C. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM SPILLS AND LEAKS AND IMPLEMENT CHEMICAL SPILL AND LEAK
PREVENTION AND RESPONSE PROCEDURES;
D. PROHIBIT THE DISCHARGE OF WASTEWATER FROM THE WASHOUT OF CONCRETE;
E. PROHIBIT THE DISCHARGE OF WASTEWATER FROM THE WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE
OILS, CURING COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS; AND
F. PROHIBIT THE DISCHARGE OF FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND
MAINTENANCE.
8. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVEMENT/ ROADS, PROVISIONS MUST BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED SURFACE, THE PAVEMENT MUST BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT MUST BE REMOVED BY
SHOVELING OR SWEEPING AND TRANSPORTED TO A DISPOSAL AREA.
9. THE CONTRACTOR MUST INSPECT THE EROSION CONTROL MEASURES AT LEAST ONCE IN EVERY TWO WEEK PERIOD AND AFTER EACH RUNOFF- PRODUCING STORM EVENT. DEFICIENCIES MUST BE CORRECTED IMMEDIATELY.
10. ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED BY THE CONTRACTING OFFICER IF DEEMED NECESSARY.
11. ALL EROSION CONTROL DEVICES MUST BE IN PLACE AND FUNCTIONAL AT ALL TIMES AND IF REMOVED FOR CONSTRUCTION
PROGRESS, MUST BE REPLACED BY THE CLOSE OF EACH WORK DAY.
12. FINAL REMOVAL OF EROSION CONTROL DEVICES MUST NOT OCCUR UNTIL THE CONTRACTING OFFICER DEEMS THE SITE
STABILIZED.
13. THE CONTRACTOR IS RESPONSIBLE FOR THE OFF-SITE DISPOSAL AND STABILIZATION OF EXCESS SOIL IN ACCORDANCE WITH VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. AN EROSION CONTROL PLAN MUST BE SUBMITTED BY THE CONTRACTOR TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL PRIOR TO ANY LAND DISTURBING ACTIVITIES AT ANY OFF-SITE DISPOSAL AREAS. THE SOIL MUST BE SPREAD, FERTILIZED, SEEDED AND MULCHED.
ALL EROSION CONTROL REQUIREMENTS LISTED ABOVE MUST BE FOLLOWED.
BUILDING V121
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
V4
Br ea kw at er P ie r\P
IE
RV
-1
-G
-1
.d wg
L
AY
O
UT
N
AM
E:
L ay ou t1 P
LO
TT
ED
: F rid ay
, A pr il 2 8,
- 1
1:
am U
SE
R:
tt ho m ps on
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
N/A
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
P R
E L
IM
IN
A
R Y
FINAL BACKCHECK SUBMITTAL - 2023/04/28
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
UNCLASSIFIED
PLAN
NORTH
SCALE: 1" = 60'
GENERAL ARRANGEMENT PLAN
V47 BREAKWATER PIER,
SEE SHEETS C-101,S-101, & S-102
EXIST. TIMBER SCREEN
EXIST. FLOATING DOCK
EXIST. BOAT RAMP
EXIST. BOAT HOUSE
EXIST. STORM WATER
OUTFALLS, TYP
EXIST. FLOATING DOCK
EDGE OF
EXIST. WHARF
EXIST. GUARDRAIL, TYP
EXIST. CONC PAVEMENT
WILLOUGHBY BAY
AREA OF SELECT DEMO,
SEE SHEET SD101
GENERAL SHEET NOTES:
1. FOR GEOTECHNICAL INVESTIGATIONS PLAN, SEE SHEET B-101.
2. FOR EXISTING CONDITIONS PLAN, SEE SHEET V-101.
GE
NE
RA
L A
RR
AN
GE
ME
NT
P
LA
N
BA TNT2 RDW
AS NOTED
12869680
G-101
120'0 60'
EXISTING PILE CAP
EXISTING HANDRAIL
CONTRACTOR
PARKING AND
MATERIAL
STORAGE AREA
CONTRACTOR
PERSONNEL
ENTRANCE GATE
CONTRACTOR TRUCK
ENTRANCE GATE
V 47
BUILDING
V 29
BUILDING
V 53
BUILDING
V 52
BUILDING
SECURITY FENCE
AIRFIELD FENCE
WB-2 WB-5
WB-6WB-4WB-3
20B-01
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
V4
Br ea kw at er P ie r\P
IE
RV
-1
-B
-1
.d wg
L
AY
O
UT
N
AM
E:
L ay ou t1 P
LO
TT
ED
: F rid ay
, A pr il 2 8,
- 1
1:
am U
SE
R:
tt ho m ps on
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
N/A
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
P R
E L
IM
IN
A
R Y
FINAL BACKCHECK SUBMITTAL - 2023/04/28
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
UNCLASSIFIED
GENERAL SHEET NOTES:
1. GEOTECHNICAL BORING LOGS WERE PROVIDED BY GET SOLUTIONS,
INC. IN THE "REPORT OF SUBSURFACE EXPLORATION AND
GEOTECHNICAL SERVICES", DATED FEBRUARY 15, 2021. FOR BORING
LOGS SEE B-601 AND B-602.
2. HYDROGRAPHIC SURVEY CONDUCTED BY NAVY IN MARCH 2015.
DEPTH OF SOUNDINGS SHOWN HEREIN ARE IN FEET AND REFER TO
NOAA MEAN LOWER LOW WATER (MLLW) DATUM.
BORING LOCATION, TYP,
SEE NOTE 1
PLAN
NORTH
SCALE: 1" = 60'
GEOTECHNICAL INVESTIGATIONS PLAN
G-101
EXIST. TIMBER SCREEN
EXIST. FLOATING DOCK
EXIST. BOAT RAMP
EXIST. BOAT HOUSE
EXIST. STORM WATER
OUTFALLS, TYP
EXIST. FLOATING DOCK
EDGE OF
EXIST. WHARF
EXIST. GUARDRAIL, TYP
EXIST. CONC PAVEMENT
WILLOUGHBY BAY
V47 BREAKWATER PIER
HYDROGRAPHIC SPOT
ELEV, TYP, SEE NOTE 2
GE
OT
EC
HN
IC
AL
IN
VE
ST
IG
AT
IO
NS
P
LA
N
BA TNT2 MEW
AS NOTED
12869681
B-101
EXISTING PILE CAP
EXISTING HANDRAIL
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
V4
Br ea kw at er P ie r\P
IE
RV
-1
-B
-6
.d wg
L
AY
O
UT
N
AM
E:
L ay ou t1 P
LO
TT
ED
: F rid ay
, A pr il 2 8,
- 1
1:
am U
SE
R:
tt ho m ps on
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
N/A
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
P R
E L
IM
IN
A
R Y
FINAL BACKCHECK SUBMITTAL - 2023/04/28
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
UNCLASSIFIED
GENERAL SHEET NOTE:
FOR APPROXIMATE BORING LOCATIONS, SEE SHEET B-101.
BO
RI
NG
LO
GS
SH
EE
T 1 O
F
BA TNT2 MEW
AS NOTED
12869682
B-601
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
V4
Br ea kw at er P ie r\P
IE
RV
-1
-B
-6
.d wg
L
AY
O
UT
N
AM
E:
L ay ou t1 P
LO
TT
ED
: F rid ay
, A pr il 2 8,
- 1
1:
am U
SE
R:
tt ho m ps on
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
N/A
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
P R
E L
IM
IN
A
R Y
FINAL BACKCHECK SUBMITTAL - 2023/04/28
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
UNCLASSIFIED
GENERAL SHEET NOTE:
FOR APPROXIMATE BORING LOCATIONS, SEE SHEET B-101.
BO
RI
NG
LO
GS
SH
EE
T 2 O
F
BA TNT2 MEW
AS NOTED
12869683
B-602
W
W W W
W W
W W
A
A
A
A
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
V4
Br ea kw at er P ie r\P
IE
RV
-1
-V
-1
.d wg
L
AY
O
UT
N
AM
E:
L ay ou t1 P
LO
TT
ED
: F rid ay
, A pr il 2 8,
- 1
1:
am U
SE
R:
tt ho m ps on
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
N/A
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
P R
E L
IM
IN
A
R Y
FINAL BACKCHECK SUBMITTAL - 2023/04/28
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
UNCLASSIFIED
PLAN
NORTH
SCALE: 1" = 60'
EXISTING CONDITIONS PLAN
G-101
EXIST. STORM WATER
OUTFALLS, TYP
EXIST. GUARDRAIL, TYP
EXIST. CONC PAVEMENT
GENERAL SHEET NOTE:
1. HYDROGRAPHIC SURVEY CONDUCTED BY NAVY IN MARCH 2015. DEPTH
OF SOUNDINGS SHOWN HEREIN ARE IN FEET AND REFER TO THE NOAA
MEAN LOWER LOW WATER (MLLW) DATUM.
WILLOUGHBY BAY
HYDROGRAPHIC SPOT
ELEV, TYP, SEE NOTE 1
EX
IS
TI
NG
C
ON
DI
TI
ON
S
PL
AN
BA WBT MEW
AS NOTED
12869684
V-101
EXIST. TIMBER SCREEN
EXIST. FLOATING DOCK
EXIST. BOAT RAMP
EXIST. BOAT HOUSE
EXIST. FLOATING DOCK
EDGE OF
EXIST. WHARF
EXISTING PILE CAP
EXISTING HANDRAIL
EXPANSION JOINT
SECURITY FENCE
SECURITY FENCE
SLIDING GATE
8" WATER
STORM DRAIN
PIPING, TYP
UNDERGROUND
COMMUNICATION,
TYP
UNDERGROUND
ELECTRIC, TYP
UNDERGROUND
COMPRESSED
AIR, TYP
1.5" WATER
3"
TOP OF EXIST
PAVEMENT
4'- 6"
4'- 0"
CROWN TOP OF
CONC FOR DRAINAGE
8"Ø SCH 80 GALV STL
PIPE, FILL W/ CONC &
COVER WITH SMOOTH
HDPE, YELLOW SLEEVE
1" CROWN
1'-6"Ø CONC FOOTING
#4/0 AWG BARE COPPER
GROUND CONDUCTOR
TO ADJACENT
BOLLARD/EQUIPMENT RACK
650 PSI CONC,
8" THICK
6" VDOT STD #57
AGGREGATE
BASE COURSE
#4 @ 14" O.C., EA WAY
CENTERED IN SLAB
PLACE CONSTRUCTION JOINTS ON 10 FOOT CENTERS.
COMPACTED SUBGRADE TO
95% STANDARD PROCTOR
MAX DRY DENSITY
12"
TYP
EXISTING PAVEMENT
DOWEL #6 BARS INTO
EXISTING CONC.
@ 12" O.C. ALL SIDES
CONC. PAVEMENT SECTION, SEE
DETAIL B1 THIS SHEET.
UTILITY OVER BEDDING, SEE PIPE
BEDDING DETAIL THIS SHEET
UNDISTURBED SUBGRADE
SAW CUT IN NEAT STRAIGHT LINES-BOTH SIDES
(PROTECT SAW EDGE FROM DAMAGE. REPAIR AS
NEEDED AT NO ADDITIONAL EXPENSE)
TRENCH WIDTH VARIES
COMPACTED BACKFILL MATERIAL
12"
TYP
CONCRETE PAVEMENT REPAIR
12" 12"
D/2 D D/2
1/10 D
MIN.
TRENCH WIDTH
PAVEMENT
COMPACTED
BACKFILL MATERIAL
UNDISTURBED
SUBGRADE
6"
VARIES
FIN.GRADE
SEE PAVEMENT
PATCH DETAIL B1
FOR CONCRETE
AND A4 FOR
ASPHALT THIS
SHEET.
NOTE: DEPTH = 6", UNLESS OTHERWISE INDICATED.
VDOT STD. #57
AGGREGATE
8"
C JOINTL
FULL WIDTH KEY 16" LONG PLAIN #6
DOWEL @ 12" O/C
FELT & ASPHALT RIBBON OR
ASPHALT BOARD STRIP. SAW
OUT AFTER FINISHING & SEAL.
(15' O/C MAX)
JOINT SEALANT
1/3 C
ON
C.
TH
IC
KN
ES
S 1/2
1/2"
8"
4 1 /2"
JOINT SEALANT
16" LONG SMOOTH
#5 DOWEL @ 12" O.C.
1/2
1/8R
1/2" 3"
MAX
PAINT & GREASE
FREE END
FIXED END
9 1/8"8 1/8"1" MIN
12"
D/2 D
6"
12"
D D/2
1/10 D
MIN.
TRENCH WIDTH
PAVEMENT
6"
NOTE: DEPTH = 6", UNLESS OTHERWISE INDICATED.
VARIES,
TYP
SE
E
NO
TE
SE
E
NO
TE
12"
MIN
COMPACTED
BACKFILL
MATERIAL
UNDISTURBED
SUBGRADE
SEE PAVEMENT
PATCH DETAIL
C3 THIS SHEET
VDOT STD. #57
AGGREGATE
FINISHED
GRADE
TACK ASPHALT BETWEEN ALL LAYERS AND EDGES
2" VDOT STD. SURFACE COURSE
MIX TYPE SM-12.5D
COMPACTED SUBGRADE
8" VDOT STD. BASE COURSE
MIX TYPE BM-25A
10" MIN VDOT STD. AGGREGATE SUBBASE COURSE
TYPE I, GRADING 21A
BITUMINOUS SEAL IN ACCORDANCE WITH VDOT
STANDARD WHEN ASPHALT ABUTS EXIST PAVEMENT
EXIST
PAVEMENT
3'- 0"
CAST IRON FRAME WITH 30"X30"
SOLID LID WITH SPRING ASSISTED
HINGES, CENTERED ON METER
PIPE SUPPORT15
3'-0"
12" MIN CORE WALL AND
PROVIDE MECHANICAL
LINK SEAL (TYPICAL).
3'-0"
REINFORCE CONCRETE WALLS, BASE
AND TOP.
1.5" BALL VALVE
#4 @ 12" O.C. TYP.#4 @ 12" O.C.
#4 @ 12" O.C.
#4 @ 9" O.C.
TYPICAL
#4 @ 9" O.C.
#4 @ 12" O.C., E.W., E.F. TYP.
6"
6"
8"
#4 @ 9" O.C.
#4 @ 9" O.C.
TYPICAL
(3) #4 @ 4" O.C.
FLOW FLOW
8" #57 AGGREGATE
1" 3"
4"
4"
(TYP)
1.5"
WATER
COMPRESSED AIR
PIPE AND VALVE.
SEE A4 / M-501
FLOW
COMPRESSED AIR
PIPE AND VALVE.
SEE A4 / M-501
1.5" BALL VALVE
1.5"
WATER
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
V4
Br ea kw at er P ie r\P
IE
RV
-1
-C
-5
.d wg
L
AY
O
UT
N
AM
E:
L ay ou t1 P
LO
TT
ED
: M on da y, M ay
1,
- 1 0:
am
U
SE
R:
b ay to da
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
N/A
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
P R
E L
IM
IN
A
R Y
FINAL BACKCHECK SUBMITTAL - 2023/04/28
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
UNCLASSIFIED
SCALE:NTS
PAVEMENT DESIGNC1 C-101 SCALE:NTS
BOLLARD DETAILC2 C-101
SCALE:NTS
SINGLE PIPE BEDDING DETAILB2
SCALE:NTS
TRENCHING PAVEMENT REPAIR DETAILA3SCALE:NTS
CONCRETE PAVEMENT JOINT DETAILSA1
CI
VI
L D
ET
AI
LS
BA WBT MEW
AS NOTED
12869686
C-501
SCALE:NTS
DUAL PIPE BEDDING DETAILB1
2'- 6"
M
IN
CONTROL JOINTCONSTRUCTION JOINT
EXPANSION JOINT
SCALE:NTS
ASPHALT PAVEMENT SECTIONA4
SCALE:NTS
VALVE VAULT DETAILC3 C-101
C-101 C-101
C-101 C-101 C-101
W W W W W W W W W W W W W W W W W W
A A
A
W W
W W
W W W
W
W W W
W W
W W
A
A
A
A A
A
W
W W W
A
PLAN
NORTH
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
V4
Br ea kw at er P ie r\P
IE
RV
-1
-C
-1
.d wg
L
AY
O
UT
N
AM
E:
L ay ou t1 P
LO
TT
ED
: F rid ay
, A pr il 2 8,
- 1
1:
am U
SE
R:
tt ho m ps on
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
N/A
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
CHIEF ENG/ARCH
FIRE PROTECTION
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
P R
E L
IM
IN
A
R Y
FINAL BACKCHECK SUBMITTAL - 2023/04/28
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
UNCLASSIFIED
FACE OF EXIST. BULKHEAD
EXIST. SHEET PILE BULKHEAD BELOW
EXIST. CONC
PAVEMENT
EXIST. HANDRAIL, TYP
MARINA DISTRIBUTION SUBSTATION &
PLATFORM, SEE ELECTRICAL DRAWINGS
MARINA PEDESTAL 5MARINA PEDESTAL 4
MARINA PEDESTAL 1
MARINA PEDESTAL 3
1. 1 1/2" SCHEDULE 40 PVC WATER LINE IN UTILITY
TRENCH ON PIPE SUPPORT. SEEUTILITY NOTES.
2. 3/4" SCHEDULE 40 PVC WATER LINE IN UTILITY
TRENCH ON PIPE SUPPORT. SEE UTILITY NOTES.
3. 1 1/2" x 3/4" REDUCING TEE.
4. 1 1/2" X 3/4" REDUCER.
5. 3/4" ELBOW AND VERTICAL POLYETHYLENE WATER
LINE RISER TO MARINA PEDESTAL. SEE B4 / E-501.
6. DUAL 3/4" STAINLESS STEEL HOSE BIBS WITH 1/4
TURN BALL VALVES. SUBMIT ALL MATERIALS FOR
APPROVAL. HOSE BIBS MUST BE COMPATIBLE WITH
APPROVED MARINE PEDESTAL. SEE B4 / E-501.
7. 1 1/2" WATER LEVER OPERATED BALL VALVE
LOCATED IN VALVE VAULT. SEE C3 / C-501 FOR
VAULT DETAIL AND PIPING ORIENTATION.
COMPRESSED AIR PIPING IS ALSO LOCATED IN
VAULT.
8. 1 1/2" TYPE "K" COPPER WATER PIPING. PROVIDE
MINIMUM OF 2'-6" OF COVER ON PIPE. SEE DETAILS
B1 / C-501 AND B2 / C-501. LOCATE PIPE IN SAME
TRENCH WITH COMPRESSED AIR PIPING WHEN
PIPES ARE ADJACENT.
9. CONNECT TO EXISTING 1 1/2" TYPE "K" COPPER
WATER PIPING.
10. REMOVE EXISTING 1.5" WATER 90 DEGREE BEND
AND INSTALL 1.5"x1.5" TEE CONNECTING EXISTING
WATER SERVICE ON RANGER AVENUE AND
EXISTING SERVICE BRANCH TO WATERFRONT
PEDESTAL ALONG WITH NEW 1.5" COPPER PIPE
SERVICE TO THE NORTH TO SERVE NEW
BREAKWATER PIER.
11. DOWNSTEAM OF VALVE ROUTE COPPER PIPE UP
FROM 2'-6" OF COVER TO ENTER UTILITY TRENCH
AT EDGE OF STRUCTURAL SLAB. SEE A4 / S-503.
AFTER ENTERING UTILITY TRENCH TRANSFER
PIPING MATERIAL TO PVC.
12. COMPRESSED AIR PIPING. SEE MECHANICAL
4311 2TYP
33 3
1 MARINA PEDESTAL 2
PLAN
NORTH
SCALE: 1" = 60'
OVERALL SITE PLAN
G-101
TO PIER - SEE C1 / C - 101
FOR CONTINUATION
SCALE: 1" = 10'
PIER PLANC1 G-101 0 20'10'
C1
C-101 PIER PLAN
SEE WINTERIZATION NOTES
EXISTING 2" COMPRESSED AIR PIPING.
SEE MECHANICAL FOR COMPRESSED
AIR WORK
EXISTING 1 1/2"
WATER SERVICE
EXISTING 1 1/2"
WATER SERVICE
OV
ER
AL
L S
IT
E
PL
AN
BA WBT MEW
AS NOTED
12869685
C-101
2 TYP
6 TYP OF 5
EXISTING 1 1/2"
WATER SERVICE
SEE OVERALL SITE PLAN
FOR CONTINUATION
C2 C-501
BOLLARD
x4, TYP
120'0 60'
EXISTING
HANDRAIL
EXIST. GUARD RAIL, TYP
GRASS GRASS
EXIST. EXPANSION JOINT
EXIST.
EXPANSION
JOINT
A4 C-501
ASPHALT
PAVEMENT
PATCH, TYP
EXIST. CONC
PAVEMENT
CONC. SLAB
SEE STRUCT
EXIST.
CRUMBLING
CONC
A3 C-501
CONCRETE PAVEMENT
REPAIR, TYP
SEE PAVEMENT NOTE
PAVEMENT NOTE:
SAWCUT AND DEMOLISH CONCRETE PAVING TO
INSTALL COMMUNICATIONS AND ELECTRICAL
DUCTBANKS AND MANHOLES INDICATED ON
ELECTRICAL DRAWINGS. PATCH PAVEMENT IN
ACCORDANCE WITH DETAIL A3 / C-501. PROVIDE
CONTROL JOINTS IN THE CONCRETE PATCH THAT
ALIGN WITH JOINT PATTERN IN EXISTING CONCRETE
PAVEMENT. PROVIDE EXPANSION JOINTS FOR
EVERY 50 LINEAR FEET OF CONCRETE PAVEMENT
PATCH. SEE A1 / C-501 FOR CONCRETE JOINT
DETAILS.
WORK NOTES: WINTERIZATION NOTES:
1. OPEN ALL DOCKSIDE WATER OUTLETS.
2. CLOSE WATER SUPPLY VALVE AT BUILDING.
3. CONNECT COMPRESSED AIR TO WATER SYSTEM
AT BUILDING.
4. BLOW WATER FROM PIPES.
5. LEAVE DOCKSIDE WATER OUTLETS OPEN.
6. DISCONNECT COMPRESSED AIR FROM WATER
SYSTEM.
7. PRIOR TO REUSING WATER SYSTEM, FLUSH
WATER SYSTEM THOROUGHLY.
UTILITY NOTES:
1. SUPPORT WATER PIPE IN UTILITY TRENCH WITH
GALVANIZED STEEL PIPE SUPPORTS SIZED AND
SPACED PER MANUFACTURER'S
RECOMMENDATIONS FOR SIZE OF PIPE
INDICATED.
2. WHEN COMPRESSED AIR AND WATER PIPING
MUST CROSS WITHIN UTILITY TRENCH, WATER
MUST CROSS BENEATH THE COMPRESSED AIR
PIPING.
2'- 0"
'-0
4'-
7" 8'-
8 1 /2"
2'- 0"
8'-0"7'-5 1/2" 9'-9 1/2" 14'-5 3/4"
4'-11 1/2"33'-6"
PLAN
NORTH
SCALE: NTS
ENLARGED PLAN -
EXTENTS OF ASPHALT PAVEMENT PATCHA3 C-101
CONCRETE
APPROACH SLAB
ELECTRICAL
PLATFORM
UTILITY
TRENCH
A3 C-501
CONCRETE PAVEMENT
REPAIR, TYP
SEE PAVEMENT NOTE
3"
TOP OF EXIST
PAVEMENT
4'- 6"
4'- 0"
CROWN TOP OF
CONC FOR DRAINAGE
8"Ø SCH 80 GALV STL
PIPE, FILL W/ CONC &
COVER WITH SMOOTH
HDPE, YELLOW SLEEVE
1" CROWN
1'-6"Ø CONC FOOTING
#4/0 AWG BARE COPPER
GROUND CONDUCTOR
TO ADJACENT
BOLLARD/EQUIPMENT RACK
4,000 PSI CONC,
8" THICK
6" VDOT STD #57
AGGREGATE
BASE COURSE
#4 @ 14" O.C., EA WAY
CENTERED IN SLAB
PLACE CONSTRUCTION JOINTS ON 10 FOOT CENTERS.
COMPACTED SUBGRADE TO
95% STANDARD PROCTOR
MAX DRY DENSITY
12"
TYP
EXISTING PAVEMENT
DOWEL #6 BARS INTO
EXISTING CONC.
@ 12" O.C. ALL SIDES
CONC. PAVEMENT SECTION, SEE
DETAIL B1 THIS SHEET.
UTILITY OVER BEDDING, SEE PIPE
BEDDING DETAIL THIS SHEET
UNDISTURBED SUBGRADE
SAW CUT IN NEAT STRAIGHT LINES-BOTH SIDES
(PROTECT SAW EDGE FROM DAMAGE. REPAIR AS
NEEDED AT NO ADDITIONAL EXPENSE)
TRENCH WIDTH VARIES
COMPACTED BACKFILL MATERIAL
12"
TYP
CONCRETE PAVEMENT REPAIR
12" 12"
D/2 D D/2
1/10 D
MIN.
TRENCH WIDTH
PAVEMENT
COMPACTED
BACKFILL MATERIAL
UNDISTURBED
SUBGRADE
8"
VARIES
FIN.GRADE
SEE PAVEMENT
PATCH DETAIL B1
FOR CONCRETE
AND A4 FOR
ASPHALT THIS
SHEET.
NOTE: DEPTH = 8", UNLESS OTHERWISE INDICATED.
VDOT STD. #57
AGGREGATE
8"
C JOINTL
FULL WIDTH KEY 16" LONG PLAIN #6
DOWEL @ 12" O/C
FELT & ASPHALT RIBBON OR
ASPHALT BOARD STRIP. SAW
OUT AFTER FINISHING & SEAL.
(15' O/C MAX)
JOINT SEALANT
1/3 C
ON
C.
TH
IC
KN
ES
S 1/2
3/4"
8"
4 1 /2"
16" LONG SMOOTH
#5 DOWEL @ 12" O.C.
1/2
1/8R
3/4" 3"
MAX
JOINT SEALANT
PAINT & GREASE
FREE END
FIXED END
9 1/8"8 1/8"1" MIN
12"
D/2 D
8"
12"
D D/2
1/10 D
MIN.
TRENCH WIDTH
PAVEMENT
8"
NOTE: DEPTH = 8", UNLESS OTHERWISE INDICATED.
VARIES,
TYP
SE
E
NO
TE
SE
E
NO
TE
12"
MIN
COMPACTED
BACKFILL
MATERIAL
UNDISTURBED
SUBGRADE
SEE PAVEMENT
PATCH DETAIL
C3 THIS SHEET
VDOT STD. #57
AGGREGATE
FINISHED
GRADE
TACK ASPHALT BETWEEN ALL LAYERS AND EDGES
2" VDOT STD. SURFACE COURSE
MIX TYPE SM-12.5D
COMPACTED SUBGRADE
8" VDOT STD. BASE COURSE
MIX TYPE BM-25A
10" MIN VDOT STD. AGGREGATE SUBBASE COURSE
TYPE I, GRADING 21A
BITUMINOUS SEAL IN ACCORDANCE WITH VDOT
STANDARD WHEN ASPHALT ABUTS EXIST PAVEMENT
EXIST
PAVEMENT
3'- 0"
CAST IRON FRAME WITH 30"X30"
SOLID LID WITH SPRING ASSISTED
HINGES, CENTERED ON METER
PIPE SUPPORT15
3'-0"
12" MIN CORE WALL AND
PROVIDE MECHANICAL
LINK SEAL (TYPICAL).
3'-0"
REINFORCE CONCRETE WALLS, BASE
AND TOP.
1.5" BALL VALVE
#4 @ 12" O.C. TYP.#4 @ 12" O.C.
#4 @ 12" O.C.
#4 @ 9" O.C.
TYPICAL
#4 @ 9" O.C.
#4 @ 12" O.C., E.W., E.F. TYP.
6"
6"
8"
#4 @ 9" O.C.
#4 @ 9" O.C.
TYPICAL
(3) #4 @ 4" O.C.
FLOW FLOW
8" #57 AGGREGATE
1" 3"
4"
4"
(TYP)
1.5"
WATER
COMPRESSED AIR
PIPE AND VALVE.
SEE A4 / M-501
FLOW
COMPRESSED AIR
PIPE AND VALVE.
SEE A4 / M-501
1.5" BALL VALVE
1.5"
WATER
FI
LE
N
AM
E:
Q
:\N O
R\
0-
\c ad d\
_A ct ive
V4
Br ea kw at er P ie r\P
IE
RV
-1
-C
-5
.d wg
L
AY
O
UT
N
AM
E:
L ay ou t1 P
LO
TT
ED
: F rid ay
, A pr il 2 8,
- 1
1:
am U
SE
R:
tt ho m ps on
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
N/A
EAW/IAS
V -4
B
R E
A K
W A
TE
R
P
IE
R N
A V
A L
S
TA
TI
O
N N
O R
FO
LK
N O
R
FO
LK
, V
IR
G
IN
IA
1605379
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
, V
A
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C M
ID
LA
N T
D C
B L
N A
V A
L S
TA
TI
O N
N O
R
FO
LK
N O
R
FO
LK
, V
A
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N O
T
FO
R C
O N
S
TR
U C
TI
O
N
P R
E L
IM
IN
A
R Y
FINAL BACKCHECK SUBMITTAL - 2023/04/28
UN
CL
AS
SI
FI
ED
UNCLASSIFIED
UNCLASSIFIED
SCALE: NTS
PAVEMENT DESIGNC1 C-101 SCALE: NTS
BOLLARD DETAILC2 C-101
SCALE: NTS
SINGLE PIPE BEDDING DETAILB2
SCALE: NTS
TRENCHING PAVEMENT REPAIR DETAILA3SCALE: NTS
CONCRETE PAVEMENT JOINT DETAILSA1
CI
VI
L D
ET
AI
LS
BA WBT MEW
AS NOTED
12869686
C-501
SCALE: NTS
DUAL PIPE BEDDING DETAILB1
2'- 6"
M
IN
CONTROL JOINTCONSTRUCTION JOINT
EXPANSION JOINT
SCALE: NTS
ASPHALT PAVEMENT SECTIONA4
SCALE: NTS
VALVE VAULT DETAILC3 C-101
C-101 C-101
C-101 C-101 C-101
D D
D D bd bd
6d (3'' MIN)b b
BAR
SIZE
D 1 1/2''
#3
2''
#4
2 1/2''
#5
4 1/2''
#6
5 1/4''*
#7
6d (3'' MIN)
90° HOOK 135° HOOK
* ASTM A767 REQUIRES THAT BARS BENT COLD PRIOR TO HOT DIP GALVANIZING
MUST BE FABRICATED TO A MINIMUM BEND DIAMETER EQUAL TO 7 IN. FOR #7 BAR.
SCALE: NTS
TYPICAL STIRRUPS AND TIE HOOKSD4
CLASS B LAP SPLICE LENGTHS (INCHES)
ALL OTHER BARSTOP BARS
#3 1722
BAR
SIZE
#4 2229
#5 2836
#6 3343
#7 4863
#8 5572
#9 6281
#10 7091
#11 78101
NOTES:
BASED ON f'c = 5,000 PSI
SCALE: NTS
BAR SPLICE LENGTHSA4
BAR SPLICE LENGTHS
1. SPLICE LENGTHS SHOWN APPLY TO BARS WITH A
MINIMUM SPACING OF 6 INCHES ON CENTER.
2. FOR BARS SPACED LESS THAN 6 INCHES ON CENTER
USE THE FOLLOWING LAP SPLICE LENGTHS:
VERT BARS AND BOTT BARS
#6 AND SMALLER ----- 50 db LARGER THAN #6 ----- 60 db
ALL OTHERS BARS
#6 AND SMALLER ----- 60 db LARGER THAN #6 ----- 80 db db = BAR NOMINAL DIAMETER
3. DEVELOPMENT LENGTH OF BARS TO BE 77% OF LAP
SPLICE LENGTH.
4. "TOP BARS" ARE HORIZONTAL REINFORCEMENTS
WITH MORE THAN 12 INCHES OF FRESH CONCRETE
CAST BELOW.
D=6d FOR #3 THRU #8
D=8d FOR #9 THRU #11
D=10d FOR #14 AND #18 b b b
NOTES:
STANDARD HOOKS
SIZE LDH (IN.) W/
TIES
LDH (IN.) W/O
TIES D
#3 6" 6" 2 1/4" #4 6" 9" 3" #5 8" 13" 3 3/4" #6 10" 16" 4 1/2" #7 13" 21" 5 1/4"* #8 16" 25" 6"* #9 19" 30" 9 1/2" #10 23" 36" 10 3/4" #11 27" 42" 12"
SCALE: NTS
TYPICAL REINFORCING HOOKSB4
D
D
D
90° HOOK
180° HOOK
45° BEND
CRITICAL
SECTION
db db db d b
LDH
4db OR 2 1/2'' MIN
LDH
D
D
1:6 BEND
db
CRITICAL
SECTION
NOTES:
1. BASED ON f'c = 5,000 PSI
2. ASTM A767 REQUIRES THAT BARS BENT
COLD PRIOR TO HOT DIP GALVANIZING
MUST BE FABRICATED TO A MINIMUM BEND
IAMETER EQUAL TO 7 IN. FOR #7 BAR AND 8
FOR #8 BAR.
3. THE ABOVE HOOK LENGTH APPLY TO BARS
WITH SIDE COVER GREATER THAN OR
EQUAL TO 2-1/2 IN AND FOR 90° HOOK WITH
COVER ON BAR EXTENSION BEYOND HOOK
GREATER THAN OR EQUAL TO 2 IN. IF THE
ABOVE CRITERIA DOES NOT APPLY; LDH
MUST BE…