Building V‐88 ROC – Demo and Abatement Package 1732920
BID SCHEDULE ‐ Page 1
PRICE PROPOSAL FORM
CLIN QUANTITY UNIT UNIT PRICE TOTAL PRICE
0001AA ___________
0001AB 500 EA _________ ___________
0001AC 1,000 LF _________ ___________
0001AD 1,000 LF _________ ___________
0001AE 5,000 SF _________ ___________
0001AF 5,000 SF _________ ___________
0001AG 500 SF _________ ___________
TOTAL FOR CLIN 0001 (CLIN 0001AA THRU 0001AG) ___________
BID SCHEDULE ‐ Page 2
BID SCHEDULE
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 ‐ BASE PRICE. Price includes the following:
CLIN 0001AA. Price for the entire work in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0001AB thru 0001AG.
CLIN DESCRIPTION TOTAL PRICE
FOR
CLIN 0001AA
0001AA Price for the entire work in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0001AB thru 0001AG.
The quantities in CLIN 0001AB thru CLIN 0001AG are additional quantities beyond those indicated in the contract drawings. These items will only be performed at the direction of the Contracting
Officer.
CLIN 0001AB. Price for the removal and disposal of unidentified asbestos containing pipe elbow insulation in accordance with the following schedule:
CLIN ITEM UNIT UNIT PRICE NO.
UNITS
TOTAL PRICE FOR
CLIN 0001AB (UNIT
PRICE X NO. UNITS)
0001AB Removal and Disposal of unidentified asbestos containing pipe elbow insulation.
Each $_______ 500 $_______
BID SCHEDULE ‐ Page 3
CLIN 0001AC. Price for the removal and disposal of unidentified asbestos containing pipe insulation up to 4" diameter in accordance with the following schedule:
TOTAL PRICE FOR
CLIN 0001AC (UNIT
PRICE X NO. UNITS)
0001AC Removal and Disposal of unidentified asbestos containing pipe insulation up to 4" diameter.
Linear Feet
$_______ 1,000 $_______
CLIN 0001AD. Price for the removal and disposal of unidentified asbestos containing pipe insulation
4" to 8" diameter in accordance with the following schedule:
TOTAL PRICE FOR
CLIN 0001AD (UNIT
PRICE X NO. UNITS)
0001AD Removal and Disposal of unidentified asbestos containing pipe insulation 4" to 8" diameter.
Linear
$_______ 1,000 $_______
CLIN 0001AE. Price for the removal and disposal of unidentified asbestos containing mastic in accordance with the following schedule:
TOTAL PRICE FOR
CLIN 0001AE (UNIT
PRICE X NO. UNITS)
0001AE Removal and Disposal of unidentified asbestos containing mastic.
Square
$_______ 5,000 $_______
BID SCHEDULE ‐ Page 4
CLIN 0001AF. Price for the removal and disposal of unidentified asbestos containing floor tile with mastic in accordance with the following schedule:
TOTAL PRICE FOR
CLIN 0001AF (UNIT
PRICE X NO. UNITS)
0001AF Removal and Disposal of unidentified asbestos containing floor tile with mastic.
Square
$_______ 5,000 $_______
CLIN 0001AG. Price for the removal and disposal of unidentified asbestos containing duct insulation in accordance with the following schedule:
TOTAL PRICE FOR
CLIN 0001AG (UNIT
PRICE X NO. UNITS)
0001AG Removal and Disposal of unidentified asbestos containing duct insulation.
Square
$_______ 500 $_______
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items 0001AA thru 0001AG. For CLINs
0001AB thru 0001AG, enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
‐‐End of Document‐‐