J-0200000-07 ELINs 23B2506.xlsx

XLSX spreadsheet 73 KB Posted

Attached to
Snow Removal for Public Works PA
Solicitation number
N4008523B2506
Issued by

About this file

This document provides exhibit line item numbers (ELINs) for a solicitation seeking snow removal and related services. Key requirements include:

  • Loading, hauling, and disposing of snow from 4 inches to over 24 inches at the Naval Support Activity in Philadelphia and Philadelphia Naval Business Center. Pricing is provided for snowfall depths in 4-inch increments.

  • Snow removal from walkways, ramps, steps and building entrances at both locations, with completion timeframes ranging from 8 to 36 hours depending on snowfall depth.

  • Snow plowing of roads and parking areas at the Naval Support Activity, with pricing and completion timeframes again corresponding to snowfall depth in 4-inch increments up to over 24 inches.

  • Spreading of sand and salt, and provision of related equipment like plow-mounted dump trucks and Bobcats with operators.

  • Emergency service calls at both locations with a $2,500 per-call cost limit and 2-hour response time.

The solicitation involves an indefinite delivery/indefinite quantity contract over one base year and two option years, with ELINs provided for each contract period. Submission of firm fixed prices is requested.

View the file

Other files

File Type Posted
BID ABSTRACT N4008523B2506.pdf PDF
N4008523B2506 Amendment 0004.pdf PDF
Amendment 0003 - Section J.pdf PDF
N4008523B2506 Amendment 0003.pdf PDF
N4008523B2506 Amendment 0002.pdf PDF
AMENDMENT 0001.pdf PDF
NEW 2022-2024 5512 (002).pdf PDF
Section C - N40085-23-B-2506.pdf PDF
Section J.pdf PDF
J-0200000-08 - Self Performance Certification.pdf PDF
Wage Determination.pdf PDF
J-1503060-05_PNBC_PriorityList.pdf PDF
N4008523B2506 IFB.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELINS-Base Non-Recurring

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS

EXHIBIT A

Line Item 0001 Indefinite Delivery / Indefinite Quantity Price -Base Period
PROVIDE PRICES FOR SNOW LOADING AND HAULING, SNOW AND ICE REMOVAL AND SNOW PLOWING - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION 1503060 C, SPEC ITEM 4
ELINs A700 through A735
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
A700Load/Haul snow off compound, up to 4" of precipitationThe Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within eight (8) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
A701Load/Haul snow off compound, over 4" up to 8" of precipitationThe Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
A702Load/Haul snow off compound, over 8" up to 12" of precipitationThe Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within sixteen (16) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
A703Load/Haul snow off compound, over 12" up to 16" of precipitationThe Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twenty (20) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
A704Load/Haul snow off compound, over 16" up to 20" of precipitationThe Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twenty-four (24) working hours the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
A705Load/Haul snow off compound, over 20" up to 24" of precipitationNSA-P The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twenty-eight (28) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
A706Load/Haul snow off compound, over 24" of precipitationThe Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within thirty-six (36) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
A707Provide plow-mounted dump truck with operatorContractor shall provide a plow-mounted dump truck and licensed operator to plow snow as directed by government personnel. Payment will be based on actual hours on-site. Unit price shall include all travel time and fuel. Submit a report with invoice indicating start and completion date and time.100HR$0.0092NT
A708Provide Bobcat with operatorContractor shall provide a Bobcat and licensed operator to plow snow as directed by government personnel. Payment will be based on actual hours on-site. Unit price shall include all travel time and fuel. Submit a report with invoice indicating start and completion date and time.100HR$0.0092NT
A709NSA-P Snow Removal up to 4" of precipitationThe Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within eight (8) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.00
A710NSA-P Snow Removal over 4" up to 8" of precipitationThe Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1.00EVENT$0.00
A711NSA-P Snow Removal over 8" up to 12" of precipitationThe Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within sixteen (16) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1.00EVENT$0.00
A712NSA-P Snow Removal over 12" up to 16" of precipitationThe Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twenty (20) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1.00EVENT$0.00
A713NSA-P Snow Removal over 16" up to 20" of precipitationThe Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twenty-four (24) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1.00EVENT$0.00
A714NSA-P Snow Removal over 20" up to 24" of precipitationThe Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twenty-eight (28) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1.00EVENT$0.00
A715NSA-P Snow Removal over 24" of precipitationThe Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within thirty-six (36) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1.00EVENT$0.00
A716NSA-P Ice Removal from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic.The Contractor shall provide ice removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of ice from the walkways, ramps, steps,and building entrance, for safe passage, accessible for operations, fire protection and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and days when the compound is closed due to inclement weather.1.00EVENT$0.00
A717NSA-P Service CallsThe Contractor shall perform Service Call work 24 hours a day, seven (7) days a week within the Naval Support Activity-Philadelphia. Each Service Call is limited to a combined labor and material cost.not to exceed $2,500.00. The Contractor shall notify the KO upon identification that the Service Call will exceed the $2,500.00 threshold. Contractor shall respond to Service Call request within two (2) hours of receipt of call during and outside of regular working hours. the Contractor shall remain at the work site until the service has been arrested.Within three (3) working days of completion, Contractor shall submit to KO a report that include the following information: Call number,date call received,date call completed,description of problem, description of work performed, labor hours expanded and material costs incurred.30.00EA.$0.00
SUBTOTAL INDEFINITE QUANTITY PRICE BASE YEAR FOR NSA-P Loading, Hauling & Snow Removal$0.00
A718PNBC Snow Removal up to 4" of precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic.The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.00
A719PNBC Snow Removal over 4" up to 8" of precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic.The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.00
A720PNBC Snow Removal over 8" up to 12" of precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic.The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.00
A721PNBC Snow Removal over 12" up to 16" of precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic.The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.00
A722PNBC Snow Removal over 16" up to 20" of precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic.The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.00
A723PNBC Snow Removal over 20" up to 24" of precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic.The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.00
A724PNBC Snow Removal over 24" precipitation removal of snow from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic.The Contractor shall provide snow removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.00
A725PNBC Ice Removal of Ice from the walkways, ramps, steps and building entrances, for safe passage for pedestrian traffic.The Contractor shall provide ice removal at the Philadelphia Naval Business Center. All labor, equipment, material, fuel, supplies and supervision for the removal of ice from the walkways, ramps, steps,and building entrance, for safe passage, accessible for operations, fire protection and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and days when the compound is closed due to inclement weather.1EVENT$0.00
A726PNBC Service CallsThe Contractor shall perform Service Call work 24 hours a day, seven (7) days a week within the Philadelphia Naval Business Center. Each Service Call is limited to a combined labor and material cost.not to exceed $2,500.00. The Contractor shall notify the KO upon identification that the Service Call will exceed the $2,500.00 threshold. Contractor shall respond to Service Call request within two (2) hours of receipt of call during and outside of regular working hours. the Contractor shall remain at the work site until the service has been arrested.Within three (3) working days of completion, Contractor shall submit to KO a report that include the following information: Call number,date call received,date call completed,description of problem, description of work performed, labor hours expanded and material costs incurred.7EA.$0.00
SUBTOTAL INDEFINITE QUANTITY PRICE BASE YEAR for Philadelphia Naval Business Center Snow Removal$0.00
A727Snow and Ice Removal up to 4" of precipitation Snow PlowingThe Contractor shal provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within eight (8) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-041EVENT$0.00
A728Snow and Ice Removal over 4" up to 8" of precipitation Snow PlowingThe Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-011EVENT$0.00
A729Snow and Ice Removal over 8" up to 12" of precipitation Snow PlowingThe Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within sixteen (16) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-041EVENT$0.00
A730Snow and Ice Removal over 12" up to 16" of precipitation Snow PlowingThe Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within twenty (20) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-041EVENT$0.00
A731Snow and Ice Removal over 16" up to 20" of precipitation Snow PlowingThe Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within twenty four (24) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-041EVENT$0.00
A732Snow and Ice Removal over 20" up to 24" of precipitation Snow PlowingThe Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within twenty eight (28) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-041EVENT$0.00
A733Snow and Ice Removal over 24" of precipitationThe Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within twenty eight (28) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-040EVENT$0.00
A733Snow and Ice Removal over 24" of precipitation Snow PlowingThe Contractor shall provide snow and ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for the snow plowing of all of the entire complexes roads, and parking areas, at the Naval Support Activity-Philadelphia. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.The Contractor shall plow snow into piles prior to removal, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government PAR during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be complete within thirty six (36) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation. See Attachment J-1503060-041EVENT$0.00
A734Spread sand & salt mixThe Contractor shal provide snowand ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for theThe Contractor shall provide sand, salt, or other deicing material for streets, roads, driveways, and parking lots identified on the Site Maps provided in J-1503060-04. The Contractor shall be responsible for providing, storing, and spreading deicing materials.1EVENT$0.00
A735Spread sand & salt mix call inThe Contractor shal provide snowand ice removal services to ensure paved surfaces are safe and passable.at the Naval Support Activity-Philadelphia. The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision for theThe Contractor shall provide sand, salt, or other deicing material for streets, roads, driveways, and parking lots identified on the Site Maps provided in J-1503060-04. The Contractor shall be responsible for providing, storing, and spreading deicing materials.The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work.1EVENT$0.00
SUB TOTAL INDEFINITE QUANTITY PRICE BASE YEAR for Naval Support Activity-Philadelphia Snow Plowing and Salting$ - 0
TOTAL INDEFINITE QUANTITY PRICE BASE YEAR for Naval Support Activity-Philadelphia and Philadelphia Naval Business Center$0.00

ELINS-1st Opt Non-Recurring

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS

EXHIBIT B

Line Item 0002 Indefinite Delivery / Indefinite Quantity Price -1st Option Year Period
PROVIDE PRICES FOR SNOW LOADING AND HAULING, SNOW AND ICE REMOVAL AND SNOW PLOWING - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION 1503060 C, SPEC ITEM 4
ELINs B700 through B735
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
B700Load/Haul snow off compound, up to 4" of precipitationThe Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within eight (8) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
B701Load/Haul snow off compound, over 4" up to 8" of precipitationThe Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
B702Load/Haul snow off compound, over 8" up to 12" of precipitationThe Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within sixteen (16) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
B703Load/Haul snow off compound, over 12" up to 16" of precipitationThe Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twenty (20) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
B704Load/Haul snow off compound, over 16" up to 20" of precipitationThe Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twenty-four (24) working hours the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
B705Load/Haul snow off compound, over 20" up to 24" of precipitationNSA-P The Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within twenty-eight (28) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
B706Load/Haul snow off compound, over 24" of precipitationThe Contractor shall provide all labor, equipment, material, fuel, supplies and supervision to load and haul snow off the NSA-P compound and dispose of snow in accordance with all federal, state and local regulations. The Contractor shall respond to the governments request for services within four (4) hours and have vehicles and personnel on site, ready to perform work. Government will have plowed snow into piles prior to the Contractor arriving on site, with piles located in the center of streets: primarily Foster Avenue, Gates Avenue, Young Street and Richardson Street. Other areas as agreed upon by Contractor and government during operations. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Bid price shall include all fees paid by the Contractor for use of private property to dump the snow hauled from the compound. Work shall be complete within thirty-six (36) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.0092NT
B707Provide plow-mounted dump truck with operatorContractor shall provide a plow-mounted dump truck and licensed operator to plow snow as directed by government personnel. Payment will be based on actual hours on-site. Unit price shall include all travel time and fuel. Submit a report with invoice indicating start and completion date and time.100HR$0.0092NT
B708Provide Bobcat with operatorContractor shall provide a Bobcat and licensed operator to plow snow as directed by government personnel. Payment will be based on actual hours on-site. Unit price shall include all travel time and fuel. Submit a report with invoice indicating start and completion date and time.100HR$0.0092NT
B709NSA-P Snow Removal up to 4" of precipitationThe Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within eight (8) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1EVENT$0.00
B710NSA-P Snow Removal over 4" up to 8" of precipitationThe Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within twelve (12) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1.00EVENT$0.00
B711NSA-P Snow Removal over 8" up to 12" of precipitationThe Contractor shall provide snow removal at the Naval Support Activity-Philadelphia. All labor, equipment, material, fuel, supplies and supervision for the removal of snow from the walkways, ramps, steps and building entrances, for safe passage, accessible for operations, fire protection, and pedestrian traffic. The Contractor shall respond to the government request for services within four (4) hours and have personnel on site, ready to perform work. Unless otherwise directed, work shall be performed outside regular working hours, on holidays, weekends and on days when the compound is closed due to inclement weather. Work shall be completed within sixteen (16) working hours from the time the contractor arrives on site. Depth of snow is based on PAR's measurement of the total snow accumulation.1.00EVENT$0.00