1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.

NO.

PROJECT NO. (If applicable)

0001 08/04/2022

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFACSYSCOM MID-ATLANTIC

PWD NORFOLK

FACILITIES ENGINEERING & ACQ DIV

9324 VIRGINIA AVENUE

NORFOLK, VA 23511

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N40085-22-R-2771

9B. DATED (SEE ITEM 11)

07/15/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N4008522R2771, NSN, BLDG. V-88 CONSTRUCT ROC – DEMOLITION AND ABATEMENT, NORFOLK, VIRGINIA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

SECTION SF30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

AMENDMENT 0001

The purpose of this amendment is to provide:

1. Changes to Drawings

2. Site Visit Log

3. Responses to Pre-Proposal Inquiries (PPIs)

All PPIs are hereby answered. All other terms and conditions remain unchanged.

1. Provide Changes to Drawings

See Attachment L - V-88_DWGS_AD101-REV 1

Changes include the following:

The following drawings are revised as of August 03, 2022 and accompany this Design Revision:

NAVFAC Dwg. No. Title

Architectural

12,868,894 (AD101) Overall Floor Plans - Demolition

2. Provide Site Visit Log

See Attachment M – Site Visit Log

3. Provide Responses to PPIs #1-7

PPI

Date

Submitted

LEA

VE

BLA

NK

Reference

Question

Page Section Paragraph Response

1 07/21/22

Drawing

PD 101 and

Drawing

AD 101

Drawing PD

101 and

Drawing AD

Drawing PD

101 and

Drawing AD

Drawing PD 101 indicates the removal of piping from the first floor presumably ceiling area.

Drawing AD 101 says the first floor area is not in contract.

Assuming that the piping is in the first floor ceiling please provide us a detailed reflected ceiling plan and first floor layout plan if we are to remove and replace existing finishes in this area of piping demolition.

Please see Attachment L - V-

88_DWGS_AD101-REV 1, per

Amendment 001.

2 07/29/22

Is there a technical proposal for this solicitation?

No. Please refer to the General

Requirements, pages 4-5.

3 07/29/22

Is there a bid bond for this solicitation?

Yes, a bid bond is required.

Please refer to the General

Requirements, pages 4-5

4 08/01/22 n/a n/a

Can we bring equipment up in the freight elevator for demo use?

(electric skid steer and mini excavator)

Equipment can be brought up in the elevator as long as the weight limit of the elvator is not exceeded. But more than likely, one would be limited by the second floor slab's live load capacity which is 150 pounds/SF.

5 08/01/22 n/a n/a

Can a trash shoot be installed into a dumpster below?

Yes. Location of trash shoot and dumpster would be pending approval of construction site plan by the Government per specifications. Opening for trash shoot during and after demolition work is complete would need to be watertight.

6 08/01/22 n/a n/a

There is a finished occupied area aadjacent to the space. Can this door be shutdown to foot traffic?

No. The door needs to remain operational as an emergency means of egress only. Other than an emergency event, there should be no other foot traffic.

7 08/01/22 n/a n/a Does this project require citizenship only?

Per the Specifications, this project does not require citizenship.

(End of Summary of Changes)