This document provides exhibit line item numbers (ELINs) for a solicitation seeking snow removal and related services. Key requirements include:
-
Loading, hauling, and disposing of snow from 4 inches to over 24 inches at the Naval Support Activity in Philadelphia and Philadelphia Naval Business Center. Pricing is provided for snowfall depths in 4-inch increments.
-
Snow removal from walkways, ramps, steps and building entrances at both locations, with completion timeframes ranging from 8 to 36 hours depending on snowfall depth.
-
Snow plowing of roads and parking areas at the Naval Support Activity, with pricing and completion timeframes again corresponding to snowfall depth in 4-inch increments up to over 24 inches.
-
Spreading of sand and salt, and provision of related equipment like plow-mounted dump trucks and Bobcats with operators.
-
Emergency service calls at both locations with a $2,500 per-call cost limit and 2-hour response time.
The solicitation involves an indefinite delivery/indefinite quantity contract over one base year and two option years, with ELINs provided for each contract period. Submission of firm fixed prices is requested.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINS-Base Non-Recurring
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
EXHIBIT A
| Line Item 0001 Indefinite Delivery / Indefinite Quantity Price -Base Period |
| PROVIDE PRICES FOR SNOW LOADING AND HAULING, SNOW AND ICE REMOVAL AND SNOW PLOWING - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION 1503060 C, SPEC ITEM 4 |
| ELINs A700 through A735 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Load/Haul snow off compound, up to 4" of precipitation | The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within eight (8) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| A701 | Load/Haul snow off compound, over 4" up to 8" of precipitation | The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| A702 | Load/Haul snow off compound, over 8" up to 12" of precipitation | The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within sixteen (16) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| A703 | Load/Haul snow off compound, over 12" up to 16" of precipitation | The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twenty (20) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| A704 | Load/Haul snow off compound, over 16" up to 20" of precipitation | The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twenty-four (24) working hours the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| A705 | Load/Haul snow off compound, over 20" up to 24" of precipitation | NSA-P The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twenty-eight (28) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| A706 | Load/Haul snow off compound, over 24" of precipitation | The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within thirty-six (36) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| A707 | Provide plow-mounted dump truck with operator | Contractor shall provide a plow-mounted dump truck and licensed operator to plow snow as directed by government personnel. Payment will be based on actual hours on-site. Unit price shall include all travel time and fuel. Submit a report with invoice indicating start and completion date and time. | 100 | HR | $0.00 | 92NT | |
| A708 | Provide Bobcat with operator | Contractor shall provide a Bobcat and licensed operator to plow snow as directed by government personnel. Payment will be based on actual hours on-site. Unit price shall include all travel time and fuel. Submit a report with invoice indicating start and completion date and time. | 100 | HR | $0.00 | 92NT | |
| A709 | NSA-P Snow Removal up to 4" of precipitation | The Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within eight (8) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | ||
| A710 | NSA-P Snow Removal over 4" up to 8" of precipitation | The Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1.00 | EVENT | $0.00 | ||
| A711 | NSA-P Snow Removal over 8" up to 12" of precipitation | The Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within sixteen (16) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1.00 | EVENT | $0.00 | ||
| A712 | NSA-P Snow Removal over 12" up to 16" of precipitation | The Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twenty (20) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1.00 | EVENT | $0.00 | ||
| A713 | NSA-P Snow Removal over 16" up to 20" of precipitation | The Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twenty-four (24) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1.00 | EVENT | $0.00 | ||
| A714 | NSA-P Snow Removal over 20" up to 24" of precipitation | The Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twenty-eight (28) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1.00 | EVENT | $0.00 | ||
| A715 | NSA-P Snow Removal over 24" of precipitation | The Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within thirty-six (36) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1.00 | EVENT | $0.00 | ||
| A716 | NSA-P Ice Removal from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic. | The Contractor shall provide ice removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of ice from the walkways, ramps, steps,and building entrance, for safe passage, accessible for operations, fire protection and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and days when the compound is closed due to inclement weather. | 1.00 | EVENT | $0.00 | ||
| A717 | NSA-P Service Calls | The Contractor shall perform Service Call work 24 hours a day, seven (7) days a week within the Naval Support Activity-Philadelphia. Each Service Call is limited to a combined labor and material cost.not to exceed $2,500.00. The Contractor shall notify the KO upon identification that the Service Call will exceed the $2,500.00 threshold. Contractor shall respond to Service Call request within two (2) hours of receipt of call during and outside of regular working hours. the Contractor shall remain at the work site until the service has been arrested.Within three (3) working days of completion, Contractor shall submit to KO a report that include the following information: Call number,date call received,date call completed,description of problem, description of work performed, labor hours expanded and material costs incurred. | 30.00 | EA. | $0.00 | ||
| SUBTOTAL INDEFINITE QUANTITY PRICE BASE YEAR FOR NSA-P Loading, Hauling & Snow Removal | $0.00 | ||||||
| A718 | PNBC Snow Removal up to 4" of precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic. | The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | ||
| A719 | PNBC Snow Removal over 4" up to 8" of precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic. | The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | ||
| A720 | PNBC Snow Removal over 8" up to 12" of precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic. | The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | ||
| A721 | PNBC Snow Removal over 12" up to 16" of precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic. | The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | ||
| A722 | PNBC Snow Removal over 16" up to 20" of precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic. | The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | ||
| A723 | PNBC Snow Removal over 20" up to 24" of precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic. | The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | ||
| A724 | PNBC Snow Removal over 24" precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic. | The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | ||
| A725 | PNBC Ice Removal of Ice from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic. | The Contractor shall provide ice removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of ice from the walkways, ramps, steps,and building entrance, for safe passage, accessible for operations, fire protection and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and days when the compound is closed due to inclement weather. | 1 | EVENT | $0.00 | ||
| A726 | PNBC Service Calls | The Contractor shall perform Service Call work 24 hours a day, seven (7) days a week within the Philadelphia Naval Business Center. Each Service Call is limited to a combined labor and material cost.not to exceed $2,500.00. The Contractor shall notify the KO upon identification that the Service Call will exceed the $2,500.00 threshold. Contractor shall respond to Service Call request within two (2) hours of receipt of call during and outside of regular working hours. the Contractor shall remain at the work site until the service has been arrested.Within three (3) working days of completion, Contractor shall submit to KO a report that include the following information: Call number,date call received,date call completed,description of problem, description of work performed, labor hours expanded and material costs incurred. | 7 | EA. | $0.00 |
| SUBTOTAL INDEFINITE QUANTITY PRICE BASE YEAR for Philadelphia Naval Business Center Snow Removal | $0.00 | ||||
| A727 | Snow and Ice Removal up to 4" of precipitation Snow Plowing | The Contractor shal provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within eight (8) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-04 | 1 | EVENT | $0.00 |
| A728 | Snow and Ice Removal over 4" up to 8" of precipitation Snow Plowing | The Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-01 | 1 | EVENT | $0.00 |
| A729 | Snow and Ice Removal over 8" up to 12" of precipitation Snow Plowing | The Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within sixteen (16) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-04 | 1 | EVENT | $0.00 |
| A730 | Snow and Ice Removal over 12" up to 16" of precipitation Snow Plowing | The Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within twenty (20) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-04 | 1 | EVENT | $0.00 |
| A731 | Snow and Ice Removal over 16" up to 20" of precipitation Snow Plowing | The Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within twenty four (24) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-04 | 1 | EVENT | $0.00 |
| A732 | Snow and Ice Removal over 20" up to 24" of precipitation Snow Plowing | The Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within twenty eight (28) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-04 | 1 | EVENT | $0.00 |
| A733 | Snow and Ice Removal over 24" of precipitation | The Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within twenty eight (28) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-04 | 0 | EVENT | $0.00 |
| A733 | Snow and Ice Removal over 24" of precipitation Snow Plowing | The Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within thirty six (36) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-04 | 1 | EVENT | $0.00 |
| A734 | Spread sand & salt mix | The Contractor shal provide snowand ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for theThe Contractor shall provide sand, salt, or other deicing material for streets, roads, driveways, and parking lots identified on the Site Maps provided in J-1503060-04. The Contractor shall be responsible for providing, storing, and spreading deicing materials. | 1 | EVENT | $0.00 |
| A735 | Spread sand & salt mix call in | The Contractor shal provide snowand ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for theThe Contractor shall provide sand, salt, or other deicing material for streets, roads, driveways, and parking lots identified on the Site Maps provided in J-1503060-04. The Contractor shall be responsible for providing, storing, and spreading deicing materials.The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. | 1 | EVENT | $0.00 |
| SUB TOTAL INDEFINITE QUANTITY PRICE BASE YEAR for Naval Support Activity-Philadelphia Snow Plowing and Salting | $ - 0 | ||||
| TOTAL INDEFINITE QUANTITY PRICE BASE YEAR for Naval Support Activity-Philadelphia and Philadelphia Naval Business Center | $0.00 |
ELINS-1st Opt Non-Recurring
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
EXHIBIT B
| Line Item 0002 Indefinite Delivery / Indefinite Quantity Price -1st Option Year Period |
| PROVIDE PRICES FOR SNOW LOADING AND HAULING, SNOW AND ICE REMOVAL AND SNOW PLOWING - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION 1503060 C, SPEC ITEM 4 |
| ELINs B700 through B735 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| B700 | Load/Haul snow off compound, up to 4" of precipitation | The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within eight (8) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| B701 | Load/Haul snow off compound, over 4" up to 8" of precipitation | The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| B702 | Load/Haul snow off compound, over 8" up to 12" of precipitation | The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within sixteen (16) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| B703 | Load/Haul snow off compound, over 12" up to 16" of precipitation | The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twenty (20) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| B704 | Load/Haul snow off compound, over 16" up to 20" of precipitation | The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twenty-four (24) working hours the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| B705 | Load/Haul snow off compound, over 20" up to 24" of precipitation | NSA-P The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twenty-eight (28) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| B706 | Load/Haul snow off compound, over 24" of precipitation | The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within thirty-six (36) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | 92NT | |
| B707 | Provide plow-mounted dump truck with operator | Contractor shall provide a plow-mounted dump truck and licensed operator to plow snow as directed by government personnel. Payment will be based on actual hours on-site. Unit price shall include all travel time and fuel. Submit a report with invoice indicating start and completion date and time. | 100 | HR | $0.00 | 92NT | |
| B708 | Provide Bobcat with operator | Contractor shall provide a Bobcat and licensed operator to plow snow as directed by government personnel. Payment will be based on actual hours on-site. Unit price shall include all travel time and fuel. Submit a report with invoice indicating start and completion date and time. | 100 | HR | $0.00 | 92NT | |
| B709 | NSA-P Snow Removal up to 4" of precipitation | The Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within eight (8) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1 | EVENT | $0.00 | ||
| B710 | NSA-P Snow Removal over 4" up to 8" of precipitation | The Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1.00 | EVENT | $0.00 | ||
| B711 | NSA-P Snow Removal over 8" up to 12" of precipitation | The Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within sixteen (16) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. | 1.00 | EVENT | $0.00 |