24B2503 Amnd 0004.pdf

PDF 154 KB Posted

Attached to
Demo TC 761 and 1042 Federal contract opportunity
Solicitation number
N4008524B2503
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is an amendment to Solicitation N4008524B2503 for the demolition of Buildings TC 761 and 1042 at Camp Lejeune. The amendment provides answers to six questions from prospective offerors, covering topics such as building square footage, disposal of demolition debris, utility coordination, permitting requirements, and the status of Building 1042. Key details include:

  • There are no dump fees at the Camp Lejeune landfill for disposal of demolition debris.
  • No air monitoring for final clearance is required, as the buildings will be demolished and not reoccupied.
  • Utility locates, removals, and outage requests must be coordinated by the contractor.
  • An asbestos removal permit from the North Carolina Health Hazards Control Unit is required prior to demolition, even if no asbestos is present.
  • The debris from the already-demolished Building 1042 is considered contaminated and must be disposed of as asbestos-containing material.

View the file

Other files for this federal contract opportunity

Other files attached to Demo TC 761 and 1042, newest first.
File Type Posted
AMND 0003.pdf PDF
AMND 0002.pdf PDF
AMND 0001.pdf PDF
N4008524B240018 RDwgs.pdf PDF
DemoTC761_1042.pdf PDF
N4008524B0018 Specs.pdf PDF
SOL 24B2503 Demo.pdf PDF
REFUGE DISPOSAL.pdf PDF
Asbestos Report - TC761.pdf PDF
Asbestos Report - 1042.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR6035619

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Questions and Answ ers

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-May-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008524B2503

X 9B. DATED (SEE ITEM 11)

25-Apr-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-May-2024

CODE

NAVFACSYSCOM MID-ATLANTIC

ROICC CAMP LEJEUNE

1107A BIRCH STREET

CAMP LEJEUNE NC 28547-2521

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008524B2503

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDEMENT 0004

Question 1: Could you please provide the square footage of Bldg TC761, and what was the square footage of Bldg 1042 prior to demolishing ?

Answer 1: Area to be obtained from reference drawings provided.

Question 2: Should the landfill rates be included with the demo bid or will the dump fees be absorbed by Camp Lejeune's Landfill?

Answer 2: There are no dump fees at the MCBCL Landfill.

Question 3: Air monitoring for final clearance should not be required because the structures are going to be demolished and not reoccupied. Please confirm.

Answer 3: No air monitoring for final clearance required.

Question 4. We will need to coordinate with a POC from Camp Lejeune to ensure that all utilities are located, terminated, and disconnected properly. Please confirm understanding of such.

Answer 4: Utility locates and removal are to be performed by the Contractor in accordance with the provided reference drawings. Utility outages and terminations will require the Contractor to submit a standard outage request.

Question 5: Is there a certain permit required for the demo work on the base, and if so what is the cost for such?

Answer 5: The Health Hazards Control Unit (HHCU) of the N.C. Department of Health & Human Services, Division of Public Health, must be notified of plans to demolish a building, including residences demolished for commercial or industrial expansion. Notification of demolition is required by law even if no asbestos is present in the building. The removal of asbestos containing material must be done only by N.C.-accredited asbestos professionals. The Contractor must obtain an asbestos removal permit from the HHCU prior to any renovation project that will disturb more than 35 cubic feet, 160 square feet, or 260 linear feet of regulated asbestos-containing material. Demolition notifications and asbestos removal permit applications are to be submitted using the application form (DHHS 3768). The application form can be found HHCU website or by contacting the HHCU. Note:

Obtaining a demolition permit from the local city or county building inspections department does NOT satisfy or meet the notification requirements of the HHCU.

Question 6: Since Bldg. 1042 is already demolished, then all piled debris MUST be disposed of as ACM. All debris has been co-mingled; Therefore, the entire debris piles are considered contaminated.

Answer 6: Co-mingled debris must be disposed of as ACM. Elements of the foundation that are not co-mingled are to be disposed of as non-hazardous materials.

(End of Summary of Changes)