Amendment 0004.pdf

PDF 162 KB Posted

Attached to
P170 Ordnance Facilities Recap, Phase 2, Naval Weapons Station Yorktown, Yorktown, Virginia
Solicitation number
N4008523R2529
Issued by

About this file

This is an amendment to a solicitation for construction services. The Navy is seeking to recapitalize ordnance facilities at Naval Weapons Station Yorktown in Virginia. The amendment extends the proposal due date from June 8 to June 13, 2023 at 2:00 PM EDT. It incorporates a revised price proposal form, answers to offeror questions, and changes to drawings and specifications. The revisions include clarifying the use of on-site versus imported topsoil, revising CLIN descriptions and adding new CLINs for wetlands and stream mitigation credits. The solicitation, issued by the Naval Facilities Engineering Command Mid-Atlantic, is for a fixed-price construction contract to recapitalize magazines and related facilities at the weapons station in Yorktown, Virginia.

View the file

Other files

File Type Posted
Attachment H-Price Proposal Form REVISED.docx DOCX document
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
P170 Site Visit Log.pdf PDF
Amendment 0001.pdf PDF
Survey2 dwg 2of8.pdf PDF
Attachment B-SECNAV 5512.pdf PDF
Attachment H-Price Proposal Form.docx DOCX document
Attachment G-Small Business Subcontracting Plan.pdf PDF
Civil2 dwg 5of8.pdf PDF
Electrical dwg 8of8.pdf PDF
Attachment C-Past Performance Questionnaire.docx DOCX document
Attachment K-Site Visit Attendee List.xls XLS spreadsheet
N4008523R2529 P170 ORDNANCE FACILITIES RECAP.pdf PDF
Attachment A-Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Specification 2of2.pdf PDF
Civil1 dwg 4of8.pdf PDF
Geotechnical dwg 3of8.pdf PDF
Attachment L-Criteria for Denying Access to Navy Installations.pdf PDF
Structural dwg 7of8.pdf PDF
Attachment M - Aerial Map NWS Yorktown.pdf PDF
Attachment J-Approved Identity Proofing Documents.pdf PDF
Specification 1of2.pdf PDF
Attachment D-Construction Experience Project Data.docx DOCX document
Landscape dwg 6of8.pdf PDF
Attachment E-Historical Small Business Utilization.pdf PDF
Attachment F-Small Business Participation Commitment Document.pdf PDF
Attachment I-PIEE Vendor Access Instructions.pdf PDF
GeneralHazmatSurvey1 dwg 1of8.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-23-R-2529: P170 ORDNANCE FACILITIES RECAP, PHASE 2, NAVAL WEAPONS STATION YORKTOWN, YORKTOWN, VIRGINIA

All correspondance regarding this solicitation shall be directed via email to Jonathan Durham at jonathan.m.durham.civ@us.navy.mil

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Jun-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008523R2529

X 9B. DATED (SEE ITEM 11)

04-May-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Jun-2023

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008523R2529

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

The purpose of this amendment is to:

1. Extend proposal due date

2. Incorporate a revised Attachment H Price Proposal Form

3. Incorporate PPI responses

4. Incorporate Drawing revisions

5. Incorporate Specification revisions

1. The proposal due date is extended from 08 June 2023 at 2:00PM EDT to 13 June 2023 2:00PM EDT

2. Incorporate revised Attachment H Price Proposal Form

• Attachment H Price Proposal Form Revised is attached separately

3. Incorporate the following PPI Responses

Date submitted Question Gov’t Response

06/07/23 The descriptions for what is to be included in each of these line items (0001E and 0001F) is very close to the same description leading us to believe that they may be addressing the same scope of work. Also, on the bid form for item 001F there is no space to include: quantity, unit, unit price, and total price blank to fill in on the form. Is the description included for 0001F simply further describing the cost to be included in the cost line for 0001E? - if this is the case we will just include the cost for the complete scope 0001F in the 001E line item.

See Attachment H Price Proposal Form Revised

4. Drawing Revisions

DOCUMENT 00 01 15 LIST OF DRAWINGS

1.2 CONTRACT DRAWINGS

On NAVFAC Dwg. No. 12879362 (CS301) Detail A1 – Revise the title to “TYPICAL SECTION AT MAGAZINE & APRON - WITH

VALLEY GUTTER 2' FROM EDGE.”

5. Specification Revisions

SECTION 03 30 00 CAST-IN-PLACE CONCRETE

3.3 FORMS

Add the following to the end of paragraph b.

“Do not chamfer exposed edges of the floor slab where it abuts the adjacent concrete apron as shown in detail C2 on NAVFAC Drawing No. 12879366 (CS402).”

SECTION 31 11 00 CLEARING AND GRUBBING

1.1 SUBMITTALS SD – 03 Product Data

Delete this paragraph in its entirety.

2.1.1 Tree Wound Paint

Delete this paragraph in its entirety.

SECTION 31 23 00.00 20 EXCAVATION AND FILL

2.1.7 Topsoil

Delete this paragraph in its entirety and replace with the following:

“Onsite topsoil is expressly prohibited from use on magazines or their embankments. Magazines and their embankments require imported topsoil that meets the composition requirements of Section 32 92 23, Part

2.2.3 Composition.

3.2.3 Stripping

In the second paragraph, delete the sentence “Onsite topsoil will only be used as cover for the surplus soil fill area stockpiles and all other locations require imported topsoil and will meet the composition requirements of Section 32 92 23 Part 2.2.3 Composition” and replace with the following:

“Onsite topsoil is expressly prohibited from use on magazines or their embankments but can be used in other areas of the site if it satisfies the requirements of Section 32 92 23, Part 2.2.3 Composition.”

SECTION 32 92 19 SEEDING

2.2.1 On-Site Topsoil

Delete this paragraph in its entirety and replace with the following:

“Use of onsite topsoil on magazines or on their embankments is expressly prohibited. Magazines and their embankments require imported topsoil that meets the composition requirements in paragraph 2.2.3 Composition.

In all other areas, when available, use surface topsoil stripped and stockpiled on site in accordance with Section 31 23 00.00 20 EXCAVATION AND FILL and modified as necessary to meet the requirements specified for topsoil in paragraph 2.2.3 Composition. Alternatively, use imported topsoil meeting the requirements specified in paragraph 2.2.3 Composition.”

2.2.3 COMPOSITION

After “Other components must conform to the following limits:”, update the table rows for silt, clay and sand percentages with the following:

Silt 7 to 17 percent Clay 4 to 12 percent Sand 70-82 percent

SECTION 32 92 23 SODDING

2.2.1 On-Site Topsoil

Delete this paragraph in its entirety and replace with the following:

“Use of onsite topsoil on magazines or on their embankments is expressly prohibited. Magazines and their embankments require imported topsoil that meets the composition requirements in paragraph 2.2.3 Composition.

In all other areas, when available, use surface topsoil stripped and stockpiled on site in accordance with Section 31 23 00.00 20 EXCAVATION AND FILL and modified as necessary to meet the requirements specified for topsoil in paragraph 2.2.3 Composition. Alternatively, use imported topsoil meeting the requirements specified in paragraph 2.2.3 Composition.”

2.2.3 COMPOSITION

After “Other components must conform to the following limits:”, update the table rows for silt, clay and

SECTION 32 93 00 EXTERIOR PLANTS

2.2.1 Existing Soil

Delete this paragraph in its entirety.

2.2.2 On-Site Topsoil

Delete this paragraph in its entirety and replace with the following:

“Use of onsite topsoil on magazines or on their embankments is expressly prohibited. Magazines and their embankments require imported topsoil that meets the composition requirements in paragraph 2.2.3 Composition.

In all other areas, when available, use surface topsoil stripped and stockpiled on site in accordance with Section 31 23 00.00 20 EXCAVATION AND FILL and modified as necessary to meet the requirements specified for topsoil in paragraph 2.2.3 Composition. Alternatively, use imported topsoil meeting the requirements specified for topsoil in paragraph 2.2.3 Composition.“

2.2.4 COMPOSITION

After “Other components must conform to the following limits:”, update the table rows for silt, clay and

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 08-Jun-2023 02:00 PM to 13-Jun-

2023 02:00 PM.

CLIN 0007

The CLIN description has changed from Deductive Option 1 to Option Item 6.

The CLIN extended description has changed from:

Price deduction per magazine for providing Magazine Embankment Fill consisting of a processed blend of reused excavated CL, CH or SC onsite soils mixed with a minimum of 25 percent imported ASTM C33 sand in lieu of using all imported material for the Magazine Embankment Fill. Soil processing must comply with Spec Section 31 23 00.00 20, Part 2.1.1.1.1 and the blended soil material must meet the requirements of Spec Section 31 23 00.00 20, Part

2.1.1 & 2.1.5.

To:

Price for providing work in connection with payment of purchase price of compensatory mitigation credits for non-tidal wetlands to selected wetland bank, complete in accordance with the regulatory permit requirements, but excluding work provided in another Priced line item.

CLIN 0008 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Option Item 7

FFP

Price for providing work in connection with payment of purchase price of compensatory mitigation for stream credits to selected wetland bank, complete in accordance with the regulatory permit requirements, but excluding work provided in another Priced line item.

FOB: Destination

NET AMT

CLIN 0009 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Deductive Option 1

FFP

Price deduction per magazine for providing Magazine Embankment Fill consisting of a processed blend of reused excavated CL, CH or SC onsite soils mixed with a minimum of 25 percent imported ASTM C33 sand in lieu of using all imported material for the Magazine Embankment Fill. Soil processing must comply with Spec Section 31 23 00.00 20, Part 2.1.1.1.1 and the blended soil material must meet the requirements of Spec Section 31 23 00.00 20, Part 2.1.1 & 2.1.5.

FOB: Destination

NET AMT

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following Acceptance/Inspection Schedule was added for CLIN 0008:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for CLIN 0009:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

(End of Summary of Changes)