Sol23Q2539 Attachments.pdf
PDF 2 MB Posted
- Attached to
- Waste Collection at Morehead City Port Terminal
- Solicitation number
- N4008523Q2539
About this file
This document provides templates for a past performance questionnaire and technical experience form related to a waste collection services solicitation. The solicitation is for waste collection at the Morehead City Port Terminal and is being conducted by the Department of the Navy Naval Facilities Engineering Command. Offerors are required to submit completed past performance questionnaires from references as well as a technical experience form outlining their relevant experience with waste collection contracts. The past performance questionnaire asks for client information and ratings of the offeror's performance on factors such as quality, schedule, management and regulatory compliance. The technical experience form requests details of prior contracts including location, description, role, percentage of work self-performed, value and award/completion dates. Contact information for client references is also required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol N4008523Q2539.pdf | ||
| Pre-Solicitation N4008523Q2539.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J-00000-01
DEFINITIONS AND ACRONYMS
Definition Description Assessment A general term referring to either a survey or inspection of a facility to determine condition.
Asset A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program.
Business Management System (BMS)
A web-based tool that provides a systematic method for the management of business processes, common practices, and process quality improvements that produce and support the most efficient and effective delivery of NAVFAC’s products and services.
Competent Person A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.
Component Inventory Management Unit
(CIMU)
An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance.
Confined Work Space A space that is large enough and so configured that a person may bodily enter a space (such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.
Contracting Officer
(KO)
That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
Contractor Representative
That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
Direct Material Costs The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.
Electronic Operation And Maintenance And Support Information (eOMSI)
A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle.
Generally it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats.
Equipment Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.
Facility A building or structure designed and created to serve a particular function.
Definition Description Fixed Burden Rate
(FBR)
The additional costs (expressed in percent of direct material cost) for ordering, handling, and stockpiling materials and repair parts. For example, if the offeror's Fixed Burden Rate for materials in the Base Period is 10% then:
$100,000.00 + ($100,000.00 x 10%) = $110,000.00
The Government will compensate the Contractor for the required parts and materials and not the total amount shown in Schedule of Indefinite Delivery Indefinite Quantity Work.
Frequency Of Service Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.
Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.
Government Furnished Property (GFP)
Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Infrastructure Condition Assessment Program
(ICAP)
A Navy automated data management program that utilizes historical asset lifecycle data and a structured assessment process to evaluate the condition facilities and their components.
Inspection A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.
Job or Work Order An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.
Maintenance And Repair
The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.
USMC MAXIMO A specially configured software version of MAXIMO®, a commercially available computerized maintenance management system (CMMS), adopted by NAVFAC for enterprise facility asset data management. The terms “MAXIMO”, “NAVFAC MAXIMO” or “Government’s MAXIMO” shall be used interchangeably in the document.
Performance Assessment
A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Performance Assessment Representative (PAR)
That individual designated by the KO to be responsible for the monitoring of Contractor performance.
Pre-Expended Bin Materials And Supplies
The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less.
Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.
Property Administrator An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract
Property Management Program
A Government program established for the purpose of reviewing and approving the Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.
Definition Description Quality Assurance
(QA)
The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.
Quality Control (QC) The observation techniques and activities used to fulfill requirements for quality.
R. S. Means A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means".
Real Property Inventory Equipment (RPIE)
A Government owned or leased individual pieces of equipment, apparatus, or fixture that are essential to the function of the real property (i.e. plumbing, electrical, heating, cooling and elevators). It is physically attached to, integrated into, and built in or on the property.
Individual RPIE’s can be combined to make a CIMU to facilitate facilities management.
An individual RPIE can also be a CIMU if the equipment is complex enough to require its own management planning.
Response Time The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.
Unit Priced Labor (UPL) Hour
The unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity;
costs for pre-expended bin materials, union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.
ATTACHMENT J-00000-02
DIRECTIVES, INSTRUCTIONS, AND REFERENCES
Reference Title
ANSI/ISEA 107-2010 High Visibility Garment Standard
29 CFR 1910.120 Hazardous Materials - Hazardous waste operations and emergency response
29 CFR 1910.134 Personal Protective Equipment-Respiratory protection.
29 CFR 1926.16 Safety and Health Regulations for Construction
29 CFR 1926.59 Occupational Health and Environmental Controls - Hazard communication
40 CFR 247
Comprehensive Procurement Guideline for Products Containing Recovered Materials
DFARS 252.223-7004 Drug Free Work Force
EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements
E.O. 13423 Executive Order Strengthening Federal Environmental, Energy, and Transportation Management
FAR 52.223-2
Affirmative Procurement of Biobased Products under Service and Construction Contracts
FAR 52.223-3 Hazardous Material Identification and Material Safety Data Sheet
FAR 52.228-5 Insurance – Work On A Government Installation
FAR 52.246-4 Inspection of Services Fixed-Price
NFPA 10 Standard for Portable Fire Extinguishers
NFPA 241 Standard for Safeguarding Construction, Alteration, and Demolition Operations
NFPA 51B Standard for Fire Prevention During Welding, Cutting and other Hot Work
NFPA 70 National Electric Code
NFPA 70E Standard for Electrical Safety in the Workplace
P.L. 91-596 Occupational Safety and Health Act
ATTACHMENT J-00000-03
ELIN PRICING SHEET
Line Item 0001 Firm Fixed Price/Recurring - Base Period
PRICES TO PERFORM WASTE COLLECTION SERVICES AT MOREHEAD CITY PORT - FIRM
FIXED PRICE/RECURRING - IN ACCORDANCE WITH SCOPE OF WORK, ELIN A001AA
ELIN/Sub
ELIN
DESCRIPTION FREQ QTY
UNIT
OF
ISSUE
UNIT
PRICE
TOTAL
A001 A001AA Furnish, maintain, and service one, eight (8) cubic yard front-loading waste collection container
12 1 EA $0.00
TOTAL BASE YEAR FFP/RECURRING WORK ELIN A001AA $0.00
Line Item 0002 Firm Fixed Price/Recurring - First Option
PRICES TO PERFORM WASTE COLLECTION SERVICES AT MOREHEAD CITY PORT - FIRM
FIXED PRICE/RECURRING - IN ACCORDANCE WITH SCOPE OF WORK, ELIN B001AA
ELIN/Sub
ELIN
DESCRIPTION FREQ QTY
UNIT
OF
ISSUE
UNIT
PRICE
TOTAL
B001 B001AA Furnish, maintain, and service one, eight (8) cubic yard front-loading
TOTAL FIRST OPTION FFP/RECURRING WORK ELIN B001AA $0.00
Line Item 0003 Firm Fixed Price/Recurring - Second Option
FIXED PRICE/RECURRING - IN ACCORDANCE WITH SCOPE OF WORK, ELIN C001AA
ELIN/Sub
ELIN
DESCRIPTION FREQ QTY
UNIT
OF
ISSUE
UNIT
PRICE
TOTAL
C001 C001AA Furnish, maintain, and service one, eight (8) cubic yard front-loading
TOTAL SECOND OPTION FFP/RECURRING WORK ELIN C001AA $0.00
Line Item 0004 Firm Fixed Price/Recurring - Third Option
FIXED PRICE/RECURRING - IN ACCORDANCE WITH SCOPE OF WORK, ELIN D001AA
ELIN/Sub
ELIN
DESCRIPTION FREQ QTY
UNIT
OF
ISSUE
UNIT
PRICE
TOTAL
D001 D001AA Furnish, maintain, and service one, eight (8) cubic yard front-loading
TOTAL THIRD OPTION FFP/RECURRING WORK ELIN D001AA $0.00
Line Item 0005 Firm Fixed Price/Recurring - Fourth Option
FIXED PRICE/RECURRING - IN ACCORDANCE WITH SCOPE OF WORK, ELIN E001AA
ELIN/Sub
ELIN
DESCRIPTION FREQ QTY
UNIT
OF
ISSUE
UNIT
PRICE
TOTAL
E001 E001AA Furnish, maintain, and service one, eight (8) cubic yard front-loading
TOTAL FOURTH OPTION FFP/RECURRING WORK ELIN E001AA $0.00
TOTAL CONTRACT $0.00
ATTACHMENT J-00000-05
CONTRACTOR SIGNIFICANT INCIDENT REPORT (CSIR)
[Type text]
Initial Report
Follow-up Report
Final Report
Contractor Significant Incident Report (CSIR)
1. General Information Contracting Activity/ROICC Office:
Accident Classification:
Injury Fatality Environment Procedural Issues Lessons Learned
Illness Property Damage Other_
Involving:
Confined Space Equip/Mrt Ver/Mat Handling (Heavy Construction Equip.) Hazardous Material
Crane and Rigging Equip/Mrt Ver/Mat Handling (Material Handling) Trenching/Excavation
Diving Equip/Mrt Ver/Mat Handling (Man-Lift/Elevated Platform) Waterfront/Marine
Demolition/Renovation Fall from Ladder Fall from Scaffold Other_
Electrical Fall from Roof Fire
2. Personal Information Name (Last, First, MI): Age: Sex:
Job Title/Description: Employed By:
Supervisor Name (Last, First, MI) & Title: Was the person trained to perform this activity/task?
Yes No
What type of training was received (OJT, classroom, etc)?
Date of the most recent formal training and topics discussed?
3. Witness Information Witness #1: Name (Last, First, MI): Job Title/Description:
Employed By: Supervisor Name (Last, First, MI):
Witness #2: Name (Last, First, MI): Job Title/Description:
Employed By: Supervisor Name (Last, First, MI):
Additional Witnesses: Yes No (List any additional witnesses on a separate sheet and attach.)
4. Contract Information Type of Contract:
A/E BOS CLEAN Construction Design Build FSCC FSSC
JOC RAC Service Other_
Contract Number & Title: Industrial Group & Industrial Type:
Prime Contractor Name/Address/Phone & Fax No:
Safety Manager (Last, First, MI):
Insurance Carrier:
Sub Contractor Name/Address/Phone & FAX No:
Safety Manager (Last, First, MI):
Insurance Carrier:
5. Accident Description Date of Accident: Time of Accident: Exact Location of Accident:
Describe the accident in detail in your words: (Use the back of page if you need additional space)
Direct Cause(s) of Accident:
Indirect Cause(s) of Accident:
Action(s) taken to prevent re-occurrence or provide on-going corrective actions:
Corrective Action Beginning Date: Anticipated Completion Date:
Personal Protective Equipment:
Available and used Available and not used Not Required
Not related to Mishap Wrong PPE for job
List PPE Used:
Type of Construction Equipment (Make, Model, Serial #, VIN#) Involved:
Was Hazardous Material Spilled/Released? Yes No
Please List Hazardous Material(s) Involved:
Who provided first aid or cleanup of mishap site?
Any blood-borne pathogen exposure, other than EMTs? Yes No
Who?
List OSHA and WM-385-1-1 standards that were violated:
Was site secured and witness statements taken immediately? Yes No
By Whom?
6. Injury Illness/Fatality Information Severity of Injury/Illness:
Fatality Lost Workday Case Involving Days Away From Work
Temporary Disabillity Recordable Workday Case Involving Restricted Duty
Permanent Total Disability Other Recordable Case Recordable First Aid Case
Permanent Partial Disability Non-Recordable Case No Injury Estimated Days Lost: Estimated Days Hospitalized: Estimated Days Restricted Duty:
List Primary Body Part Affected: List Other Body Part(s) Affected:
Nature of Injury/Illness for Primary Body Part (Examples: Amputation, Burn, Hernia):
Type of Accident (Examples: Fall same level, Lifting, Bitten, Exerted):
Source of Accident (Examples: Crane, Carbon Monoxide, Ladder, Welding Equipment):
7. Casual Factors (Explain answers on supplementary sheet)
• Design – Design of facility, workplace, or equipment was a factor? Yes No
• Inspection/Maintenance – Inspection & Maintenance procedures were a factor? Yes No
• Persons Physical Condition – In your opinion, the physical condition of the person was a factor?
Yes No
• Operation Procedures – Operating procedures were a factor? Yes No
• Job Practices – One or more job safety/health practices not being followed when the accident occurred contributed to the accident?
Yes No
• Human Factors – One or more human factors, such as a person’s size or strength contributed to the accident?
Yes No
• Environmental Factors – Heat, cold, dust, sun, glare, etc., contributed to the accident?
Yes No
• Chemical and Physical Agent Factors – Exposure to chemical agents, such as dust, fumes, mist, vapors, or physical agents such as noise, radiation, etc., contributed to the accident?
Yes No
• Office Factors – Office setting such as lifting office furniture, carrying, stooping, contributed to the accident?
Yes No
• Support Factors – Inappropriate tools/resources were provided to perform the task?
Yes No
• PPE – Improper selection, use or maintenance of PPE contributed to the accident?
Yes No
• Drugs/Alcohol – In your opinion, were drugs or alcohol a factor? Yes No
• Job Hazard Analysis – The lack of an adequate (IAW-EM-385-1-1 Sec 01.A) activity hazard analysis was a contributing factor.
Yes No
• Job Hazard Analysis – JHA was not site specific and/or did not address the type of work/operations performed when the mishap occurred.
Yes No
• Management – A lack of adequate supervision contributed to the accident. Yes No
• Management – Inadequate information was provided at pre con meeting. Yes No
8. OSHA Information Date OSHA was Notified: Date(s) of Investigation: Date of citation:
(Attach Copy) Dollar amount of Penalties:
9. Report Preparer Name (Last, First, MI): Date of Report:
Title:
Employer:
Phone #:
Signature:
Contractor Significant Incident Report (CSIR) Instructions 1
CONTRACTOR SIGNIFICANT INCIDENT REPORT (CSIR) INSTRUCTIONS
Complete Sections Appropriate to Incident (Rev. 06/02).
NOTE: THE ATTACHED CSIR FORM IS TO BE USED BY CONTRACTORS TO RECORD THE
RESULTS OF THEIR ACCIDENT/INCIDENTS INVESTIGATIONS AND SHALL BE PROVIDED TO THE
CONTRACTING OFFICER WITHIN THE REQUIRED TIMEFRAMES.
GENERAL. Complete a separate report for each person who was injured in the accident. A report needs to be completed for all OSHA recordable accidents, property damage in excess of $2000.00 (This amount is for record purposes only. GOV is not required to enter property damage reports into FAIR database if it is less than $10,000.00.), WHE accidents, or near miss/high visibility mishaps. Please type or print legibly. Appropriate items shall be marked with an “X” in box(es), non-applicable sections shall be marked “N/A”. If additional space is needed, provide the information on a separate sheet of paper and attach to the completed form.
Mark the report:
INITIAL – If this form is being used as initial notification of a Fatality or High Visibility Mishap. The initial form is due within 4 hours of a serious accident. A form marked ‘Follow-up’ or ‘Final’ is required within 5 days.
FOLLOW-UP – If you are providing additional information on a report previously submitted.
FINAL – If you are providing a completed report and expect no changes.
SECTION 1 – GENERAL INFORMATION
CONTRACTING ACTIVITY/ROICC OFFICE - Enter the name and address of the Contracting Office administering the contract under which the mishap took place (e.g. ROICC MCBH, ROICC NORFOLK, PWC GUAM, etc.).
ACCIDENT CLASSIFICATION - INJURY/ILLNESS/FATALITY/PROPERTY DAMAGE/-PROCEDURAL ISSUES/- ENVIRONMENTAL/LESSONS LEARNED/OTHER – Mark the appropriate block(s) if the incident resulted in any of these conditions.
INVOLVING - If the mishap involved any of the conditions listed under “Involving” mark the appropriate box(es). Specific questions associated with each of these conditions are available from the Contracting Officer to assist you in your investigation. When these questions are used they shall be attached as part of this report.
SECTION 2 - PERSONAL INFORMATION
NAME - Enter last name, first name, middle initial of person involved.
AGE - Enter age.
SEX - Enter M for Male and F for Female.
JOB TITLE/DESCRIPTION - Enter the job title/description assigned to the injured person (e.g. carpenter, laborer, surveyor, etc.).
EMPLOYED BY - Enter employment company name of the person involved.
SUPERVISOR’S NAME & TITLE - Enter name and title of the immediate supervisor.
WAS PERSON TRAINED TO PERFORM ACTIVITY/TASK? - For the purpose of this section “trained” means the person has been provided the necessary information (either formal and/or on-the-job (OJT) training) to competently perform the activity/task in a safe and healthful manner.
TYPE OF TRAINING - Indicate the specific type of training (classroom or on-the-job) that the injured person received before the accident happened.
DATE OF MOST RECENT FORMAL TRAINING/TOPICS DISCUSSED - Enter the month, day, and year of the last formal training completed that covered the activity/task being performed at the time of the accident. List topics that were discussed at the training identified above.
SECTION 3 - WITNESS INFORMATION
The following applies to Witness #1 and Witness #2:
WITNESS NAME - Enter last name, first name, middle initial of the witness.
JOB DESCRIPTION/TITLE - Enter the job title/description assigned to the witness (e.g. carpenter, laborer, surveyor, etc.).
EMPLOYED BY - Enter the name of the employment company of the witness.
SUPERVISORS NAME - Enter name of immediate supervisor of the witness.
ADDITIONAL WITNESSES - Provide same information, as above, for each witnesses. Use additional pages if necessary.
SECTION 4 - CONTRACTOR INFORMATION
TYPE OF CONTRACT - Mark appropriate box. A/E means architect/engineer. If “OTHER” is marked, specify type of contract on line provided.
CONTRACT NUMBER/TITLE - Enter complete contract number and tile of prime contract (e.g. N62477-85-C-0100, 184 Pearl City Hsg. Revitalization).
CONSTRUCTION INDUSTRIAL GROUP AND INDUSTRIAL TYPE – This is the type of construction that will be done at this project.
Contractor Significant Incident Report (CSIR) Instructions 2
1. First, you must choose the Industrial Group. You have 4 choices to choose from: (NOTE! Review of the Industrial Types below and knowing what the projects scope of work is will assist you in deciding what the Industrial Group should be.)
a. Buildings
b. Heavy Industrial
c. Infrastructure
d. Light Industrial
2. Once you have chosen the Industrial Group, you now select the Industrial Type. You have multiple choices under each Group, chose the one you feel fits the project most closely because on most projects there won’t be an exact match:
a. Buildings:
(1) Communications Ctr.
(2) Dormitory/Hotel
(3) High-rise Office
(4) Hospital
(5) Housing
(6) Laboratory
(7) Low-rise Office
(8) Maintenance Facility
(9) Parking Garage
(10) Physical Fitness Ctr.
(11) Restaurant/Nightclub
(12) School
(13) Warehouse
b. Heavy Industrial:
(1) Chemical Mfg.
(2) Electrical (Generating)
(3) Environmental
(4) Metals Refining/Processing
(5) Mining
(6) Natural Gas Processing
(7) Oil Exploration/Production
(8) Oil Refining
(9) Pulp and Paper
c. Infrastructure:
(1) Airport
(2) Electrical Distribution
(3) Flood Control
(4) Highway
(5) Marine Facilities
(6) Navigation
(7) Rail
(8) Tunneling
(9) Water/Wastewater
d. Light Industrial:
(1) Automotive Assembly/Mfg.
(2) Consumer Products Mfg.
(3) Foods
(4) Microelectronics Mfg.
(5) Office Products Mfg.
(6) Pharmaceuticals Mfg.
CONTRACTOR’S NAME/ADDRESS/PHONE NUMBER
(1) PRIME - Enter the exact name (title of firm), address, phone and fax numbers of the prime contractor.
(2) SUBCONTRACTOR - Enter the exact name, address, phone and fax numbers of any subcontractor involved in the accident.
SAFETY MANAGER’S NAME
(1) PRIME - Enter the name of the prime contractor safety manager.
(2) SUBCONTRACTOR - Enter the name of the subcontractors safety manager.
INSURANCE CARRIER
(1) PRIME - Enter the exact name/title of the prime’s insurance company. Policy number not required.
(2) SUBCONTRACTOR - Enter the exact name of the subcontractor’s insurance company. Policy number not required.
SECTION 5 - ACCIDENT DESCRIPTION
DATE OF ACCIDENT - Enter the month, day, and year of accident.
TIME OF ACCIDENT - Enter the local time of accident in military time. Example: 14:30 hrs (not 2:30 p.m.).
EXACT LOCATION OF ACCIDENT - Enter facts needed to locate the accident scene (installation/project name, building/room number, street, direction and distance from closest landmark, etc.).
DESCRIBE THE ACCIDENT IN DETAIL. Fully describe the accident in the space provided. If property damage involved, give estimated dollar amount of damage and/or repair costs involved. If additional space is needed continue on a separate sheet and attach to this report. Give the sequence of events that describe what happened leading up to and including the accident. Fully identify personnel and equipment involved and their role(s) in the accident. Ensure that relationships between personnel and
Contractor Significant Incident Report (CSIR) Instructions 3 equipment are clearly specified. Ensure questions below regarding direct cause(s), indirect cause(s), and actions taken are answered. NOTE! Review questions in Section 7 below before completing.
DIRECT CAUSE(S) - The direct cause is that single factor which most directly lead to the accident. See examples below.
INDIRECT CAUSE(S) - Indirect cause are those factors, which contributed to, but did not directly initiate the occurrence of the accident.
Examples for Direct and Indirect Cause:
1. Employee was dismantling scaffold and fell 12 feet from unguarded opening.
Direct cause: Failure to provide fall protection at elevation Indirect causes: Failure to enforce safety requirements: improper training/motivation of employee (possibility that employee was not knowledgeable of fall protection requirements or was lax in his attitude toward safety); failure to ensure provision of positive fall protection whenever elevated; failure to address fall protection during scaffold dismantling in phase hazard analysis.
2. Private citizen had stopped his vehicle at intersection for red light when vehicle was struck in rear by contractor vehicle. (note contractor vehicles was in proper safe working condition.)
Direct cause: Failure of contractor driver to maintain control of and stop contractor vehicle within safe distance.
Indirect cause: Failure of employee to pay attention to driving (defensive driving).
ACTION(S) TAKEN TO PREVENT RE-OCCURRENCE OR PROVIDE ON-GOING CORRECTIVE ACTIONS. Fully describe all the actions taken, anticipated, and recommended to eliminate the cause(s) and prevent reoccurrence of similar accidents/illnesses.
Continue on back or additional sheets of paper if necessary to fully explain and attach to the complete report form.
CORRECTIVE ACTION DATES -
(1) Beginning - Enter the date when the corrective action(s) identified above will begin.
(2) Anticipated Completion - Enter the date when the corrective action(s) identified above will be completed.
PERSONAL PROTECTIVE EQUIPMENT (PPE) - Mark appropriate box(es) and list PPE which was being used by the injured person at the time of the accident (e.g. protective clothing, shoes, glasses, goggles, respirator, safety belt, harness, etc.)
TYPE OF CONTRACTOR EQUIPMENT - Enter the Serial Number, Model Number and specific type of equipment involved in the mishap (e.g. dump truck (off highway), crane (rubber tire), pump truck (concrete), etc.).
WAS HAZARDOUS MATERIAL SPILLED/RELEASED? - Mark appropriate block and list name(s) of any reportable quantities of hazardous materials spilled/released during the mishap.
WHO PROVIDED FIRST AID OR CLEAN-UP OF MISHAP SITE? - List name(s) of individual(s) and employer, if known.
ANY BLOOD-BORNE PATHOGEN EXPOSURE, OTHER THAN EMT? - Mark appropriate block and list name(s) of individual(s) and employer, if known.
LIST OSHA AND/OR EM 385-1-1 STANDARDS THAT WERE VIOLATED. - Self explanatory.
WAS SITE SECURED AND WITNESS STATEMENT TAKEN IMMEDIATELY? - Mark appropriate block and list by whom.
SECTION 6 - INJURY/ILLNESS/FATALITY INFORMATION
SERVERITY OF INJURY/ILLNESS – Mark appropriate box.
ESTIMATED DAYS LOST - Enter the estimated number of workdays the person will lose from work. Update when final data is known.
ESTIMATED DAYS HOSPITALIZED - Enter the estimated number of workdays the person will be hospitalized. Update when final data is known.
ESTIMATED DAYS RESTRICTED DUTY - Enter the estimated number of workdays the person, as a result of the accident, will not be able to perform all of their regular duties. Update when final data is known.
BODY PART(S) AFFECTED - Enter the most appropriate primary and when applicable, secondary, etc. body part(s) affected (e.g.
arm: wrist: abdomen: single eye; jaw : both elbows: second finger: great toe: collar bone: kidney, etc.).
NATURE OF INJURY/ILLNESS FOR PRIMARY BODY PART - Enter the most appropriate nature of injury/illness (e.g. amputation, back strain, dislocation, laceration, strain, asbestosis, food poisoning, heart conditions, etc.).
TYPE AND SOURCE OF INJURY/ILLNESS - Type and Source Codes are used to describe what caused the incident.
(1) TYPE Code stands for an “Action” (Example: Worker, installing conduit, lost his balance and fell five feet from a ladder.
Type Code: Fell different levels”.) Select the most appropriate Type of injury from the list below:
TYPE OF INJURY/ILLNESS
STRUCK
BY/AGAINST
CONTACTED
CONTACTED WITH (INJURED PERSON MOVING)
CONTACTED BY (OBJECT WAS MOVING)
FELL, SLIPPED, TRIPPED
SAME LEVEL/DIFFERENT LEVEL/NO FALL
EXERTED
LIFTED, STRAINED BY (SINGLE ACTION)
STRESSED BY (REPEATED ACTION)
CAUGHT
ON/IN/BETWEEN
EXPOSED
INHALED/INGESTED/ABSORBED/EXPOSED TO
PUNCTURED, LACERATED
PUNCTURED BY/CUT BY/STUNG BY/BITTEN BY
TRAVELING IN
(2) SOURCE Code stands for an “object or substance.” (Example: Worker, installing conduit, lost his balance and fell five feet from a ladder. Source Code: “Ladder”.) Select the most appropriate Source of injury from the list below:
Contractor Significant Incident Report (CSIR) Instructions 4
SOURCE OF INJURY/ILLNESS
BUILDING OR WORKING AREA
WALKING/WORKING AREA
STAIRS/STEPS
LADDER
FURNITURE
BOILER/PRESSURE VESSEL
EQUIPMENT LAYOUT
WINDOWS/DOORS
ELECTRICITY
DUST, VAPOR, ETC.
DUST (SILICA, COAT, ETC.)
FIBERS
ASBESTOS
GASES
CARBON MONOXIDE
MIST, STEAM, VAPOR, FUME
WELDING FUMES
PARTICLES (UNIDENTIFIED)
ENVIRONMENT CONDITION
TEMPERATURE EXTREME (INDOOR)
WEATHER (ICE, RAIN, HEAT, ETC.)
FIRE, FLAME, SMOTE (NOT TABACCO)
NOISE
RADIATION
LIGHT VENTILATION
TOBACCO SMOKE
STRESS (EMOTIONAL)
CONFINED SPACE
CHEMICAL, PLASTIC, ETC.
DRY CHEMICAL - CORROSIVE
DRY CHEMICAL - TOXIC
DRY CHEMICAL - EXPLOSIVE
DRY CHEMICAL - FLAMMABLE
LIQUID CHEMICAL - CORROSIVE
LIQUID CHEMICAL - TOXIC
LIQUID CHEMICAL - EXPLOSIVE
LIQUID CHEMICAL - FLAMMABLE
PLASTIC
WATER
MEDICINE
MACHINE OR TOOL
HAND TOOL (POWERED: SAW, GRINDER, ETC.)
HAND TOOL (NON POWERED)
MECHANCIAL POWER TRANSMISSION APPARATUS
GUARD, SHIELD (FIXED, MOVEABLE, INTERLOCK)
VIDEO DISPLAY TERMINAL
PUMP, COMPRESSOR, AIR PRESSURE TOOL
HEATING EQUIPMENT
WELDING EQUIPMENT
INANIMATE OBJECT
BOX, BARREL, ETC.
PAPER
METAL ITEM, MINERAL
NEEDLE
GLASS
SCRAP, TRASH, WOOD
FOOD
CLOTHING, APPAREL, SHOES
MACHINE OR TOOL
HAND TOOL (POWERED: SAW, GRINDER, ETC.)
HAND TOOL (NON POWERED)
MECHANCIAL POWER TRANSMISSION APPARATUS
GUARD, SHIELD (FIXED, MOVEABLE, INTERLOCK)
VIDEO DISPLAY TERMINAL
PUMP, COMPRESSOR, AIR PRESSURE TOOL
HEATING EQUIPMENT
WELDING EQUIPMENT
INANIMATE OBJECT
BOX, BARREL, ETC.
PAPER
METAL ITEM, MINERAL
NEEDLE
GLASS
SCRAP, TRASH, WOOD
FOOD
CLOTHING, APPAREL, SHOES
VEHICLE
AS DRIVER OF PRIVATELY OWNED, RENTAL VEH.
AS PASSENGER OF PRIVATELY OWNED, RENTAL VEH.
DRIVER OF GOVERNMENT VEHICLE
PASSENGER OF GOVERNMENT VEHICLE
COMMON CARRIER (AIRLINE, BUS, ETC.)
AIRCRAFT (NOT COMMERCIAL)
BOAT, SHIP, BARGE
ANIMATE OBJECT
DOG
OTHER ANIMAL
PLANT
INSECT
HUMAN (VIOLENCE)
HUMAN (COMMUNICABLE DISEASE)
BACTERIA, VIRUS (NOT HUMAN CONTACT)
MATERIAL HANDLING EQUIPMENT
EARTHMOVER (TRACTOR, BACKHOE, ETC.)
CONVEYOR (FOR MATERIAL AND EQUIPMENT)
ELEVATOR, ESCALATOR, PERSONNEL HOIST
HOIST, SLING CHAIN, JACK
CRANE
FORKLIFT
HANDTRUCK , DOLLY
PERSONAL PROTECTIVE EQUIPMENT
PROTECTIVE CLOTHING, SHOES, GLASSES, GOGGLES
RESPIRATOR, MASK
DIVING EQUIPMENT
SAFETY BELT, HARNESS
PARACHUTE
SECTION 7 - CAUSAL FACTORS
Review thoroughly. Answer each question by marking the appropriate block. NOTE! If any answer is yes, explain in section 5 above.
(1) DESIGN - Did inadequacies associated with the building or work site play a role? Would an improved design or layout of the equipment or facilities reduce the likelihood of similar accidents? Were the tools or other equipment designed and intended for the task at hand?
Contractor Significant Incident Report (CSIR) Instructions 5
(2) INSPECTION/MAINTENANCE - Did inadequately or improperly maintained equipment, tools, workplace, etc., create or worsen any hazards that contributed to the accident? Would better equipment, facility, work site or work activity inspections have helped avoid the accident?
(3) PERSONS PHYSICAL CONDITION - Do you feel that the accident would probably not have occurred if the employee was in “good” physical condition? If the person involved in the accident had been in better physical condition, would the accident have been less severe or avoided altogether? Was overexertion a factor?
(4) OPERATION PROCEDURES - Did lack of or inadequacy within established operating procedures contribute to the accident? Did any aspect of the procedures introduce any hazard to, or increase the risk associated with the work process?
Would establishment or improvement of operating procedures reduce the likelihood of similar accidents?
(5) JOB PRACTICES - Were any of the provision of the Safety and Health Requirements Manual (EM 385-1-1) violated? Was the task being accomplished in a manner which was not in compliance with an established job hazard analysis or activity hazard analysis? Did any established job practice (including EM 385-1-1) fail to adequately address the task or work process?
Would better job practices improve the safety of the task?
(6) HUMAN FACTORS - Was the person under undue stress (either internal or external to the job)? Did the task tend toward overloading the capabilities of the person: i.e., did the job require tracking and reacting to many external inputs such as displays, alarms, or signals? Did the arrangement of the workplace tend to interfere with efficient task performance? Did the task require reach strengths, endurance, agility, etc., at or beyond the capabilities of the employee? Was the work environment ill-adapted to the person? Did the person need more training, experience, or practice in doing the task? Was the person inadequately rested to perform safely?
(7) ENVIRONMENTAL FACTORS - Did any factors such as moisture, humidity, rain, snow, sleet, hail, ice, fog, cold, heat, sun temperature changes, wind, tides, floods, currents, terrain; dust, mud, glare, pressure changes, lighting, etc., play a part in the accident?
(8) CHEMICAL AND PHYSICAL AGENT FACTORS - Did exposure to chemical agents (either single shift exposure or long-term exposure such as dusts, fibers, (asbestos, etc.), silica, gases (carbon, monoxide, chlorine, etc.), mists, steam, vapors, fumes, smoke, other particulates, liquid or dry chemicals that are corrosive, toxic, explosive or flammable, by-products of combustion or physical agents such as noise, ionizing radiation, non-ionizing radiation (UV radiation created during welding, etc.) contribute to the accident/incident?
(9) OFFICE FACTORS - Did the fact that the accident occurred in an office setting or to an office worker have a bearing on its cause? For example, office workers tend to have less experience and training in performing tasks such as lifting office furniture. Did physical hazards within the office environment contribute to the hazard?
(10) SUPPORT FACTORS - Was the person using an improper tool for the job? Was inadequate time available or utilized to safely accomplish the task? Were less than adequate personnel resources (in terms of employee skills, number of workers, and adequate supervision) available to get the job done properly? Was funding available, utilized and adequate to provide proper tools, equipment, personnel, site preparation, etc.
(11) PERSONAL PROTECTIVE EQUIPMENT - Did the person fail to use appropriate personal protective equipment (gloves, eye protection, hard-toed shoes, respirator, etc) for the task or environment? Did protective equipment provided or worn fail to provide adequate protection from the hazard(s)? Did lack of or inadequate maintenance of protective gear contribute to the accident?
(12) DRUGS/ALCOHOL - Is there any reason to believe the person’s mental or physical capabilities, judgment, etc., were impaired or altered by the use of drugs or alcohol? Consider the effects of prescription medicine and over the counter medications as well as illicit drug use. Consider the effect of drug or alcohol induced “hangovers”.
(13) JOB/ACTIVITY HAZARD ANALYSIS - Was a written Job/Activity Analysis completed for the task being performed at the time of the accident? If one was made, did it address the hazard adequately or does it need to be updated? If none made, will one be made? These may also need to be addressed in the Corrective Actions Taken section. Mark the appropriate box. If one was made, attach a copy of the analysis to the report.
(14) MANAGEMENT - Did the lack of supervisor or management support play a part in the mishap? Mark the appropriate box.
SECTION - 8 OSHA INFORMATION - Complete this section if applicable
SECTION 9 - REPORT PREPARER
Providing a completed CSIR to the Contracting Officer is the PRIME CONTRACTOR’S RESPONSIBILITY. Enter the name, date of report, title, employer, phone number and signature of person completing the accident report and provide it to the Contracting Officer, or his representative, responsible for oversight of that contractor activity. NOTE! If prepared by other than the Prime Contractor, a person employed by the Prime Contractor must sign that they have reviewed and concur with the report and it’s findings (e.g. company owner, project supervisor/foreman, Safety Officer, etc.).
ATTACHMENT J-00000-06
"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-4389 Daniel W. Simms Division of | Revision No.: 24 Director Wage Determinations| Date Of Last Revision: 07/10/2023
Note: Contracts subject to the Service Contract Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
|If the contract is entered into on or |Executive Order 14026 generally applies to | |after January 30, 2022, or the |the contract. | |contract is renewed or extended (e.g., |The contractor must pay all covered workers | |an option is exercised) on or after |at least $16.20 per hour (or the applicable | |January 30, 2022: |wage rate listed on this wage determination,| | |if it is higher) for all hours spent | | |performing on the contract in 2023. | |If the contract was awarded on or |Executive Order 13658 generally applies to | |between January 1, 2015 and January 29,|the contract. | |2022, and the contract is not renewed |The contractor must pay all covered workers | |or extended on or after January 30, |at least $12.15 per hour (or the applicable | |2022: |wage rate listed on this wage determination,| | |if it is higher) for all hours spent | | |performing on the contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.
State: North Carolina
Area: North Carolina County of Onslow
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 15.46*** 01012 - Accounting Clerk II 17.36 01013 - Accounting Clerk III 19.41 01020 - Administrative Assistant 28.40 01035 - Court Reporter 19.40 01041 - Customer Service Representative I 13.85*** 01042 - Customer Service Representative II 15.11*** 01043 - Customer Service Representative III 16.97 01051 - Data Entry Operator I 15.27*** 01052 - Data Entry Operator II 16.66 01060 - Dispatcher, Motor Vehicle 17.19 01070 - Document Preparation Clerk 15.45***
01090 - Duplicating Machine Operator 15.45*** 01111 - General Clerk I 13.68*** 01112 - General Clerk II 14.93*** 01113 - General Clerk III 16.77 01120 - Housing Referral Assistant 21.63 01141 - Messenger Courier 12.59*** 01191 - Order Clerk I 14.16*** 01192 - Order Clerk II 15.45*** 01261 - Personnel Assistant (Employment) I 17.11 01262 - Personnel Assistant (Employment) II 19.14 01263 - Personnel Assistant (Employment) III 21.34 01270 - Production Control Clerk 20.71 01290 - Rental Clerk 14.90*** 01300 - Scheduler, Maintenance 17.35 01311 - Secretary I 17.35 01312 - Secretary II 19.40 01313 - Secretary III 21.63 01320 - Service Order Dispatcher 15.28*** 01410 - Supply Technician 28.40 01420 - Survey Worker 17.37 01460 - Switchboard Operator/Receptionist 13.53*** 01531 - Travel Clerk I 14.18*** 01532 - Travel Clerk II 15.16*** 01533 - Travel Clerk III 16.19*** 01611 - Word Processor I 15.45*** 01612 - Word Processor II 17.35 01613 - Word Processor III 19.40 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 22.38 05010 - Automotive Electrician 19.41 05040 - Automotive Glass Installer 18.16 05070 - Automotive Worker 18.16 05110 - Mobile Equipment Servicer 15.82*** 05130 - Motor Equipment Metal Mechanic 20.52 05160 - Motor Equipment Metal Worker 18.16 05190 - Motor Vehicle Mechanic 20.52 05220 - Motor Vehicle Mechanic Helper 14.83*** 05250 - Motor Vehicle Upholstery Worker 17.00 05280 - Motor Vehicle Wrecker 18.16 05310 - Painter, Automotive 19.41 05340 - Radiator Repair Specialist 18.16 05370 - Tire Repairer 15.04*** 05400 - Transmission Repair Specialist 20.52 07000 - Food Preparation And Service Occupations 07010 - Baker 13.62*** 07041 - Cook I 15.12*** 07042 - Cook II 17.41 07070 - Dishwasher 10.81*** 07130 - Food Service Worker 11.80*** 07210 - Meat Cutter 19.02 07260 - Waiter/Waitress 9.32*** 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 23.90 09040 - Furniture Handler 14.34*** 09080 - Furniture Refinisher 23.90 09090 - Furniture Refinisher Helper 17.62 09110 - Furniture Repairer, Minor 20.92 09130 - Upholsterer 23.90 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 12.09*** 11060 - Elevator Operator 11.69*** 11090 - Gardener 19.37 11122 - Housekeeping Aide 11.69***
11150 - Janitor 11.69*** 11210 - Laborer, Grounds Maintenance 14.31*** 11240 - Maid or Houseman 10.77*** 11260 - Pruner 12.72*** 11270 - Tractor Operator 17.58 11330 - Trail Maintenance Worker 14.31*** 11360 - Window Cleaner 13.15*** 12000 - Health Occupations 12010 - Ambulance Driver 20.98 12011 - Breath Alcohol Technician 20.98 12012 - Certified Occupational Therapist Assistant 28.79 12015 - Certified Physical Therapist Assistant 25.50 12020 - Dental Assistant 21.49 12025 - Dental Hygienist 35.45 12030 - EKG Technician 31.80 12035 - Electroneurodiagnostic Technologist 31.80 12040 - Emergency Medical Technician 20.98 12071 - Licensed Practical Nurse I 18.76 12072 - Licensed Practical Nurse II 20.98 12073 - Licensed Practical Nurse III 23.39 12100 - Medical Assistant 15.21*** 12130 - Medical Laboratory Technician 22.87 12160 - Medical Record Clerk 21.14 12190 - Medical Record Technician 23.66 12195 - Medical Transcriptionist 18.76 12210 - Nuclear Medicine Technologist 46.12 12221 - Nursing Assistant I 11.97*** 12222 - Nursing Assistant II 13.46*** 12223 - Nursing Assistant III 14.69*** 12224 - Nursing Assistant IV 16.49 12235 - Optical Dispenser 23.06 12236 - Optical Technician 18.76 12250 - Pharmacy Technician 17.03 12280 - Phlebotomist 17.53 12305 - Radiologic Technologist 29.40 12311 - Registered Nurse I 24.86 12312 - Registered Nurse II 30.40 12313 - Registered Nurse II, Specialist 30.40 12314 - Registered Nurse III 36.78 12315 - Registered Nurse III, Anesthetist 36.78 12316 - Registered Nurse IV 44.09 12317 - Scheduler (Drug and Alcohol Testing) 26.00 12320 - Substance Abuse Treatment Counselor 22.09 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 20.11 13012 - Exhibits Specialist II 24.90 13013 - Exhibits Specialist III 30.46 13041 - Illustrator I 20.11 13042 - Illustrator II 24.90 13043 - Illustrator III 30.46 13047 - Librarian 27.58 13050 - Library Aide/Clerk 16.01*** 13054 - Library Information Technology Systems 24.90 Administrator 13058 - Library Technician 20.11 13061 - Media Specialist I 17.97 13062 - Media Specialist II 20.11 13063 - Media Specialist III 22.42 13071 - Photographer I 17.96 13072 - Photographer II 20.11 13073 - Photographer III 24.90 13074 - Photographer IV 30.46 13075 - Photographer V 36.86
13090 - Technical Order Library Clerk 20.11 13110 - Video Teleconference Technician 17.99 14000 - Information Technology Occupations 14041 - Computer Operator I 17.07 14042 - Computer Operator II 19.09 14043 - Computer Operator III 21.28 14044 - Computer Operator IV 23.65 14045 - Computer Operator V 26.19 14071 - Computer Programmer I (see 1) 22.75 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 17.07 14160 - Personal Computer Support Technician 23.65 14170 - System Support Specialist 26.81 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 30.93 15020 - Aircrew Training Devices Instructor (Rated) 37.41 15030 - Air Crew Training Devices Instructor (Pilot) 44.85 15050 - Computer Based Training Specialist / Instructor 30.93 15060 - Educational Technologist 32.76 15070 - Flight Instructor (Pilot) 44.85 15080 - Graphic Artist 28.64 15085 - Maintenance Test Pilot, Fixed, Jet/Prop 44.85 15086 - Maintenance Test Pilot, Rotary Wing 44.85 15088 - Non-Maintenance Test/Co-Pilot 44.85 15090 - Technical Instructor 24.56 15095 - Technical Instructor/Course Developer 30.04 15110 - Test Proctor 19.82 15120 - Tutor 19.82 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 10.22*** 16030 - Counter Attendant 10.22*** 16040 - Dry Cleaner 12.73*** 16070 - Finisher, Flatwork, Machine 10.22*** 16090 - Presser, Hand 10.22*** 16110 - Presser, Machine, Drycleaning 10.22*** 16130 - Presser, Machine, Shirts 10.22*** 16160 - Presser, Machine, Wearing Apparel, Laundry 10.22*** 16190 - Sewing Machine Operator 13.58*** 16220 - Tailor 14.45*** 16250 - Washer, Machine 11.03*** 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 23.90 19040 - Tool And Die Maker 29.34 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 16.06*** 21030 - Material Coordinator 21.48 21040 - Material Expediter 21.48 21050 - Material Handling Laborer 14.68*** 21071 - Order Filler 13.58*** 21080 - Production Line Worker (Food Processing) 16.06*** 21110 - Shipping Packer 16.67 21130 - Shipping/Receiving Clerk 16.67 21140 - Store Worker I 13.96*** 21150 - Stock Clerk 19.85 21210 - Tools And Parts Attendant 16.06*** 21410 - Warehouse Specialist 16.06*** 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 32.02
23019 - Aircraft Logs and Records Technician 25.14 23021 - Aircraft Mechanic I 30.35 23022 - Aircraft Mechanic II 32.02 23023 - Aircraft Mechanic III 33.64 23040 - Aircraft Mechanic Helper 21.17 23050 - Aircraft, Painter 28.71 23060 - Aircraft Servicer 25.14 23070 - Aircraft Survival Flight Equipment Technician 28.71 23080 - Aircraft Worker 26.87 23091 - Aircrew Life Support Equipment (ALSE) Mechanic 26.87 I 23092 - Aircrew Life Support Equipment (ALSE) Mechanic 30.35
II
23110 - Appliance Mechanic 23.90 23120 - Bicycle Repairer 19.41 23125 - Cable Splicer 25.30 23130 - Carpenter, Maintenance 19.76 23140 - Carpet Layer 22.36 23160 - Electrician, Maintenance 24.13 23181 - Electronics Technician Maintenance I 27.85 23182 - Electronics Technician Maintenance II 29.77 23183 - Electronics Technician Maintenance III 31.47 23260 - Fabric Worker 20.92 23290 - Fire Alarm System Mechanic 25.26 23310 - Fire Extinguisher Repairer 19.41…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .