SF30 Amend1 23F2548 5-24.pdf

PDF 232 KB Posted

Attached to
Bldg. 3870 Interior Renovations Federal contract opportunity
Solicitation number
N4008523R2548
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Bldg. 3870 Interior Renovations, newest first.
File Type Posted
ATTACHMENT I- ACKNOWLEDGE OF AMENDMENTS.pdf PDF
ATTACHMENT C- WAGE DETERMINATION.pdf PDF
ATTACHMENT F- PPI TEMPLATE.pdf PDF
23R2548 General Requirements.pdf PDF
ATTACHMENT H-SOLICITATION PROVISIONS.pdf PDF
ATTACHMENT G - Price Proposal Form.pdf PDF
ATTACHMENT A- SPECIFICATIONS.pdf PDF
ATTACHMENT B- DRAWINGS.pdf PDF
ATTACHMENT D- SECNAV 5512.pdf PDF
ATTACHMENT E- ONE DAY PASS FORM.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

�������������
����������
��
���������������
����������
������������
���������
��������������
��

������ ��!"#$%&'��!�(�%&�")*+�,$'-./'+0�0���'�

&')'#1'-�"0�02'�3$")'�-'4#.+"0'-�!�&�02'�&')'#30��!��!!'&4�3&#�&�0��02'�2�%&�"+-�-"0'�43')#!#'-�/"(�&'4%$0�#+�&'5')0#�+��!�(�%&��!!'& ��#��

���6�� ������ ����

�����6������

��������������
��

����������6��������� �� ������

78��9:;<=>?@>A��)�

�
���� ����
����� �����B�����������
�����������
�
������
� ������������������

?:7@C:7@>�<D�E<F9G9>?>9<@H:<C9D9G?>9<@�<D�G<@>=?G> � ��)�+0&")0�#-�)�-'

I ��"/'+-/'+0J/�-#!#)"0#�+�+%/�'& K ��'!!')0#1'�-"0' L ��&'M%#4#0#�+J3%&)2"4'�&'M%#4#0#�+�+%/�'& � ��3&�5')0�+%/�'&�NOP�QRRSTUQVSWX

Y ��"-/#+#40'&'-��(�NOP�Z[\W]�[\Q̂�O[W_�̀X )�-'

E>?@C?=C�D<=:�ab�c=7d8�eeHfbegh�

3�������������.4"�!"&��L��)!&���K ILK

!")#$#0(�)�-'

�i" ��"/'+-/'+0��!�4�$#)#0"0#�+�+%/�'& i� ��-"0'-�Njkk�Olkm�nnX

�o" ��/�-#!#)"0#�+��!�)�+0&")0J�&-'&�+%/�'&

�o� ��-"0'-�Njkk�Olkm�npX ee8��>q9E�9>7:�<@Fr�?;;F97E�><�?:7@C:7@>E�<D�E<F9G9>?>9<@E

���������0��� ��6��

�����������
�#����L ��0��������

���������������������� ���������� ����s � � ��s �

�I ��"))�%+0#+.�"+-�"33&�3&#"0#�+�-"0"�NOP�]WtuT]WvX w�������� ����������� �������������� ��w ea8��>q9E�9>7:�?;;F97E�<@Fr�><�:<C9D9G?>9<@E�<D�G<@>=?G>EH<=C7=E8�

9>�:<C9D97E�>q7�G<@>=?G>H<=C7=�@x:y7=�?E�C7EG=9y7C�9@�9>7:�ez8

)2')*��+' " ��02#4�)2"+.'��&-'&�#4�#44%'-�3%&4%"+0�0����NjRWUTP{�Qu[\Z]T[{X�02'�)2"+.'4�4'0�!�&02�#+�#0'/��L�"&'�/"-'�#+�02'�)�+0&")0��&-'&���

������+%/�'&�#+�#0'/��o"

� ��02'�"��1'�+%/�'&'-�)�+0&")0J�&-'&�#4�/�-#!#'-�0��&'!$')0�02'�"-/#+#40&"0#1'�)2"+.'4�N|uU\�Q|�U\Q̂}W|�T̂�RQ{T̂}�ZPPTUW~�

������QRR]ZR]TQ[TẐ�vQ[Q~�W[U���4'0�!�&02�#+�#0'/��L��3%&4%"+0�0��02'�"%02�&#0(��!�!"&�LK �oK���

) ��02#4�4%33$'/'+0"$�".&''/'+0�#4�'+0'&'-�#+0��3%&4%"+0�0��"%02�&#0(��!�

- ���02'&�NjRWUTP{�[{RW�ZP�_ZvTPTUQ[TẐ�Q̂v�Qu[\Z]T[{X

's��� � �����6����������

����
��������������
�������
�#���i"�����o"��
��������������

��) ��-"0'�4#.+'-

��" ��+"/'�"+-�0#0$'��!�4#.+'&�Nl{RW�Z]�R]T̂[X

��) ��-"0'�4#.+'-

��" ��+"/'�"+-�0#0$'��!�)�+0&")0#+.��!!#)'&�Nl{RW�Z]�R]T̂[X

�L ��-'4)&#30#�+��!�"/'+-/'+0J/�-#!#)"0#�+���]}Q̂T�Wv�V{�����|WU[TẐ�\WQvT̂}|~�T̂USuvT̂}�|ZSTUT[Q[TẐ�UẐ[]QU[�|uV�WU[�_Q[[W]��\W]W�PWQ|TVSW�X

3".'�������!����3".'4

� ��#44%'-��( )�-'

� ��+"/'�"+-�"--&'44��!�)�+0&")0�&�N�u_VW]~�|[]WW[~�UZû[{~�j[Q[W�Q̂v��O���ZvWX ���

��� ��)�+0&")0�&J�!!'&�&

NjT}̂Q[u]W�ZP�RW]|Ẑ�Qu[\Z]T�Wv�[Z�|T}̂X

��� ��%+#0'-�40"0'4��!�"/'&#)"

NjT}̂Q[u]W�ZP��Ẑ[]QU[T̂}��PPTUW]X

�]W�TZu|�WvT[TẐ�ûu|QVSW

�����¦���¤�© ����ª��£����

BLDG. 3870, INTERIOR RENOVATIONS (LITTLE CREEK SITE), JOINT EXPEDITIONARY BASE LITTLE CREEK-FORT STORY

VIRGINIA BEACH, VIRGINIA

Proposal due date of Wednesday, 24 May 2023 at 1400 EST has been extended to 5 June 2023 at 1400 EST.

The purpose of this amendment is to as follows:

(1) Provide responses to PPIs (1-9)

1. PPI RESPONSES:

RFI

No.

Date Submitted

REFERENCE

QUESTION GOVERNMENT

RESPONSE Page Section Para.

1 2-May

There does not appear to be an overall New Work drawing, Can we use the Mechanical overall for measurements as long as they are both the same?

The documents consist of 5 architectural drawings, 3 mechanical drawings, and 4 electrical drawings. This complete package illustrates the complete scope of the project. Graphic scales are provided to assist the contractor in measuring the proposed work.

2 8-May

DRAWINGS SHOW

THIS WALL IN

MEN’S BATHROOM

AS A PARTITION

WALL. DOES IT

STAY OR GET

DEMO’D? (SEE

ATTACHED)

The partial CMU wall illustrated shall be demolished and replaced with a new toilet partition. The tile floor finish shall be continuous

3 8-May

THERE WAS

CONFUSION

BETWEEN

DESIGNER AND

CUSTOMER

WHETHER OR NOT

THESE DOORS

WERE TO STAY OR

BE REPLACED DUE

GLASS DOORS NOT

BEING ALLOWED

DUE TO SECURITY

REASONS (SEE

ATTACHED )

Replacement of the entry doors is not in the scope of work; as there are no specifications or accompanying design for this work, it cannot be competitively bid. Should the customer elect to add this work to the contract, it will need to be negotiated post award.

4 8-May

DRW

AD101-

Note 11

DRAWING AD101 –

NOTE 11 – PREPARE

EXISTING WALLS TO

RECEIVE NEW

CERAMIC TILE

FINISH. WALLS ARE

2 DIFERENT TYPES –

WILL THE CERAMIC

TILE BE ABLE TO

RECEIVE NEW TILE

OR WILL THE TILE

SIDE NEED TO BE

DEMO’D?

IF NOT DEMO’D

WHAT WILL NEED

TO BE DONE TO

THE WALL ONCE

THE FCU &

RELATED PIPING IS

Existing ceramic tile shall be removed and the substrate prepared to receive new ceramic tile as scheduled. FCU and associated piping scheduled to remain shall be temporarily removed, salvaged, and reinstalled on new tile wall finish. Patch and repair wall as required to receive new tile finish.

DEMO’D? (SEE

ATTACHED)

5 8-May

WILL CRANE

SIMULATOR BE

STAYING IN PLACE

WHILE NEW

CEILING TILE IS

BEING INSTALLED?

(SEE ATTACHED)

The large simulator will remain.

6 8-May

SAME CONFUSION

REGARDING THE

GLASS DOORS AND

WHETHER OR NOT

THEY WERE TO

STAY OR BE

REPLACED DUE

SECURITY

REASONS.(SEE

ATTACHED)

Replacement of the entry doors is not in the scope of work; as there are no specifications or accompanying design for this work, it cannot be competitively bid. Should the customer elect to add this work to the contract, it will need to be negotiated post award.

7 8-May

ROOM C15 –

OLD/NOT IN USE

UNIT TO STAY OR

BE DEMO’D? IF

DEMO’D – WALL

REPAIR WILL LIKELY

BE NEEDED BEHIND

THE UNIT.

Remove existing fan coil unit and patch wall as required.

Verify FCU is inoperable prior to removal.

8 8-May

ROOM C16 -

OLD/NOT IN USE

UNIT TO STAY OR

BE DEMO’D? IF

DEMO’D – WALL

REPAIR WILL LIKELY

BE NEEDED BEHIND

THE UNIT. (SEE

ATTACHED)

Remove existing fan coil unit and patch wall as required.

Verify FCU is inoperable prior to removal.

9 8-May Room C16

BOARDED UP

WINDOWS TO

REMAIN OR

OPENED BACK UP?

THEY WERE

BOARDED UP FOR

SIMULATOR DARK

ROOM BUT ROOM

WILL NO LONGER

BE USED AS FOR A

Remove wood window covering and paint window frames as required to match.

SIMULATOR. (SEE

ATTACHED)