This document provides details for a federal solicitation to renovate a reservoir structure and replace a booster pump station. The Naval Facilities Engineering Command is seeking bids to perform work under solicitation number N4008523R2760. Interested parties should review the attached engineering drawings, which provide specifications for renovating the existing reservoir to address structural issues and replace aging pumps. Bids are due by the end of July 2023 and the contract is expected to be awarded in September 2023. The selected contractor will be responsible for demolition, structural repairs, new pump installation, and site work to upgrade this critical water infrastructure asset.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVAL STATION - NORFOLK, VIRGINIA
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND ~ MID-ATLANTIC
PUBLIC WORKS DEPARTMENT
FACILITIES ENGINEERING AND ACQUISITION DIVISION
NORFOLK, VIRGINIA
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
AS NOTED
GI001
B U
IL
D
IN
G
S P
-9
C O
V E
R S
H E
E T
ALP
12,885,727
DAS DAS
04/14/2023
HAI HUYNH - CNIC
J.B. JONES - UEM
R E
N O
V A
TE
R
E S
E R
V O
IR
S
TR
U
C
TU
R E
R
E P
LA
C
E B
O O
S
TE
R P
U M
P S
TA
TI
O N
DUSTIN A. SCHULZE, R.A.
1674978
N/A
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
S.M. SWEENEY, P.E.
ALP
N/A
M
ID
L A
N T
P
W D
N O
R F
O L
K
BUILDING SP-90
RENOVATE RESERVOIR STRUCTURE & REPLACE BOOSTER PUMP STATION
S Y
M D
E S
C R
IP
T
I O N
D A
T E
A P
P R
WILLOUGHBY BAY
NAVAL SUPPORT
ACTIVITY
U.S. NAVAL STATION
SEWELLS POINT
NORFOLK
U.S. NAVAL
AIR STATION
CHESAPEAKE BAY
LITTLE CREEK
U.S. NAVAL
AMPHIBIOUS BASE
VA BEACH
OCEANA
NAVAL AIR
STATION
CHESAPEAKE
SOUTHERN BRANCH
EASTERN BRANCH
ST. JULIEN'S CREEK
U.S. NAVAL ANNEX
ELIZABETH RIVER
PORTSMOUTH
U.S. ARMY CRANEY
ISLAND DISPOSAL AREA
NANSEMOND RIVER
WESTERN BRANCH
CRANEY
ISLAND NAVY
DEPOT
PROJECT SITE
NORTH
ROOM
A1
A-201
ROOM IDENTIFIER
DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL TAG
ROOM NAME
ROOM NUMBER
EXTERIOR ELEVATION
INDICATOR
ELEVATION NUMBER
DIRECTION OF VIEW
SHEET WHERE DRAWN
A1
A-301
WALL / PARTIAL
BUILDING SECTION
INDICATOR
SECTION NUMBER
SHEET WHERE DRAWN
GENERAL PROJECT SYMBOLS
A1
A-301
BUILDING SECTION
INDICATOR
SECTION NUMBER
SHEET WHERE DRAWN
A1
A-301
BUILDING KEYNOTE INDICATOR
KEYNOTE NUMBER
A-901 PHOTOGRAPH
INDICATOR
PHOTOGRAPH NUMBER
SHEET WHERE SHOWN
A1
A-501
DETAIL NUMBER
SHEET REFERENCED FROM
TRUE NORTH
GRAPHIC SCALE
GRAPHIC SCALE
0 4' 8' 16'
VIEW NAME
SCALE: 1/8" = 1'-0"A1 (A-101)
0 4' 8' 16'
PLAN
NORTH
VIEW NAME
SCALE: 1/8" = 1'-0"
PLAN TITLE
SP236
SP237
SP90
SP113
NORTH
SP372
1ST VIEW STREET
EAST 'D
' STREET
'B' STREET
9TH
A V
E
10TH
A
V E
8TH
A
V E
SP69
SP28
SP401
8TH
A
V E
LU
M
B E
R
LA
N E
PROJECT SITE
BAY AVENUE
GATE 4
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
AS NOTED
GI002
B U
IL
D
IN
G
S P
-9
LI
S
T O
F S
H E
E
TS
, G E
N E
R A
L P
R O
JE
C
T N
O
TE
S , A
N D
S Y
M B
O
LS
ALP
12,885,728
DAS DAS
04/14/2023
HAI HUYNH - CNIC
J.B. JONES - UEM
R E
N O
V A
TE
R
E S
E R
V O
IR
S
TR
U
C
TU
R E
R
E P
LA
C
E B
O O
S
TE
R P
U M
P S
TA
TI
O N
DUSTIN A. SCHULZE, R.A.
1674978
N/A
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
S.M. SWEENEY, P.E.
ALP
N/A
M
ID
L A
N T
P
W D
N O
R F
O L
K
LIST OF SHEETS
SHEET NO.
NAVFAC DWG. NO. SHEET TITLENO. SHEET
GENERAL
1 GI001 12,885,727 COVER SHEET
2 GI002 12,885,728 LIST OF SHEETS, GENERAL PROJECT NOTES, AND SYMBOLS
CIVIL
3 C-001 12,885,729 CIVIL LEGEND, LINE TYPES, & ABBREVIATIONS
4 C-101 12,855,730 CIVIL DEMOLITION PLAN
5 C-102 12,855,731 CIVIL SITE PLAN
6 C-501 12,855,732 CIVIL DETAILS & PHOTOS
7 C-502 12,855,733 TYPICAL FENCE DETAILS
8 C-503 12,855,734 WATER DISTRIBUTION DETAILS
STRUCTURAL
9 S-001 12,885,735 STRUCTURAL NOTES AND PLAN LEGEND
10 S-002 12,885,736 STRUCTURAL NOTES - CONCRETE, STEEL
11 S-003 12,885,737 STRUCTURAL NOTES & ABBREVIATIONS
12 SD101 12,885,738 FOUNDATION PLAN - DEMOLITION
13 SD102 12,885,739 ROOF PLAN - DEMOLITION
14 SD103 12,885,740 SP90A - DEMOLITION PLAN & ELEVATIONS
15 S-101 12,885,741 FOUNDATION PLAN
16 S-102 12,885,742 ROOF PLAN
17 S-501 12,885,743 CONCRETE REPAIR DETAILS
18 S-502 12,885,744 GENERATOR PAD PLAN & SECTION
19 S-503 12,885,745 FRP LADDER DETAILS
ARCHITECTURAL
20 AD101 12,855,746 ROOF PLAN - DEMOLITION
21 AE101 12,855,747 ROOF PLAN & DETAILS
MECHANICAL
22 M-001 12,885,748 MECHANICAL LEGEND, ABBREVIATIONS AND NOTES
23 MD101 12,885,749 SP90A DEMOLITION MECHANICAL PLAN
24 MD102 12,885,750 PUMP ROOM MECHANICAL PLAN - DEMOLITION
25 MD103 12,885,751 MECHANICAL GROUND FLOOR PLAN - DEMOLITION
26 MP101 12,885,752 SP90A NEW WORK MECHANICAL PLAN
27 MP102 12,885,753 PUMP ROOM MECHANICAL PLAN - NEW WORK
28 MP103 12,885,754 MECHANICAL GROUND FLOOR PLAN - NEW WORK
29 MI601 12,885,755 MECHANICAL SCHEDULES
ELECTRICAL
30 E-001 12,885,756 ELECTRICAL SYMBOLS, LEGEND, ABBREVIATIONS, AND NOTES
31 ES101 12,885,757 ELECTRICAL SITE PLAN
32 ES501 12,885,758 ELECTRICAL SITE DETAILS
33 ED101 12,885,759 FLOOR PLAN - DEMOLITION
34 EP101 12,885,760 FLOOR PLAN - POWER
35 EP501 12,885,761 ELECTRICAL DETAILS
36 EP601 12,885,762 ONE-LINE DIAGRAM
37 EP701 12,885,763 PANELBOARD SCHEDULES
VICINITY MAP
GENERAL PROJECT NOTES
LOCATION MAP
3 FIELD VERIFY EXISTING DIMENSIONS, PRIOR TO ORDERING MATERIALS OR
BEGINNING DEMOLITION.
4 WHERE EXISTING CONSTRUCTION IS DAMAGED BY CONSTRUCTION
REQUIRED BY THESE DOCUMENTS. REPAIR THE DAMAGED ITEM(S) WITH
MATERIALS TO MATCH THE ADJACENT MATERIAL, TEXTURE AND COLOR.
5 ALL ITEMS NOT SHOWING AS "EXISTING" MUST BE PROVIDED AND
INSTALLED UNDER THE REQUIREMENTS OF THIS CONTRACT.
6 OBTAIN OUTAGE APPROVAL PRIOR TO STARTING WORK THAT MAY
INTERRUPT UTILITIES, OR OPERATIONAL SERVICES. ALLOW UP TO 15 DAYS
FOR OUTAGE COORDINATION AND APPROVAL.
7 CONSTRUCTION WILL BE ACCOMPLISHED IN AND AROUND AREAS WHICH
WILL REMAIN OPERATIONAL. AVOID INTERFERENCE WITH THE
OPERATIONAL WORK ROUTINE.
8 THE GOVERNMENT IS NOT RESPONSIBLE FOR THE METHODS, TECHNIQUES
AND SEQUENCES OF PROCEDURES TO PERFORM THE WORK.
SUPERVISION OF THE WORK IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
9 COMPLY WITH ALL SAFETY PRECAUTIONS AND REGULATIONS DURING THE
WORK, INCLUDING DODINST 6055.1 AND APPLICABLE OCCUPATIONAL
SAFETY AND HEATH ADMINISTRATION (OSHA) SAFETY AND HEATH
STANDARDS. THE STRUCTURAL DESIGNER OF RECORD (DOR) WILL NOT
ADVISE ON NOR ISSUE DIRECTION AS TO SAFETY PRECAUTIONS AND
PROGRAMS.
10 PERFORM A PRE-BID SITE VISIT TO ASCERTAIN CONDITIONS WHICH MAY
ADVERSELY AFFECT THE WORK OR COST THEREOF.
11 ALL WORK TO INSTALL GENERATOR REQUIRES THE TRANSFORMER TO BE
DE-ENERGIZED. COORDINATE SHUTDOWN PERIODS WITH THE
CONTRACTING OFFICER AND UTILITIES AND ENERGY MANAGEMENT
DIVISION, CODE PW6. DURING SHUTDOWN PERIODS, PROVIDE TEMPORARY
LIGHTING AND POWER TO FACILITATE CONSTRUCTION.
12 ALL ITEMS NOTED TO BE DEMOLISHED OR REMOVED WILL BECOME THE
PROPERTY OF THE CONTRACTOR AND MUST BE REMOVED FROM
GOVERNMENT PROPERTY, UNLESS NOTED OTHERWISE. DISPOSITION OF
THE ITEMS / MATERIALS IS THE RESPONSIBILITY OF THE CONTRACTOR AND
MUST ADHERE TO ALL APPLICABLE FEDERAL, STATE, AND LOCAL
REGULATIONS.
13 COORDINATE LAY DOWN AREA WITH THE CONTRACTING OFFICER PRIOR TO
THE PRECONSTRUCTION MEETING. THE ALLOWABLE AREA SIZE MUST BE
ESTABLISHED BY THE CONTRACTING OFFICER.
14 ALL SUBMITTALS REQUIRED BY THESE DRAWINGS OR SPECIFICATIONS
MUST BE SUBMITTED TO THE CONTRACTING OFFICER FOR APPROVAL TO
COMMENCEMENT OF RELATED WORK.
15 STUDY AND COMPARE THE CONTRACT DOCUMENTS WITH EACH OTHER,
AND AT ONCE, REPORT TO THE CONTRACTING OFFICER ANY ERRORS,
INCONSISTENCIES, OR OMISSIONS DISCOVERED. ANY CONSTRUCTION
ACTIVITY PERFORMED KNOWING IT INVOLVES A RECOGNIZED ERROR,
INCONSISTENCY OR OMISSION IN THE CONTRACT DOCUMENTS WITHOUT
SUCH NOTICE TO THE CONTRACTING OFFICER, THE CONTRACTOR WILL
ASSUME RESPONSIBILITY FOR SUCH PERFORMANCE AND WILL BEAR THE
AMOUNT OF THE COST OF THE CONSTRUCTION.
16 OBSERVE AND MAINTAIN BUILDING AND COMPOUND SECURITY
REQUIREMENTS AS DIRECTED BY THE CONTRACTING OFFICER. THE
RESERVOIR PARCEL IS PROTECTED BY A 6-FOOT CHAIN-LINK SECURITY
FENCE WITH LOCKED GATE, 3-STRAND BARBED WIRE AND VISUAL
OBSCURATION SLATS. UPON RECEIPT OF WRITTEN REQUEST, ACTIVITY
OWNER (NAVAL STATION UTILITIES) WILL PROVIDE THE CONTRACTING
OFFICER A KEY TO UNLOCK THE GATE, WHICH MAY BE USED THROUGHOUT
THE DURATION OF THE PROJECT. AT PROJECT COMPLETION, RETURN THE
KEY TO THE CONTRACTING OFFICER.
17 ASBUILT PDF DRAWINGS OF THE 1995 & 2009 ROOF REPLACEMENTS ARE
AVAILABLE UPON REQUEST TO THE CONTRACTING OFFICER.
18 MANUFACTURER'S TRADE NAMES LISTED ARE NOT INTENDED TO BE
PROPRIETARY. PRODUCTS OF OTHER MANUFACTURERS WILL BE
ACCEPTABLE PROVIDED THEY MATCH THE COLOR, FINISHES, TEXTURES
AND PATTERNS OF THE MANUFACTURER LISTED, AND MEET THE TECHNICAL
REQUIREMENTS OF THE SPECIFICATIONS.
1 BUILT IN 1943, SP-90 IS A POTABLE WATER, CUT-AND-COVER STYLE
CONCRETE GROUND STORAGE WATER RESERVOIR (TANK) WITH A 2,200,000
GALLON CAPACITY. IT IS APPROXIMATELY ±193'-0" X ±207'-6" IN SIZE AND
HAS AN INTERIOR SHELL HEIGHT OF APPROXIMATELY ±9'-8". UPGRADED
CONTROLS WERE PROVIDED IN 1995-2005, AND THE ROOF WAS REPLACED
IN 2009. ADJACENT TO THE RESERVOIR IS A PUMP ROOM, AN ELECTRICAL
VAULT, AND APPROXIMATELY 50-FEET WEST IS A BACKFLOW PREVENTER
STRUCTURE, ALSO IN THE SCOPE OF WORK.
2 GENERAL SCOPE OF WORK INCLUDES, BUT IS NOT LIMITED TO:
2A SITE:
- MARK EXISTING UTILITIES WITHIN 10' OFFSET OF AREAS OF WORK.
- PROVIDE CONCRETE SLAB ON GRADE, ADJACENT TO ELECTRICAL VAULT,
TO SUPPORT SKID MOUNTED GENERATOR, REFER TO STRUCTURAL AND
ELECTRICAL DRAWINGS.
2B TANK:
- INTERIOR SURFACES (SLAB, COLUMNS, WALLS) – REMOVE TO BARE
CONCRETE, PATCH SURFACES, APPLY TANK COATING (ASSUME LEAKING
TANK), REFER TO STRUCTURAL DRAWINGS.
- COMPLETE DEMOLITION AND REPLACEMENT OF ROOF HATCHES AND
CURBS (INCLUDING NON-ROOF PENETRATING GUARD RAILS AND GATE),
REFER TO STRUCTURAL AND ARCHITECTURAL DRAWINGS.
- PARTIAL DEMOLITION AND REPLACEMENT OF CORRODED STEEL ROOF
FRAMING AROUND PERIMETER OF EXISTING ROOF ACCESS HATCHES,
REFER TO STRUCTURAL DRAWINGS.
- PROVIDE NEW STEEL ROOF FRAMING AROUND PERIMETER OF ANY NEW
ROOF PENETRATIONS, REFER TO STRUCTURAL DRAWINGS.
- COMPLETE DEMOLITION AND REPLACEMENT OF SLUICE GATES, TYPICAL
OF TWO, REFER TO STRUCTURAL & MECHANICAL DRAWINGS.
- COMPLETE DEMOLITION AND REPLACEMENT OF CORRODED LADDER
ANCHORS REMAINING IN TANK FROM EXISTING OR PREVIOUS LADDERS,
REFER TO STRUCTURAL DRAWINGS.
- COMPLETE DEMOLITION AND REPLACEMENT OF CORRODED TANK WALL
ELBOWS, PIPING, BENDS, ETC AS NOTED ON MECHANICAL DRAWINGS
AND ASSOCIATED WALL PATCHES ON STRUCTURAL DRAWINGS.
- COMPLETE DEMOLITION AND REPLACEMENT OR REPAIR OF CORRODED
INTERIOR PIPING AS NOTED ON MECHANICAL DRAWINGS AND ASSOCIATED
WALL PATCHES ON STRUCTURAL DRAWINGS.
- PROVISION OF TWO TANK MIXERS AND ASSOCIATED POWER AND
PENETRATION REQUIREMENT(S), REFER TO DRAWINGS OF ALL TRADES.
2C PUMP ROOM (REFER TO MECHANICAL DRAWINGS):
- COMPLETE DEMOLITION AND REPLACEMENT OF (3) FIRE PUMPS,
INCLUDING MOTORS, CONTROL SYSTEMS, SOFT STARTERS, GATE VALVES,
CHECK VALVES, PRESSURE TRANSMITTERS, AND SCADA MONITORING
SENSORS.
- COMPLETE DEMOLITION AND REPLACEMENT OF (1) ALTITUDE VALVE
AND ASSOCIATED MANUAL VALVES.
- COMPLETE DEMOLITION AND REPLACEMENT OF (1) SIGHT GLASS
ASSEMBLY.
- REROUTE CL17 ANALYZER DRAIN TO STORM CATCH BASIN OUTSIDE OF
STATION, AND ASSOCIATED WALL CORE DRILL.
2D ELECTRICAL VAULT (REFER TO ELECTRICAL DRAWINGS):
- PROVIDE A 300kW GENERATOR AND AUTOMATIC TRANSFER SWITCH (ATS)
TO MAINTAIN STATION LIGHTING, PUMP CONTROLS, AND POWER TO
PUMPS.
2E BACKFLOW PREVENTER (BFP) BUILDING (REFER TO MECHANICAL
DRAWINGS, UNLESS NOTED OTHERWISE):
- DEMO BUILDING ENVELOPE ABOVE SLAB-ON-GRADE COMPLETE (INCLUDES
8" THICK CMU WALLS, TIMBER ROOF TRUSSES, VINYL SIDING, A METAL
DOUBLE DOOR, ETC), REFER TO STRUCTURAL DRAWINGS.
- OVERLAY THE EXISTING SLAB-ON-GRADE AND INFILL CRACKS, MAINTAINING
EXISTING OR NEW FLOOR LEVEL PENETRATIONS AND CLEARANCES, REFER
TO STRUCTURAL DRAWINGS.
- COMPLETE DEMOLITION AND REPLACEMENT OF (5) BFP ASSEMBLY TO RPZ
BFP ASSEMBLY.
- PROVIDE WEATHERPROOF HEATED ENCLOSURES FOR (5) BFP ASSEMBLIES
- INSTALL A TEMPERATURE MONITORING SENSOR FOR EACH HOTBOX
ASSOCIATED WITH A BFP.
2F INCIDENTAL RELATED WORK AS SHOWN ON OTHER DISCIPLINE DRAWINGS.
S Y
M D
E S
C R
IP
T
I O N
D A
T E
A P
WATER SYMBOLS
C
SURFACE FEATURES LINE TYPES
STORM DRAIN SYMBOLS
SANITARY SYMBOLS
POWER SYMBOLS
OTHER UTILITY SYMBOLS
SURFACE FEATURES SYMBOLSSURVEY SYMBOLS
UTILITY LINE TYPES
CIVIL SYMBOL LEGEND
ABBREVIATIONS
GENERAL NOTES
NEW WORK LEGEND
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
-A
TL
AN
TI
C
BU
IL
DI
NG
S P-
RE
NO
VA
TE
R
ES
ER
VO
IR
S
TR
UC
TU
RE
R
EP
LA
CE
B O
O
ST
ER
P
UM
P
ST
AT
IO
N
C-001
IP
IP
IP
IP
IP
IP
IP
SF
SF
SF
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
-A
TL
AN
TI
C
BU
IL
DI
NG
S P-
RE
NO
VA
TE
R
ES
ER
VO
IR
S
TR
UC
TU
RE
R
EP
LA
CE
B O
O
ST
ER
P
UM
P
ST
AT
IO
N
C-101
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYNOTES
CIVIL DEMOLITION PLAN
IP
EROSION & SEDIMENTATION LEGEND
SF
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
-A
TL
AN
TI
C
BU
IL
DI
NG
S P-
RE
NO
VA
TE
R
ES
ER
VO
IR
S
TR
UC
TU
RE
R
EP
LA
CE
B O
O
ST
ER
P
UM
P
ST
AT
IO
N
C-102
GENERAL SHEET NOTES
GRAPHIC SCALE
KEYNOTES
CIVIL SITE PLAN
D1 ABOVE GROUND CONCRETE VAULT
B1 SURPLUS ITEMS ON NORTH SIDE OF SP-90A
A1 SURPLUS ITEMS ON WEST SIDE OF SP-90A
D3 SURPLUS ITEMS ON NORTH SIDE OF SP-90
B3 SURPLUS ITEMS ON NORTH SIDE OF SP-90
INLET PROTECTIONIP
IP
EROSION AND SEDIMENT CONTROL GENERAL NOTES
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
-A
TL
AN
TI
C
BU
IL
DI
NG
S P-
RE
NO
VA
TE
R
ES
ER
VO
IR
S
TR
UC
TU
RE
R
EP
LA
CE
B O
O
ST
ER
P
UM
P
ST
AT
IO
N
C-501
SILT/SEDIMENT FENCESF
SF
TYPICAL DOUBLE SWING GATE ELEVATION
PLAN - DOUBLE SWING GATE
TYPICAL FENCE AND CORNER PANEL ELEVATION
GATE HINGE DETAIL
GATE LATCH DETAILOFFSET HINGE DETAIL FULCRUM LATCH DETAIL
SINGLE EXTENSION ARM DETAILS
TYPICAL 3 STRAND BARBED WIRE AND SINGLE EXTENSION ARM CONFIGURATION
GROUNDING DETAIL
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
-A
TL
AN
TI
C
BU
IL
DI
NG
S P-
RE
NO
VA
TE
R
ES
ER
VO
IR
S
TR
UC
TU
RE
R
EP
LA
CE
B O
O
ST
ER
P
UM
P
ST
AT
IO
N
C-502
LINE POST DETAILSD1
TYPICAL FENCE AND CORNER PANEL ELEVATIONC1
TYPICAL DOUBLE SWING GATE ELEVATIONA1
GROUNDING DETAILD3
TYPICAL 3 STRAND BARBED WIRE WITH SINGLE EXTENSION ARM DETAILD5
CORNER & END POST DETAILSC3 SINGLE EXTENSION ARM DETAILSC5
GATE HARDWARE DETAILSA5
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D~
M
ID
-A
TL
AN
TI
C
BU
IL
DI
NG
S P-
RE
NO
VA
TE
R
ES
ER
VO
IR
S
TR
UC
TU
RE
R
EP
LA
CE
B O
O
ST
ER
P
UM
P
ST
AT
IO
N
C-503
FIRE HYDRANT CONNECTIONTYPICAL DRY BARREL FIRE HYDRANT CONCRETE FILLED BOLLARD
TYPICAL GATE VALVE INSTALLATION DETAIL TYPICAL VALVE BOX DETAIL
W12X26
W12X26
TOF X' - X" FRAMING SIZE
EXISTING FRAMING SIZE
X
TOP OF FOUNDATION
COLUMN GRID MARK
TOC X' - X" TOP OF CONCRETE
TOS X' - X" TOP OF STEEL
X" TOP OF SLAB
SPOT ELEVATION
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
AS NOTED
S-001
B U
IL
D
IN
G
S P
-9
S
TR
U C
TU
R
A L
N O
TE
S
A N
D P
LA
N
L E
G E
N D
JDL
12,885,735
JDL ADB
04/14/2023
HAI HUYNH - CNIC
J.B. JONES - UEM
R E
N O
V A
TE
R
E S
E R
V O
IR
S
TR
U
C
TU
R E
R
E P
LA
C
E B
O O
S
TE
R P
U M
P S
TA
TI
O N
DUSTIN A. SCHULZE, RA
1674978
N/A
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
S.M. SWEENEY, PE
JMS
N/A
M
ID
L A
N T
P
W D
N O
R F
O L
K
1 STRUCTURAL DRAWINGS MUST BE USED IN CONJUNCTION WITH DRAWINGS
OF ALL OTHER DISCIPLINES AND THE SPECIFICATIONS. VERIFY
REQUIREMENTS OF OTHER TRADES AS TO SLEEVES, CHASES, HANGERS,
INSERTS, ANCHORS, HOLES AND OTHER ITEMS TO BE PLACED OR SET IN THE
STRUCTURAL WORK AS WELL AS TO BE TEMPORARILY DISCONNECTED AND
RECONNECTED TO ALLOW FOR THE INSTALLATION OF STRUCTURAL WORK.
2 THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH SAFETY
PRECAUTIONS AND REGULATIONS DURING THE WORK. THE STRUCTURAL
ENGINEER WILL NOT ADVISE ON, NOR ISSUE DIRECTION AS TO SAFETY
PRECAUTIONS AND PROGRAMS.
3 STRUCTURAL DRAWINGS HEREIN REPRESENT THE FINISHED STRUCTURE.
PROVIDE ALL TEMPORARY SHORING, TEMPORARY SUPPORTS, GUYING AND
BRACING REQUIRED TO ERECT AND HOLD THE STRUCTURE IN PROPER
ALIGNMENT UNTIL ALL STRUCTURAL WORK AND CONNECTIONS HAVE BEEN
COMPLETED. THE INVESTIGATION, DESIGN, SAFETY, ADEQUACY AND
INSPECTION OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS,
ETC., IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
4 FIELD VERIFY DIMENSIONS, ELEVATIONS, INTERFERENCES AND OTHER
REQUIREMENTS NECESSARY FOR THE PROPER CONSTRUCTION AND
ALIGNMENT OF NEW PORTIONS OF THE STRUCTURE TO EXISTING. MAKE ALL
MEASUREMENTS NECESSARY FOR FABRICATION AND ERECTION OF
STRUCTURAL MEMBERS. DISCREPANCIES MUST BE BROUGHT TO THE
ATTENTION OF THE CONTRACTING OFFICER PRIOR TO ORDERING MATERIALS
OR BEGINNING WORK (CONSTRUCTION OR DEMOLITION).
5 ALL STRUCTURAL SYSTEMS WHICH ARE TO BE COMPOSED OF COMPONENTS
TO BE FIELD ERECTED MUST BE SUPERVISED BY THE SUPPLIER DURING
MANUFACTURING, DELIVERY, HANDLING, STORAGE AND ERECTION IN
ACCORDANCE WITH THE SUPPLIER’S INSTRUCTIONS AND REQUIREMENTS.
6 LOADING APPLIED TO THE STRUCTURE DURING CONSTRUCTION MUST NOT
EXCEED THE SAFE LOAD-CARRYING CAPACITY OF THE STRUCTURAL
MEMBERS. THE LIVE LOADINGS USED IN THE DESIGN OF THIS STRUCTURE
ARE INDICATED IN THE "DESIGN CRITERIA NOTES". DO NOT APPLY ANY
CONSTRUCTION LOADS UNTIL STRUCTURAL FRAMING IS PROPERLY
CONNECTED TOGETHER AND UNTIL ALL TEMPORARY BRACING IS IN PLACE.
7 DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION.
WHERE CONDITIONS ARE NOT SPECIFICALLY SHOWN, USE SIMILAR DETAILS
OF CONSTRUCTION, SUBJECT TO APPROVAL BY THE CONTRACTING OFFICER.
8 SHOP DRAWINGS MUST NOT BE REPRODUCTION OF CONTRACT DRAWINGS.
9 DO NOT HANG ITEMS FROM EXISTING STRUCTURE, UNLESS OTHERWISE
NOTED.
GENERAL NOTES DESIGN CRITERIA NOTES
2 THE LATERAL LOAD RESISTING SYSTEM FOR THIS STRUCTURE CONSISTS
PRIMARILY OF CANTILEVERED CAST-IN-PLACE CONCRETE WALLS. THESE
ELEMENTS PROVIDE FOR THE LATERAL STRENGTH AND STABILITY OF THE
COMPLETED STRUCTURE.
3 LIVE LOADS USED IN THE DESIGN OF THESE STRUCTURES ARE AS FOLLOWS:
A. ROOF = 20 PSF
B. FLOORS = 100 PSF
C. STAIRS, GRATING = 100 PSF
D. LADDER, OSHA COMPLIANT
4 DESIGN LOAD CRITERIA, DETERMINED IN ACCORDANCE WITH UFC 3-301-01, IS
AS FOLLOWS:
A. BUILDING CRITERIA: RISK CATEGORY = IV
B. SNOW LOADS:
- GROUND SNOW LOAD = 10 PSF
- EXPOSURE FACTOR, CE = 1.0
- THERMAL FACTOR, CT = 1.2
C. WIND LOADS:
- BASIC WIND SPEED = 131 MPH
- EXPOSURE CATEGORY = D
D. SEISMIC LOADS:
- SITE CLASS = D
- SEISMIC DESIGN CATEGORY = B
- SHORT PERIOD SPECTRAL RESPONSE ACCEL, SS = 0.089G
- 1.0 SEC SPECTRAL RESPONSE ACCELERATION, S1 = 0.054G
- DEFLECTION AMPLIFICATION FACTOR, CD = 4
- RESPONSE MODIFICATION FACTOR, R = 4
"ORDINARY REINFORCED CONC SHEAR WALLS, BEARING WALL SYSTEMS"
1 THE STRUCTURAL WORK TO BE PERFORMED UNDER THIS CONTRACT HAS
BEEN DESIGNED TO THE APPLICABLE DESIGN STANDARD AND / OR CRITERIA
OF THE FOLLOWING, UNLESS NOTED OTHERWISE:
A. ACI 318-19, “BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE”
B. ACI 530-13, “BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES”
C. ANSI/AISC 360-16, “SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS”
D. ASCE 7-16, “MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER
STRUCTURES”
E. INTERNATIONAL BUILDING CODE 2018
F. INTERNATIONAL EXISTING BUILDING CODE 2018
G. SDI RD-2017, "STANDARD FOR STEEL ROOF DECK"
H. UFC 1-200-01 (01 SEPTEMBER 2022, CH 1 24 FEBRUARY 2023), “DOD
BUILDING CODE”
I. UFC 3-230-01 (01 SEPTEMBER 2018, CH 3 01 JULY 2021), “WATER STORAGE,
DISTRIBUTION, AND TRANSMISSION”
J. UFC 3-301-01 (01 OCTOBER 2019, CH 1 04 FEBRUARY 2022), "STRUCTURAL
ENGINEERING"
K. UFC 3-600-01 (08 AUGUST 2016, CH 6 06 MAY 2021), “FIRE PROTECTION
ENGINEERING FOR FACILITIES”
L. ALL ASTM AND OTHER REFERENCES ARE PER THE LATEST EDITIONS OF
THESE STANDARDS AT THE CONTRACT AWARD DATE
M. ALL MATERIALS USED MUST COMPLY WITH THE SAFE DRINKING WATER ACT
AND OTHER FEDERAL REGULATIONS FOR NON-POTABLE WATER. REPAIR AND
CONSTRUCTION MATERIALS ARE REQUIRED TO BE AWWA C652 COMPLIANT.
N. ANTITERRORISM AND SECURITY
- POLICY STATEMENT ON INFRASTRUCTURE SECURITY FOR PUBLIC WATER
SUPPLIES OF THE “TEN STATE STANDARDS”
- ASCE/AWWA DRAFT AMERICAN NATIONAL STANDARD FOR TRIAL USE,
“GUIDELINES FOR THE PHYSICAL SECURITY OF WATER UTILITIES”
1 PROVIDE THE FOLLOWING SUBMITTALS, FOR GOVERNMENT REVIEW AND
APPROVAL, IN ADDITION TO THOSE REQUIRED BY THE SPECIFICATIONS:
- ANCHOR BAR ADHESIVE PRODUCT DATA
- CONCRETE CRACK REPAIR EPOXY PRODUCT DATA
- CONCRETE CRACK REPAIR EPOXY RESIN MANUFACTURERS TECHNICAL
PRODUCT DATA
- CONCRETE CRACK REPAIR QUALIFICATIONS / EXPERIENCE
- CONCRETE PATCH PRODUCT DATA
- FRP LADDER PRODUCT DATA
- FRP STRUCTURAL SHAPE PRODUCT DATA AND ALLOWABLE AXIAL
LOAD TABLE
- NSF 61 APPROVED COATING SYSTEM
- OPTIONAL PROPRIETARY FRAMING CONNECTIONS (WHEN USED)
- ROOF HATCH PRODUCT DATA
- THREADED ADHESIVE ANCHOR PRODUCT DATA
ADDITIONAL REQUIRED SUBMITTALS
RESERVOIR DISINFECTION NOTES
EXISTING TANK COATING NOTES
1 AT WORK COMPLETION, PRIOR TO PLACING THE TANK BACK INTO SERVICE,
THE CONTRACTOR MUST PREPARATION CLEAN AND DISINFECT THE
RESERVOIR INTERIOR IN ACCORDANCE WITH AWWA C652 METHOD 2.
2 ALL MATERIALS USED MUST COMPLY WITH THE SAFE DRINKING WATER ACT
AND OTHER FEDERAL REGULATIONS FOR POTABLE WATER.
3 WATER USED FOR CLEANING PURPOSES, PREPARATION OF SOLUTIONS, AND
TANK FILLING MUST BE POTABLE.
4 ALL NON-STRUCTURAL MATERIALS MUST BE REMOVED PRIOR TO THE
CLEANING OF THE TANK.
5 ALL TANK SURFACES MUST BE CLEANED, INCLUDING BUT NOT LIMITED TO:
WALLS, FLOOR, CEILING, COLUMNS, INTERNAL PIPING, FRP LADDER, AND ALL
APPURTENANCES WITHIN THE INTERIOR OF THE TANK.
6 COMPLY WITH THE LATEST REVISION OF AWWA C652 FOR DISINFECTION OF
WATER COATING, FLUSHING, BACTERIOLOGICAL TESTING, AND OTHER
PROCEDURES TO PROTECT WATER LINES DURING CONSTRUCTION AND
REPAIR. PROVIDE TWO CONSECUTIVE NEGATIVE BACTERIOLOGICAL TEST
RESULTS. PROVIDE IMPACT STATEMENT TO THE NAVY ENVIRONMENTAL
COORDINATOR VIA UEM PETER COWPER (757-341-1717).
7 COORDINATE FILLING THE TANK AND BACTERIAL TESTING RESULTS WITH THE
UTILITIES DEPARTMENT (UEM) PETER COWPER (757-341-1717).
8 CLEANING SOLUTION MUST NOT ENTER THE STORM DRAIN WITHOUT PRIOR
PRODUCT DATA SUBMITTED AND GOVERNMENT APPROVAL RECEIVED.
NEW COATING NOTES - TANK INTERIORWORK SEQUENCE - TANK INTERIOR
BLASTING EXISTING METAL NOTES
1 CONTRACTOR TO COORDINATE WITH PUBLIC WORKS UTILITIES (UEM) PETER
COWPER (757-341-1717) TO DEWATER THE TANK TO THE MAXIMUM EXTENT
POSSIBLE. CONTRACTOR MUST PUMP OUT THE RESIDUAL 3 INCHES ± WATER
REMAINING IN THE TANK PRIOR TO DEMOLITION.
2 THE WATER TANK IS A CONFINED SPACE, THEREFORE THE CONTRACTOR
MUST PROVIDE CONTINUOUS GAS FREE AND VENTILATION CERTIFICATION.
3 DEMOLISH EXISTING ACCESS HATCHES AND CURBS (TYPICAL OF 2), INTERIOR
VERTICAL ACCESS LADDERS (TYPICAL OF 2).
4 CONTRACTOR TO DISCONNECT ALL TANK INTERIOR UTILITIES AND REMOVE
CONDUIT FROM TANK AS REQUIRED TO PERFORM THE WORK. DO NOT REUSE
REMOVED CONDUIT. INSTALL NEW CONDUIT AND RECONNECT ALL
DISCONNECTED UTILITY LINES.
5 REMOVE THE BIO-FILM AND EXISTING ALKYD COATING / LINER PER “EXISTING
TANK COATING NOTES”.
6 ENSURE SURFACE CLEANLINESS. ANY SURFACE CONTAMINANTS NOT
REMOVED PRIOR TO ABRASIVE BLASTING ARE LIKELY TO BECOME
IMPREGNATED INTO THE SUBSTRATE DURING ABRASIVE BLASTING AND
CAUSE A PREMATURE COATING FAILURE.
7 WATERBLAST CLEAN THE EXISTING CONCRETE SURFACES (FLOOR, COLUMNS,
WALLS). REMOVE AND DISPOSE OF ALL TRASH AND SEDIMENT FROM THE
EXISTING FLOOR. ASSUME 1-3 INCHES OF SEDIMENT. SPRAY AND DISINFECT
THE TANK IN ACCORDANCE WITH AWWA C652 CHLORINATION METHOD 2.
8 INSTALL NEW ROOF ELEMENTS, TO INCLUDE BUT NOT LIMITED TO: ROOF
METAL FRAMING MEMBERS AROUND THE ROOF ACCESS HATCH LOCATIONS,
(2) ACCESS HATCHES AND CURBS WITH FALL PROTECTION GUARD RAILS AND
GATES, DECKING AND ROOFING MEMBRANE AT INFILL LOCATIONS.
9 INSTALL NEW WALL ELEMENTS, TO INCLUDE BUT NOT LIMITED TO: (2)
INTERIOR VERTICAL ACCESS LADDERS.
10 REPAIR EXISTING HORIZONTAL AND VERTICAL SPALLS IN ACCORDANCE WITH
“SPALL REPAIR NOTES”. WHERE SHALLOW SPALLS MEET DEEPER SPALLS,
REPAIR THE SHALLOW SPALLS FIRST.
A. PATCH INTERIOR TANK WALLS, COLUMNS, AND FLOOR.
B. FILL LARGE VOIDS WITH SERIES 218 MORTARCLAD OR APPROVED
EQUIVALENT IN ACCORDANCE WITH SSPC SP13 / NACE 6, ICRI CSP 4-5.
C. FILL CRACKS WITH SERIES 265 ELASTO-SHIELD TG OR EQUIVALENT.
11 APPLY AN IMMERSION GRADE COATING SYSTEM ON ALL INTERIOR SURFACES
PER MANUFACTURER'S RECOMMENDATIONS AND PER “NEW TANK COATING
NOTES - TANK INTERIOR” TO A MINIMUM OF 100 DRY MILS.
12 PRIOR TO GOVERNMENT ACCEPTANCE OF THE TANK, THE CONTRACTOR MUST
DISINFECT THE TANK IN ACCORDANCE WITH AWWA C652 CHLORINATION
METHOD 2. COORDINATE FILLING THE TANK WITH PUBLIC WORKS UTILITIES
PERSONNEL (UEM).
5 ALL REMOVABLE AND NON-PAINTED APPURTENANCES SUCH AS MARKERS,
MUST BE REMOVED BY THE CONTRACTOR PRIOR TO ANY INTERIOR COATING
WORK. THESE ITEMS MUST BE CLEANED, PROTECTED, AND STORED DURING
COATING WORK AND REINSTALLED FOLLOWING COMPLETION OF COATING.
6 ALL SPALL REPAIR, CRACK REPAIR, RUSTED REINFORCEMENT, SEALING OF
PENETRATIONS AND LADDER RUNG REMOVAL, ALONG WITH ANY
MISCELLANEOUS REPAIRS MUST BE PERFORMED ON THE INTERIOR OF THE
CONCRETE TANK BEFORE ANY COATING PREPARATION WORK IS PERFORMED.
7 INTERIOR METAL SURFACES MUST BE PREPARED PER "BLASTING EXISTING
METAL NOTES".
8 ALL AREAS TO RECEIVE THE COATING MUST BE ABRASIVE BLASTED TO
REMOVE ALL LAITANCE AND ACHIEVE CONCRETE SURFACE PROFILE AS
SPECIFIED BY THE MANUFACTURER.
9 ABRASIVES USED FOR BLAST CLEANING MUST BE THOSE SPECIFIED BY THE
SSPC AND PER THE SPECIFICATIONS. PARTICULAR ATTENTION MUST BE
GIVEN TO THE MAXIMUM PARTICLE SIZE REQUIREMENTS. ABRASIVES MUST BE
SELECTED TO PROVIDE THE RECOMMENDED SURFACE PROFILE AND DEGREE
OF CLEANLINESS REQUIRED BY THE NEW COATING MANUFACTURER.
1 COMPLETELY REMOVE THE EXISTING TANK COATING FROM THE INTERIOR OF
THE TANK TO ENSURE PROPER ADHESION OF THE NEW COATING TO WALLS,
FLOOR AND COLUMNS, AND PER MANUFACTURER'S RECOMMENDATIONS.
2 PRIOR TO ABRASIVE BLASTING, THE ENTIRE AREA TO RECEIVE THE NEW
COATING MUST BE INSPECTED FOR OIL, GREASE, RUST, DUST, BIO-FILM, OR
OTHER DELETERIOUS SUBSTANCES. ANY AREAS WHERE SUCH DELETERIOUS
SUBSTANCES ARE PRESENT MUST BE CLEANED IN ACCORDANCE WITH THE
COATING MANUFACTURER’S RECOMMENDATIONS.
3 PRIOR TO ANY COATING APPLICATION, ALL UNUSED BRACKETS MUST BE
REMOVED FROM THE INTERIOR SURFACES AND PIPE SUPPORTS. ALL
UNDERLYING AREAS MUST BE GROUND SMOOTH. ALL WELD BURRS, WELD
SPATTER, SCARS, AND ROUGH EDGES MUST BE GROUND SMOOTH. SEALED
WELDED CONTAINMENT LUGS MUST BE LEFT IN PLACE.
4 DUST, DIRT, OIL, GREASE, RUSH, OR ANY FOREIGN MATTER THAN WILL AFFECT
THE ADHESION OR DURABILITY OF THE FINISH MUST BE REMOVED FROM THE
SURFACE PRIOR TO APPLICATION. ALL SURFACES MUST BE THOROUGHLY
WASHED AND COMPLETELY CLEANED OF ANY RESIDUE OR DUST BEFORE
APPLYING SEALER OR PRIMER AND COATINGS.
1 INTERIOR TANK METAL PIPES AND METAL SURFACES MUST BE PREPARED IN
ACCORDANCE WITH SSPC SP10 / NACE NUMBER 2 NEAR WHITE BLAST
CLEANING AND PROVIDE A MINIMUM ANGULAR ANCHOR PROFILE OF 2.0 MILS.
2 BLAST CLEANING ABRASIVES MUST BE AS SPECIFIED IN THE SSPC
SPECIFICATIONS. PARTICULAR ATTENTION MUST BE GIVEN TO THE MAXIMUM
PARTICLE SIZE REQUIREMENTS. ABRASIVES MUST BE SELECTED TO PROVIDE
THE RECOMMENDED SURFACE PROFILE AND DEGREE OF CLEANLINESS
REQUIRED.
3 FIELD MEASUREMENT OF THE SURFACE PROFILE OF BLASTED CLEANED
METAL MUST BE CONDUCTED IN ACCORDANCE WITH ASTM D4417.
4 ALL WELD SEAMS AND ANY RUSTED OR ABRADED AREAS, INCLUDING RUST
BLOOM MUST BE GROUND SMOOTH AND PROPERLY CLEANED.
5 ALL EXISTING METAL PIPING TO REMAIN IN THE TANK MUST BE COATED WITH
AN NSF 61 COMPLIANT EPOXY SYSTEM PRIOR TO INTERIOR TANK COATING
INSTALLATION.
6 AFTER INITIAL TANK COATING CURES, A SECOND APPLICATION OF EPOXY
COATING MUST BE APPLIED TO ALL METAL PIPING AND SURFACES MUST
OVERLAP POLYUREA COATING FOUR TO SIX INCHES.
1 CONTRACTOR MUST COORDINATE NEW COATING REQUIREMENTS WITH
MANUFACTURER FOR ADEQUATE REMOVAL OF EXISTING COATING AND
ENSURE PROPER ADHESION OF NEW COATING TO TANK WALLS, FLOORS,
CEILING, COLUMNS, AND NEW PIPE SUPPORTS, MISCELLANEOUS ITEMS.
2 COATING SYSTEM MUST BE PROVIDED BY A SINGLE SOURCE SUPPLIER.
3 INTERIOR TANK COATING SYSTEM MUST BE A NSF 61 RATED TWO COMPONENT,
100% SOLIDS, HIGH PERFORMANCE AROMATIC POLYUREA SPRAY ELASTOMER
SYSTEM WITH ZERO VOCS AND MUST BE INSTALLED PER MANUFACTURERS
SPECIFICATIONS TO A TOTAL MINIMUM THICKNESS OF 100.0 MIL AS FOLLOWS:
A. CONCRETE PRIMER SUPPLIED BY COATING MANUFACTURER MUST BE
COMPATIBLE WITH TANK COATING. PRIMER MAY BE SPRAYED, ROLLED, OR
BRUSHED ONTO THE PROPER THICKNESS PER MANUFACTURER
SPECIFICATIONS. APPLY PRIMER SERIES 20HS POTA-POX AT 4-6 DRY MILS OR
EQUIVALENT.
B. TANK COATING MUST BE APPLIED PER MANUFACTURERS INSTRUCTIONS
INCLUDING CURE TIME.
C. APPLY TOP COAT SERIES 262 ELASTO-SHIELD AT 50-100 DRY MILS OR
APPROVED EQUIVALENT.
4 THICKNESS OF COATING LAYERS MUST BE CHECKED AND DOCUMENTED BY A
QUALITY CONTROL SPECIALIST APPROVED BY THE MANUFACTURER FOR
COMPLIANCE WITH THE SPECIFICATIONS.
5 PIPE SUPPORTS MUST BE COATED IN PLACE IN SYNC WITH TANK COATING.
6 THE FINISHED SURFACE OF THE COATING MUST BE GENERALLY SMOOTH AND
FREE OF SHARP PROTRUSIONS. THE COATING MUST HAVE NO BLISTERS OR
BUBBLES. THE COATING MUST FULLY CURE AND HAVE NO GOOEY OR STICKY
AREAS. THE COATING MUST BE INSPECTED AND TESTED BY THE QUALITY
CONTROL SPECIALIST AND ALL WARRANTY CERTIFICATIONS COMPLETED
PRIOR TO ACCEPTANCE BY THE GOVERNMENT.
7 FLOOR COATING MUST MEET ALL OSHA REQUIREMENTS AND MUST NOT
DEFORM OR BE ADVERSELY AFFECTED BY NORMAL FOOT TRAFFIC OR WATER
WEIGHT AFTER CURING OF THE MATERIAL IS EFFECTIVELY COMPLETE.
8 ATMOSPHERIC CONDITIONS IN THE TANK MUST BE CONTINUOUSLY
MONITORED AND RECORDED IN AN INSPECTION LOGBOOK DURING THE
COATING OPERATIONS TO ENSURE THAT THE MANUFACTURER’S
RECOMMENDED LIMITS FOR HUMIDITY AND TEMPERATURES ARE BEING
FOLLOWED DURING COATING INSTALLATION AND CURING.
9 USE OF THINNERS ARE ONLY AS PRESCRIBED AND APPROVED BY THE
COATING MANUFACTURER. ANY MIXING MUST BE MONITORED AND APPROVED
OF BY THE MANUFACTURER’S REPRESENTATIVE.
10 BATCH NUMBERS FROM CANS OF PAINTING USED ON THE PROJECT MUST BE
RECORDED IN THE INSPECTION LOGBOOK, AND ON THE RECORD DRAWINGS
AND MUST INDICATE THE PORTIONS OF THE TANK TO WHICH THE SPECIFIC
CANS OF PAINT WERE APPLIED.
11 THE COATING MUST HAVE A MINIMUM MANUFACTURERS WARRANTY OF SEVEN
YEARS AGAINST FAILURES DUE TO DEFECTIVE MATERIALS AND
WORKMANSHIP OF THE COATING SYSTEM.
PLAN LEGEND
SPECIAL INSPECTION NOTES
1 CONTRACTOR MUST NOTIFY THE SPECIAL INSPECTOR AT LEAST 48 HOURS IN
ADVANCE FOR WORK THAT WILL REQUIRE INSPECTION OR TESTING.
CONTRACTOR MUST EMPLOY THIRD PARTY SPECIAL INSPECTOR.
2 SPECIAL INSPECTIONS MUST BE COMPLETED FOR THE FOLLOWING
ELEMENTS ACCORDING TO IBC SECTION 1704.
3 CONCRETE AND ELEMENTS EMBEDDED IN CONCRETE MUST BE SPECIAL
INSPECTED PRIOR TO AND DURING PLACEMENT OF CONCRETE. SPECIAL
INSPECTIONS MUST INCLUDE THE FOLLOWING:
A. PERIODIC INSPECTION:
1. REINFORCING STEEL SIZE AND PLACEMENT
2. VERIFY USE OF APPROVED MIX DESIGN
3. AFTER PLACEMENT TO ENSURE ADEQUATE CURING AND
WEATHER PROTECTION PROCEDURES
B. CONTINUOUS INSPECTION:
1. BOLTS TO BE INSTALLED IN CONCRETE PRIOR TO AND DURING
PLACEMENT OF CONCRETE
2. DURING PLACEMENT OF CONCRETE
4 STRUCTURAL STEEL FABRICATION AND ERECTION MUST BE SPECIAL
INSPECTED AS FOLLOWS:
A. PERIODIC INSPECTION:
1. HIGH-STRENGTH BOLTS, NUTS AND WASHERS ACCORDING TO
AISC 360-10
5 POST-INSTALLED ANCHORS, INCLUDING BUT NOT LIMITED TO EXPANSION
ANCHORS, ADHESIVE ANCHORS, AND LOW VELOCITY FASTENERS MUST BE
SPECIAL INSPECTED ACCORDING TO THE RELEVANT ANCHOR CODE
EVALUATION REPORTS.
A. PERIODIC SPECIAL INSPECTION IS REQUIRED DURING THE INSTALLATION
OF POST-INSTALLED ANCHORS. SPECIAL INSPECTOR MUST VERIFY
THE FOLLOWING:
1. ANCHOR SIZE AND STEEL GRADE
2. HOLE DIAMETER, LOCATION AND TYPE OF DRILL BIT
3. COMPLIANCE WITH MANUFACTURER'S INSTRUCTIONS, INCLUDING HOLE
AND ANCHOR CLEANLINESS, AND ADHESIVE APPLICATON
4. ANCHOR EMBEDMENT DEPTH
6 SEE THE IBC AND OTHER DISCIPLINE'S DRAWINGS FOR NON-STRUCTURAL
ITEMS REQUIRED TO BE SPECIAL INSPECTED.
STRUCTURAL TESTING
1 THE FOLLOWING MATERIALS MUST BE TESTED ACCORDING TO IBC SECTION
1705. ANY ITEMS FOUND TO BE DEFICIENT MUST BE CORRECTED AND
RE-TESTED AT NO ADDITIONAL COST TO THE GOVERNMENT.
3 CONCRETE STRENGTH VERIFICATION AND TESTING. ALL CONCRETE MUST BE
TESTED TO VERIFY STRENGTH, SLUMP, UNIT WEIGHT, AIR CONTENT AND
TEMPERATURE. SEE THE SPECIFICATIONS FOR TESTING CRITERIA,
FREQUENCY, AND ACCEPTABILITY CRITERIA.
4 POST-INSTALLED ANCHORS, INCLUDING BUT NOT LIMITED TO EXPANSION
ANCHORS, ADHESIVE ANCHORS, AND LOW VELOCITY FASTENERS MUST BE
TESTED ACCORDING TO THE RELEVANT ANCHOR CODE EVALUATION
REPORTS.
5 SEE THE IBC AND OTHER DISCIPLINE'S DRAWINGS FOR NON-STRUCTURAL
ITEMS REQUIRED TO BE TESTED.
S Y
M D
E S
C R
IP
T
I O N
D A
TE
A
P
/D4 S-501
/B4 S-501
/B3 S-501
/B3 S-501
/B3 S-501
/D3 S-501
/D3 S-501
/D3 S-501
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
AS NOTED
S-002
B U
IL
D
IN
G
S P
-9
S
TR
U C
TU
R
A L
N O
TE
S
C
O N
C R
E
TE
, S
TE
E L
JDL
12,885,736
JDL ADB
04/14/2023
HAI HUYNH - CNIC
J.B. JONES - UEM
R E
N O
V A
TE
R
E S
E R
V O
IR
S
TR
U
C
TU
R E
R
E P
LA
C
E B
O O
S
TE
R P
U M
P S
TA
TI
O N
DUSTIN A. SCHULZE, RA
1674978
N/A
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
S.M. SWEENEY, PE
JMS
N/A
M
ID
L A
N T
P
W D
N O
R F
O L
K
SPALL REPAIR NOTES
1 ALL CONCRETE WORK MUST CONFORM TO THE REQUIREMENTS OF ACI 301-16,
"SPECIFICATION FOR STRUCTURAL CONCRETE BUILDINGS".
2 CONCRETE MUST BE NORMAL WEIGHT AND MUST OBTAIN A 28 DAY
COMPRESSIVE STRENGTH (UNLESS NOTED OTHERWISE) OF 4,000 PSI.
3 BEFORE PLACING CONCRETE, ALL EMBEDDED ITEMS MUST BE PROPERLY
LOCATED, ACCURATELY POSITIONED, AND MAINTAINED SECURELY IN PLACE.
DO NOT FIELD BEND BARS PARTIALLY EMBEDDED IN HARDENED CONCRETE
UNLESS SPECIFICALLY INDICATED OR APPROVED BY THE CONTRACTING
OFFICER.
4 ALL EDGES OF PERMANENTLY EXPOSED CONCRETE SURFACES MUST BE
CHAMFERED 3/4" UNLESS NOTED OTHERWISE.
5 FORMWORK MUST REMAIN IN PLACE UNTIL CONCRETE HAS OBTAINED AT
LEAST 70% OF ITS 28 DAY COMPRESSIVE STRENGTH. THE CONTRACTOR MUST
PROVIDE ALL SHORING AND RESHORING.
6 FINISH TOLERANCE OF ALL SLABS MUST BE IN ACCORDANCE WITH ACI 301,
CLASS A.
7 ALL CONCRETE MUST BE MECHANICALLY VIBRATED IN ACCORDANCE WITH
ASTM 309R.
8 ANCHOR RODS WITH UPSET THREADS ARE NOT ALLOWED.
1 AT SPALL LOCATIONS, REMOVE ALL LOOSE MATERIAL. DEPTH OF REMOVAL
MUST BE TO SOUND CONCRETE, OR AT LOCATIONS OF EXPOSED REBAR, TO A
DEPTH OF 1-INCH BEHIND THE REBAR, WHICHEVER IS GREATER. REBAR
WHICH HAS LESS THAN HALF ITS PERIMETER EXPOSED AFTER REMOVAL TO
SOUND MATERIAL DOES NOT REQUIRED REMOVAL OF CONCRETE BEHIND IT.
2 EXISTING REBAR THAT IS EXPOSED AFTER REMOVAL OF LOOSE MATERIALS
MUST BE CLEANED TO BARE METAL.
3 PREPARE AND PRIME SUBSTRATE TO RECEIVE REPAIR MATERIAL IN
ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS.
4 AFTER CONCRETE REMOVAL METHODOLOGY ABOVE (NOTE 1), REPAIRS UP TO
2-INCHES DEEP MUST USE REPAIR MORTAR AS FOLLOWS:
A. PROPERTIES:
I. TWO-COMPONENT, POLYMER MODIFIED, FAST SETTING, NON-SAG,
PORTLAND CEMENT MORTAR
II. BOND STRENGTH PER ASTM C882 - 2000 PSI AT 28 DAYS
III. COMPRESSIVE STRENGTH PER ASTM C109
– 3500 PSI AT 1 DAY,
– 6000 PSI AT 7 DAYS
IV. VOLUME CHANGE PER ASTM C157
B. SAWCUT 1/2-INCH MINIMUM DEPTH AROUND PERIMETER OF EACH REPAIR
AND DEMOLISH ALL FEATHERED EDGES. MECHANICALLY ROUGHEN SURFACE
TO RECEIVE MORTAR TO ICRI CSP-5 OR GREATER.
C. MIX AND APPLY REPAIR MORTAR TO EXISTING CONCRETE PREPARED IN
ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS.
D. TROWEL FINISH MORTAR TO MATCH EXISTING ADJACENT SURFACES AND
CURE IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5 AFTER CONCRETE REMOVAL METHODOLOGY ABOVE (NOTE 1), REPAIRS
GREATER THAN 2-INCHES DEEP MUST BE REPAIRED WITH CONCRETE.
6 WHERE REPAIR MORTAR IS TO BE IN CONTACT WITH EXISTING CONCRETE,
COAT EXISTING WETTED CONCRETE WITH EPOXY BONDING COMPOUND JUST
PRIOR TO PLACING REPAIR MORTAR AS/WHERE RECOMMENDED BY MORTAR
AND BONDING COMPOUND MANUFACTURER. EPOXY BONDING COMPOUND
MUST CONFORM TO ASTM C881.
7 REMOVE ALL INJECTION PORTS AND EPOXY SEALANTS FROM SPALL AREA
PRIOR TO INSTALLING REPAIR MATERIAL (MORTAR OR CONCRETE).
8 CONTRACTOR MUST SUBMIT MANUFACTURERS TECHNICAL DATA FOR THE
POLYMER MODIFIED, PORTLAND CEMENT BASED REPAIR MORTAR TO THE
GOVERNMENT FOR APPROVAL PRIOR TO BEGINNING WORK.
9 EXISTING REBAR HAS AN ASSUMED CONCRETE COVER OF 1-1/2”, TYPICAL.
10 ALL REPAIR AREAS MUST BE TROWEL FINISHED TO MATCH EXISTING
ADJACENT SURFACES AND CURE IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS.
11 CONTRACTOR MUST BASE BID ON QUANTITIES INDICATED IN “REPAIR
SCHEDULE”. IF SPALLS ARE FOUND IN ADDITION TO THOSE INDICATED,
IDENTIFY TO THE CONTRACTING OFFICER THE LOCATION AND DESCRIPTION
OF ADDITIONAL SPALLS PRIOR TO REPAIRING.
1 PRIOR TO BEGINNING WORK, THE CONTRACTOR MUST SUBMIT TO THE
GOVERNMENT, DOCUMENTATION SHOWING CONTRACTORS EXPERIENCE OF
THREE CONSECUTIVE YEARS IN CONCRETE CRACK REPAIRS BY EPOXY
INJECTION, PLUS A LIST OF SIMILAR JOBS TO THE WORK SPECIFIED HEREIN.
2 ALL CRACKS MUST BE VISUALLY INSPECTED PRIOR TO ANY CRACK REPAIR
WORK. ANY STRUCTURAL CRACK (AS DEFINED BELOW) MUST BE BROUGHT TO
THE ATTENTION OF THE CONSTRUCTION MANAGER FOR EVALUATION BY THE
STRUCTURAL ENGINEER PRIOR TO REPAIR WORK. STRUCTURAL CRACKS ARE
DEFINED AS:
A. CRACKS THAT MAY INDICATE THE LOAD CARRYING CAPACITY OF A
STRUCTURE OR STRUCTURAL ELEMENT(S) HAS BEEN COMPROMISED.
B. CRACKS THAT MAY INDICATED LOAD PATHS HAVE BEEN MODIFIED AND
ADDITIONAL REPAIRS, OTHER THAN SEALING CRACKS BE REQUIRED TO
RESTORE STRUCTURAL INTEGRITY.
I. ALL THROUGH-MEMBER CRACKS
II. CRACKS COMPLETELY SEPARATING CONNECTIONS / INTERFACES
BETWEEN STRUCTURAL ELEMENTS.
III. SUBSTANTIAL CRACKS TRAVERSING SEVERAL STRUCTURAL MEMBERS.
3 REMOVE ANY SPALLING AND/OR DELETERIOUS CONCRETE ALONG THE
LENGTH OF ALL CRACKS TO BE REPAIR PRIOR TO PERFORMING INJECTION
WORK.
4 REMOVE ALL LOOSE AND SPALLING CONCRETE FROM THE CRACK. CLEAN
EACH CRACK OF DUST, DIRT, LOOSE CONCRETE AND UNSOUND MATERIAL.
BLOW OUT ALL LOOSE MATERIAL WITH A MAXIMUM 5000 PSI STREAM OF OIL
FREE COMPRESSED AIR.
5 LOCATE SURFACE MOUNTED PORTS AT BOTH ENDS OF EACH CRACK, AT THE
JUNCTION OF TWO OR MORE CRACKS, AND ALONG THE LENGTH OF EACH
CRACK CENTERLINE AT 16-INCH INTERVALS. COMPLETELY SEAL THE SURFACE
OF THE CRACK AND ALL AROUND PORTS WITH AN EPOXY PASTE. THE EPOXY
PASTE MUST EXTEND AT LEAST ONE INCH FURTHER THAN EACH SIDE AND END
OF THE CRACK. ALL PORTS MUST BE INSTALLED, AND THE SURFACE OF ALL
CRACKS SEALED, PRIOR TO ANY INJECTION OF EPOXY FOR EACH CRACK OR
SET OF CONNECTED CRACKS.
6 EPOXY PASTE USED TO SEAL SURFACE CRACKS MUST MEET RECOMMENDED
REQUIREMENTS FOR CAPPING MATERIAL AS SPECIFIED BY THE EPOXY
INJECTION MATERIAL MANUFACTURER. EPOXY PASTE MUST BE SUITABLE FOR
VERTICAL, HORIZONTAL, AND OVERHEAD SURFACES, AS APPLICABLE.
7 EPOXY ADHESIVE MUST BE INJECTED INTO EACH CRACK STARTING AT THE
LOWEST PORT USING A STANDARD HAND CAULKING OR PRESSURE POT UNTIL
THE EPOXY IS SEEN TO FLOW FREELY FROM THE NEXT PORT. AS EPOXY
RESIN APPEARS AT THE NEXT PORT, PINCH CLOSED PUMPING PORT AND
MOVE TO THE NEXT PORT AND COMMENT PUMPING. CONTINUE PROCEDURE
UNTIL OTHER END OF CRACK IS REACHED. AVOID DELAYS IN PUMPING
OPERATION. AT THE LAST PORT APPLY PRESSURE UNTIL REFUSAL.
8 CONTRACTOR MUST SUBMIT MANUFACTURERS TECHNICAL PRODUCT DATA
FOR THE EPOXY ADHESIVE TO THE GOVERNMENT FOR APPROVAL PRIOR TO
ORDERING MATERIAL. EPOXY MATERIAL FOR INJECT MUST BE A
TWO-COMPONENT, HIGH SOLIDS, MOISTURE-TOLERANT, EPOXY ADHESIVE
CONFORMING TO ASTM C881. THE ANCHORING ADHESIVE MUST HAVE BEEN
TESTED AND QUALIFIED FOR SEISMIC AND WIND LOADING, FULL IMMERSION,
FREEZE THAW CONDITIONS, AND FOR CRITICAL AND MINIMUM EDGE DISTANCE
AND SPACING. PRODUCT DATA MUST INCLUDE VALID EVALUATION REPORTS
FROM INTERNATIONAL CODE COUNCIL – EVALUATION SERVICES (ISS-ES) OR
OTHER INDEPENDENT, QUALIFIED TESTING AND EVALUATION SERVICE.
9 ONCE THE EPOXY HAS CURED, REMOVE PORTS & GRIND CONCRETE SURFACE
SMOOTH TO REMOVE ALL CAPPING MATERIAL & OVERFLOWED EPOXY.
10 ALL EPOXY REPAIR WORK MUST BE DONE IN STRICT ACCORDANCE WITH THE
MANUFACTURERS SPECIFICATIONS. DO NOT APPLY EPOXY AT
TEMPERATURES BELOW 45 DEGREES F.
11 CONTRACTOR MUST BASE BID ON QUANTITIES INDICATED IN “REPAIR
SCHEDULE”. IF CRACKS ARE FOUND IN ADDITION TO THOSE INDICATED,
IDENTIFY TO THE CONTRACTING OFFICER THE LOCATION AND DESCRIPTION
OF ADDITIONAL CRACKS PRIOR TO REPAIRING.
CRACK REPAIR NOTES
FOR BIDDING PURPOSES, CONTRACTOR MUST ASSUME THE FOLLOWING
FOR CONCRETE REPAIRS (CRACKS, SURFACE SPALLS, CORNER SPALLS):
REQUIRE REBAR REPAIR REPAIR DETAIL QUANTITY
A. CRACKS UNDER 1/8 INCH WIDTH NO 3000 LINEAR FEET
B. CRACKS EQUAL TO AND OVER 1/8 INCH WIDTH NO 300 LINEAR FEET
C. SURFACE SPALL UNDER 1-INCH DEPTH NO 2000 SQUARE FEET
D. SURFACE SPALL BETWEEN 1 & 2-INCHES DEEP NO 450 SQUARE FEET
E. SURFACE SPALL EQUAL TO AND OVER 2-INCHES DEPTH ASSUME ALL REBAR WITHIN THE
SPALL AREA WILL REQUIRE REPAIR
50 SQUARE FEET
F. CORNER SPALL UNDER 1-INCH DEPTH NO 150 SQUARE FEET
G. CORNER SPALL BETWEEN 1 & 2-INCHES DEEP NO 75 SQUARE FEET
H. CORNER SPALL EQUAL TO AND OVER 2-INCHES DEPTH ASSUME ALL REBAR WITHIN THE
SPALL AREA WILL REQUIRE REPAIR
50 SQUARE FEET
1 REINFORCING MATERIALS MUST BE AS FOLLOWS:
A. REINFORCING BARS – ASTM A615, GRADE 60, DEFORMED
B. TIES – ASTM A615, GRADE 40
2 PLACE REINFORCING STEEL IN ACCORDANCE WITH THE CONCRETE
REINFORCING STEEL INSTITUTE (CRSI) “MANUAL OF STANDARD PRACTICE”.
REINFORCING STEEL MUST NOT CONTAIN RUST, SCALE, OIL, GREASE, CLAY,
OR FOREIGN SUBSTANCES THAT WOULD REDUCE THE BOND. REMOVE LOOSE
RUST PRIOR TO PLACEMENT.
3 ALL REINFORCING STEEL, DOWELS, ANCHORS RODS, AND OTHER HARDWARE
TO BE SET IN CONCRETE MUST BE TIED IN PACE PRIOR TO THE PLACEMENT
OF CONCRETE TO PREVENT DISPLACEMENT BEYOND PERMITTED
TOLERANCES.
4 UNLESS NOTED OTHERWISE, THE FOLLOWING MINIMUM CONCRETE COVER
MUST BE PROVIDED FOR REINFORCEMENT, IN ACCORDANCE WITH
RECOMMENDATIONS IN ACI 318-14:
A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH = 3"
B. CONCRETE CAST IN FORMS AND EXPOSED TO EARTH OR WEATHER:
I. STRUCTURAL SLAB ON GRADE = 2”
II. #6 AND LARGER BARS = 2”
III. #5 BAR, W31 OR D31 WIRE & SMALLER = 1-1/2"
5 EACH REINFORCING BAR MUST BE WIRED TO A CROSS BAR AT A MAXIMUM
SPACING OF 2’-0” ON CENTER.
6 DETAIL BARS IN ACCORDANCE WITH ACI DETAILING MANUAL, LATEST EDITION.
PROVIDE ALL ACCESSORIES NECESSARY TO SUPPORT REINFORCING IN
POSITIONS SHOWN. BAR SUPPORTS AND HOLDING BARS MUST BE PROVIDED
FOR ALL REINFORCING STEEL TO ENSURE MINIMUM CONCRETE COVER. BAR
SUPPORTS MUST BE PLASTIC TIPPED OR STAINLESS STEEL.
7 SHOP DRAWINGS MUST BE SUBMITTED FOR REVIEW AND APPROVED PRIOR
TO FABRICATION AND DELIVERY OF REINFORCING STEEL.
STRUCTURAL STEEL NOTES
1 ALL STRUCTURAL STEEL MUST CONFORM TO THE FIFTEENTH EDITION OF THE
ALLOWABLE STRESS DESIGN "STEEL CONSTRUCTION MANUAL" OF THE
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC).
2 UNLESS OTHERWISE NOTED, ALL MATERIALS MUST BE IN ACCORDANCE WITH
THE FOLLOWING ASTM SPECIFICATIONS:
MEMBER, ALL GALVANIZED ASTM MIN. STRENGTH
STAINLESS STEEL MEMBER ASTM
(FOR DIMENSIONAL REQUIREMENTS)
3 HIGH STRENGTH BOLTS AND NUTS MUST BE SHIPPED TOGETHER IN THE SAME
SHIPPING CONTAINER. FASTENER COMPONENTS MUST BE PROTECTED FROM
DIRT AND MOISTURE IN CLOSED CONTAINERS AT THE SITE OF THE
INSTALLATION. FASTENER COMPONENTS THAT ARE NOT INCORPORATED INTO
THE WORK MUST BE RETURNED TO PROTECTED STORAGE AT THE END OF
THE WORK SHIFT.
4 UNLESS NOTED OTHERWISE, ALL CONNECTIONS MUST BE AISC TYPE 2
“STANDARD FRAMED BEAM CONNECTIONS” WITH ASTM A325 BOLTS, DESIGNED
FOR THE UNIFORM LOAD CONSTANTS FOR LATERALLY SUPPORTED BEAMS
GIVEN IN THE “CONNECTIONS” SECTION OF THE “MANUAL OF STEEL
CONSTRUCTION”.
5 ALL STEEL (EXCLUDING STAINLESS) MUST BE HOT DIPPED GALVANIZED IN
ACCORDANCE WITH ASTM A153 OR A123 AS APPLICABLE. REPAIR DAMAGE TO
GALVANIZED COATINGS USING ASTM A780 ZINC RICH PAINT FOR GALVANIZING
DAMAGED BY HANDLING, TRANSPORTING, CUTTING, WELDING, BOLTING, ETC.
DO NOT HEAT SURFACES TO WHICH REPAIR PAINT HAS BEEN APPLIED. ZINC
RICH COMPOUND MUST BE 95% METALLIC ZINC, BY WEIGHT IN DRIED FILM
CONFORMING TO FED. SPEC. DOD-P-21035A AND MEETING MIL SPEC.
MIL-P-26915A. PROVIDE TWO COATS WITH 2 MIL THICKNESS PER COAT FOR A
TOTAL OF 4 MILS.
6 WELDING OF STRUCTURAL STEEL MUST BE IN ACCORDANCE WITH AWS D1.1
"STRUCTURAL WELDING CODE - STEEL". WELD ELECTRODES MUST BE E70XX.
UNLESS OTHERWISE NOTED, PROVIDE CONTINUOUS FILLET WELDS WITH
MINIMUM SIZE REQUIRED BY TABLE J2.4 OF THE “MANUAL OF STEEL
CONSTRUCTION, ALLOWABLE STRESS DESIGN”. ALL FILLER MATERIAL MUST
HAVE A MINIMUM YIELD STRENGTH OF 58 KSI.
7 WELDING OF STAINLESS STEEL MUST BE IN ACCORDANCE WITH AWS D1.6
“STAINLESS STEEL”. WELD ELECTRODES MUST BE OF A TYPE COMPATIBLE
FOR USE IN JOINING STAINLESS STEELS. ELECTRODE STRENGTH MUST NOT
BE LESS THAN PUBLISHED YIELD STRENGTH OF STAINLESS MEMBERS TO BE
JOINED.
8 PRIOR TO WELDING, THE CONTRACTOR MUST SUBMIT CERTIFICATION FOR
EACH WELDER STATING THE TYPE OF WELDING AND POSITIONS QUALIFIED
FOR, THE CODE AND PROCEDURE QUALIFIED UNDER, DATE QUALIFIED, AND
THE FIRM AND INDIVIDUAL CERTIFYING THE QUALIFICATION TESTS.
9 HOLES IN STEEL MUST BE DRILLED OR PUNCHED. BURNING OF HOLES AND
TORCH CUTTING AT THE SITE IS PROHIBITED.
10 SPLICING OF STEEL MEMBERS IS PROHIBITED.
11 USE LEVELING GROUT AS REQUIRED UNDER BASE PLATES TO A MAXIMUM
DEPTH OF 1/2". FILL WITH GROUT ANY HOLES, OPENINGS OR CRACKS WITHIN
EXISTING CONCRETE LEFT BY THE REMOVAL OF THE OLD STAIRS AND THEIR
COMPONENTS. NON-SHRINK GROUT MUST CONFORM TO ASTM C1107, WITH
NO ASTM C827 SHRINKAGE (GROUT MUST BE NONMETALLIC).
12 PROPRIETARY FRAMING CONNECTIONS MAY BE CONSIDERED FOR USE AT THE
CONTRACTORS OPTION AND EXPENSE. THE CONTRACTOR MUST SUBMIT
COMPLETE PRODUCT DATA FOR ALL COMPONENTS PRIOR TO ORDERING
MATERIALS.
1 STEEL DECK MUST CONFORM TO THE LATEST EDITION OF AMERICAN IRON
AND STEEL INSTITUTE (AISI), “SPECIFICATION FOR THE DESIGN OF
COLD-FORMED STEEL STRUCTURAL MEMBERS” AND STEEL DECK INSTITUTE
(SDI), “DESIGN MANUAL FOR COMPOSITE DECK, FORM DECKS, AND ROOF
DECKS”.
2 STEEL DECK MUST SPAN PERPENDICULAR TO SUPPORTS, UNLESS
OTHERWISE NOTED. ATTACH DECK TO SUPPORTS WITH STAINLESS STEEL
POWDER ACTUATED FASTENERS, STAINLESS STEEL TEK SCREWS AT
SIDELAPS. BASIS OF DESIGN IS X-EDN19 WITH SDK2 STAINLESS STEEL
SEALING CAPS OR EQUIVALENT AT A FASTENING PATTERN AS FOLLOWS:
A. 36/4 (12-INCHES ON CENTER) – TYPICAL, UNLESS NOTED OTHERWISE
B. 36/7 - EXTERIOR BAY OF JOISTS AND JOIST GIRDERS AROUND EXTERIOR
PERIMETER
C. 1/5 POINTS BETWEEN JOISTS – SIDELAPS
D. 36/7 – ROOF OVERHANG AND OPENINGS
3 ANY PERMITTED DECK WELDING MUST BE IN ACCORDANCE WITH AMERICAN
WELDING SOCIETY SPECIFICATION D1.3.
4 ALL ROOF DECK MUST BE GALVANIZED. ALL WELDS, IF ALLOWED, MUST BE
TOUCHED UP WITH GALVANIZING REPAIR PAINT. ALL (NON STAINLESS) STEEL
DECK AND SELF-TAPPING FASTENERS MUST BE GALVANIZED IN ACCORDANCE
WITH ASTM A653, TO A G90 COATING THICKNESS.
5 CONTRACTOR MUST COORDINATE SIZE AND LOCATIONS OF OPENINGS WITH
THE VARIOUS TRADES. ALL STEEL DECK OPENINGS MUST BE SUPPORTED AT
A MINIMUM BY L3X3X1/2 ANGLE FRAMING.
6 MAINTAIN A 3-SPAN CONDITION WHEREVER POSSIBLE (2-SPAN MINIMUM).
7 PROVIDE A 2” MINIMUM BEARING CONDITION AT ALL SUPPORTS, UNO.
8 MAINTAIN 1” MINIMUM EDGE DISTANCE AT ALL CONNECTIONS.
9 WHERE POWDER ACTUATED FASTENERS ARE UTILIZED, FASTENER MUST
FULLY PENETRATE STEEL SUBSTRATE & BEAR SNUG TIGHT TO DECK
MATERIAL.
10 PERMANENT SUSPENDED LOADS MUST NOT BE SUPPORTED BY STEEL DECK.
11 BUTTON PUNCHING IS NOT ALLOWED.
STEEL DECK NOTES
REPAIR SCHEDULE
CAST-IN-PLACE CONCRETE NOTES
REINFORCING STEEL NOTES
W-SHAPES A992 (GRADE 50) / A572 50 KSI
OTHER ROLLED PLATES / SHAPES A36 36 KSI
HSS STRUCTURAL TUBING A500 (GRADE B) 46 KSI
PIPES A53 (GRADE B) 35 KSI
CONNECTION BOLTS A325 (TYPE I) 60 KSI
NUTS A563 (GRADE TO MATCH BOLT)
WASHERS F436
ANCHOR BOLTS / THREADED RODS F1554 36 KSI
SS BOLTS F593 (TYPE 316)
SS NUTS F594 (TYPE 316)
SS WASHER ANSI B18.22.1 (TYPE A PLAIN)
S Y
M D
E S
C R
IP
T
I O N
D A
TE
A
P
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
AS NOTED
S-003
B U
IL
D
IN
G
S P
-9
S
TR
U C
TU
R
A L
N O
TE
S
A
B B
R E
V
IA
TI
O
N S
JDL
12,885,737
JDL ADB
04/14/2023
HAI HUYNH - CNIC
J.B. JONES - UEM
R E
N O
V A
TE
R
E S
E R
V O
IR
S
TR
U
C
TU
R E
R
E P
LA
C
E B
O O
S
TE
R P
U M
P S
TA
TI
O N
DUSTIN A. SCHULZE, RA
1674978
N/A
N O
R F
O
LK
, V
IR
G
IN
IA
N
A V
A L
S T
A T
IO
N
S.M. SWEENEY, PE
JMS
N/A
M
ID
L A
N T
P
W D
N O
R F
O L
K
STRUCTURAL ABBREVIATIONS
ADHESIVE THREADED ANCHOR NOTES
FRP LADDER ADHESIVE NOTES
FRP LADDER NOTES
1 ALL LADDER MATERIALS MUST CONFORM TO ANSI/NSF 61 FOR USE IN WATER
STORAGE TANKS FOR CONSTANT CONTACT WITH POTABLE WATER, DESIGNED
FOR FULL IMMERSION.
2 LADDER ANCHORS MUST BE TYPE 316 STAINLESS STEEL.
3 LADDER ANCHORS – DRILL INTO THE EXISTING CONCRETE AND SET ADHESIVE
THREADED ANCHORS WITH AN EMBEDMENT AND HOLE DIAMETER CAPABLE OF
DEVELOPING 150% OF THE THREADED ANCHOR’S ULTIMATE TENSILE
CAPACITY. SEE "ADHESIVE ANCHOR NOTES" ON THIS SHEET.
4 INSTALL ALL ANCHORS PRIOR TO TANK COATING AND PROTECT THREADS
WITH HEAVY DUTY TAPE.
5 REFER TO ARCHITECTURAL DRAWINGS FOR NEW TELESCOPING SAFETY
POSTS.
1 ADHESIVE ANCHORS FOR INSTALLATION OF THE FRP LADDER AND ANY OTHER
WORK INSIDE THE RESERVOIR MUST MEET THE REQUIREMENTS OF ADHESIVE
THREADED ANCHORS AND MEET THE FOLLOWING:
1.1. BE NSF/ANSI 61 CERTIFIED FOR USE IN CONSTANT CONTACT WITH
POTABLE WATER AND HAVE CURRENT ESR CERTIFICATION.
2 WHERE A MANUFACTURER OF NSF/ANSI 61 CERTIFIED ADHESIVE MATERIAL
CAN NOT BE LOCATED PER ITEM 1.1, AN ADHESIVE MEETING THE REMAINING
REQUIREMENTS MAY BE USED WHEN COATED WITH A NSF/ANSI 61 CERTIFIED
COATING AFTER ANCHOR INSTALLATION AND PRIOR TO LADDER
INSTALLATION.
3 ADHESIVE PRODUCT MUST BE SUITABLE FOR USE IN SUBMERGED HOLES.
1 SUBMIT PRODUCT DATA FOR GOVERNMENT APPROVAL PRIOR TO ORDERING.
ALL ANCHORS MUST BE SUITABLE AND INDEPENDENTLY TESTED FOR USE IN
CRACKED AND UNCRACKED CONCRETE.
2 THREADED ADHESIVE ANCHORS MUST CONFORM TO ASTM F1554, GRADE 36,
OR BETTER AND MEET THE FOLLOWING:
A. TESTING PER ASTM E488, WITH ALLOWABLE LOADS WITHIN 25% OF
ULTIMATE LOADS.
B. ADHESIVE MATERIAL MUST COMPLY WITH ACI 2014 APPENDIX D
SPECIFICATION.
3 FOLLOW MANUFACTURER’S RECOMMENDATIONS INCLUDING THOSE FOR SAFE
HANDLING, MIXING, PLACEMENT, AND CURING OF ADHESIVE.
4 FABRICATE A TEMPORARY OR PERMANENT TEMPLATE FOR USE WHILE
DRILLING REQUIRED HOLES.
5 DRILLED HOLES MUST HAVE A ROUGHENED INTERIOR SURFACE IN
ACCORDANCE WITH ADHESIVE MANUFACTURER’S RECOMMENDATIONS.
6 VACUUM DUST FROM THE BOTTOM AND SIDES OF EACH HOLD USING A
NOZZLE THAT WILL REACH THE BOTTOM OF THE HOLE. INSPECT EACH HOLE
WITH A LIGHT TO ENSURE THAT ALL DUST IS REMOVED.
7 THREADED ANCHOR HOLES MUST BE DRILLED TO A DEPTH AND DIAMETER AS
RECOMMENDED BY THE ADHESIVE MANUFACTURER, BUT NOT LESS THAN
4-INCH EMBEDMENT, UNLESS NOTED OTHERWISE.
8 EDGE DISTANCE FOR ADHESIVE BAR ANCHORS MUST BE 4-INCH MINIMUM.
NTS NOT TO SCALE
OC ON CENTER
OPH OPPOSITE HAND
PL PLATE
PLF POUNDS PER LINEAR FOOT
PSF…