Maintenance and Repair of Railroad Trackage at Portsmouth Naval Shipyard, Kittery, Maine
Solicitation number
N4008523R2525
Issued by

View the file

Other files

File Type Posted
J-1502000-05B West Crane Map Set.pdf PDF
J-1502000-05A East Crane Map Set.pdf PDF
J 0200000 10 ELINS Track and Rail.xlsx XLSX spreadsheet
J-1502000-03 PNSY Site Map.pdf PDF
J 0200000 10 ELINS Track and Rail.xlsx XLSX spreadsheet
N4008523R2525 SECTION J.pdf PDF
N4008523R2525 RFP.pdf PDF
N4008523R2525 SECTION C.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

MAINTENANCE AND REPAIR OF RAILROAD TRACKAGE AT PORTSMOUTH NAVAL SHIPYARD, KITTERY, MAINE.

This Amendment is issued to incorporate Section J, attachments J-1502000-03 PNSY Site Map, J-1502000-05A East Crane Map, J-1502000-05B West Crane Map and Pre Proposal Inquiries and Responses. In addition, a revised Secion J, J-020000-10.

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Mar-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008523R2525

X 9B. DATED (SEE ITEM 11)

01-Mar-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Mar-2023

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008523R2525

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 001

Pre-Proposal Inquiries & Responses

1. Item 2.7.1.1 calls for a Project Manager with authority to act for the contractor on all matters relating to this contract. For the most part this contract will require a two man crew sweeping, vacuuming and lubricating switch components. No one on the crew will have the authority to act on all matters regarding this contract. Are you going to require that the contractor station a third man on site to act as a project manager?

Response: No, there will not be a need to have the Project Manager onsite at all times. The PM or alternate shall be made available (via phone or onsite) as the one point of contact for the government. This person would have the authority to act for the contractor on all contract matters relating to this contract.

2. Item 2.7.1.2 calls for a Quality Manager to be available within one hour. This would require us to assign another person to the project just to look after two men who are sweeping, vacuuming and lubricating switch components. Are we going to be expected to comply with this Item?

Response: The Quality Manager or alternate may be the same person as the SSHO (1 person). The Quality Manager does not need to be onsite at all times, however, the SSHO will be required to be onsite during high risk work.

3. Item 2.7.1.3 calls for an on-site Site Safety and Health Officer. Again, this is a two man crew sweeping, vacuuming and lubricating switch components. Are we expected to comply with this item?

Response: The SSHO and Quality Manager may be the same person (1 person). The SSHO will be required to be onsite during high risk work.

(End of Summary of Changes)