N4008522B2510 Amendment 0005.pdf

PDF 135 KB Posted

Attached to
Infrastructure Reset Demo Package F Federal contract opportunity
Solicitation number
N4008522B2510
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This amendment provides clarification to solicitation N4008522B2510 for the Infrastructure Reset Demo Package F project. The solicitation is for demolition of various buildings according to the plans and specifications issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy. The amendment includes answers to seven questions from potential offerors clarifying details such as whether contactors need to certify demolition plans or can work on multiple buildings concurrently, as well as procedures for accessing restricted areas, environmental protection plans, bid bond requirements, and landfill use. No other changes are made to the terms and conditions of the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Infrastructure Reset Demo Package F, newest first.
File Type Posted
N4008522B2510 Amendment 0004.pdf PDF
N4008522B2510 Amendment 0003.pdf PDF
N4008522B2510 Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
21-0025 Abestos Survey - 2-2.pdf PDF
21-0025 Asbestos Survey - 1-2.pdf PDF
21-0025 Lead Survey - 1-2.pdf PDF
N4008521B0025 Drawings.pdf PDF
N4008521B0025 Specs.pdf PDF
21-0025 Lead Survey - 2-2.pdf PDF
N4008522B2510 IR Demo Package F Solicitation.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N4008522B2510, Infrastructure Reset Demo Buildings - Package F

Amendment 0004

This amendment should be acknow ledged w hen your bid is submitted. Failure to acknow ledge may constitute grounds for rejection of a bid.

See Continuation Page(s)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Jul-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008522B2510

X 9B. DATED (SEE ITEM 11)

27-Jun-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Jul-2022

CODE

NAVFACSYSCOM MID-ATLANTIC

ROICC CAMP LEJEUNE

1005 MICHAEL ROAD

CAMP LEJEUNE NC 28547-2521

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008522B2510

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

The purpose of this amendment is to provide the following information:

1. Questions and Answers

Question 1: Should contactor used the drawings or asbesots report for Buildings M203 and 41?

Answer 1: The numbers on the plans are correct. Items listed on Government report are not drawn into plan, see government report for locations.

Question 2: Will contractor need an engineer to certify the demo plan?

Answer 2: No, contractor will not need an engineer to certify demo plan.

Question 3: Will contractor be able to group buildings or just do one at a time?

Answer 3: Contractor can group buildings.

Question 4: Will a contractor have to completely start to finsh each building before moving onto others or be starting preep work at next building?

Answer 4: Contractor can group buildings, work can coincide.

Question 5: Is ther any special class or certification needed to work on building at the airfield behind the fence. Is that considered restricted area?

Answer 5: Airfield flight line access will have to be obtained throught MCAS OPS/PMO prior to any work commecning inside of the flight line.

Question 6: Drawlings show the environmental protection needed for the project, this has been completed by engineer and approved for the drawlings. Does the contracotr also have to provide an environmental protection plan? Does the government have the permit?

Answer 6: An environmental protection plan is required per the speifications. All project environmental permits (Erosion Control) have been secured for the project.

Question 7: Does Camp Lejeune require a bid bond?

Answer 7: Refer to BID Delivery Instructions on page 38 of solicitation.

Question 8: Landfill needs a letter to use the landfill and drop off scrap steel. Is there a fee for contractor to use landfill? Does the government pay contractor for scap steel?

N4008522B2510

Answer 8: A landfill letter is not required for recycables. The government will not pay for materials dropped on base. If materials are being landfilled a landfill use letter will be required before drop off and procedures will be explained.

2. All other terms and conditions remain unchanged.

(End of Summary of Changes)