N4008521R2504-0002.pdf
PDF 28 KB Posted
- Solicitation number
- N4008521R2504
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008521R2504-0001.pdf | ||
| N4008521R2504.pdf | ||
| CORPORATE EXPERIENCE PROJECT DATA SHEET.docx | DOCX document | |
| J-0200000-11 1501000 ELINs Facility Management.xlsx | XLSX spreadsheet | |
| NAVFAC Form PPQ-0.docx | DOCX document | |
| J-0200000-12 1502000 ELINS Fac Investment.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment 0002 is to answ er RFI's, see continuation page. Also, NAVFAC changed our name, see the new Issue By address.
The due date and time remains the same, all other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Dec-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521R2504
X 9B. DATED (SEE ITEM 11)
19-Nov-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Dec-2020
CODE
NAVFACSYSCOM MID-ATLANTIC
FEAD CHERRY POINT
BLDG 163 CURTIS ROAD
PSC BOX 8006
CHERRY POINT NC 28533-0006
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008521R2504
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
Amendment N4008521R2504-0002 RFI Questions and Answers
Question 1. 15020000 Facility Investment – Systems periodic Inspection and service – Performance Objective refers to following the UFC 3-601-02 up to 5-year service. Can you please answer the following to help determine the frequency needed?
a. Can you please verify that all Fire Alarm System are monitored?
If not, please provide the number of FA Panels that are not.
Answer 1a: Yes, all Fire Alarm Systems are monitored.
b. Can you please verify that all sprinkler control valves are sealed, locked or electrically supervised? If not, please provide a list of the valves that are not.
Answer 1b: Fire Sprinkler Control Valves have a seal installed and replaced accordingly. Fire Sprinkler Control Valves are not locked. Some Fire Sprinkler Valves are electrically supervised via a “Tamper Switch”, though not all are, however water flow is electrically supervised via either a Flow or Pressure Switch.
Question 2. Attachment J-15020000-03 – Fire Alarm Systems – The Fire Alarm information only includes the Fire Alarm panel to be inspected. Can you please provide the devices that are connected to each system? Examples below a. Pull Stations
b. Smoke Detectors
c. Duct Detectors
d. Heat Detectors
e. Waterflows
f. Tampers
g. Elevator Recall
h. Horn Strobes Answer 2. This information is not available Information may be able to be obtained on an as needed basis, throughout repairs if they are needed.
3. Attachment J-15020000-03 – CO2 Systems and FM200 – The suppression information only includes the type of system. Can you please provide the following information for each of the systems? Examples Below
a. Type of Releasing Panel
b. Detection for activation – smoke, heat and number of each
c. Number of Tanks and Size/wight of each Answer 3: co2 Systems:
Bldg. 83: Kiddie System; One (1) Tank – 25 lbs.; One (1) Manual Release Pull Station Bldg. 133: Kiddie System; One (1) Tank – 100 lbs.; One (1) Manual Release Pull Station Bldg. 137: Kiddie System; One (1) Tank – 50 lbs.; One (1) Manual Release Pull Station
Bldg. 488: System no longer active – will request to be removed at a later date upon execution of Contract, no further information at this time
4. Attachment J-15020000-03 – Dry Chemical Systems – Clean agent systems are listed and not dry Chemical. Can you please provide the following information for each of the systems? Examples Below
a. Type of Releasing Panel
b. Detection for activation – smoke, heat and number of each
c. Number of Tanks and Size/weight of each Answer 4: Dry Chemical System (Novec 1230 Clean Agent):
Bldg. 488: System no longer in place
Bldg. 4173: Kiddie System; One (1) Tank – 600 lbs., 300-600 lbs. fill; Two (2) Manual Release “Pull Stations” and Three (3) Smoke Detectors
5. Attachment J-15020000-03 – Fire Pumps – Can you please provide the following information for each of these fire pumps? Examples Below
a. Size of fire pump - GPM Answer 5: Fire Pumps:
Bldg. 1307: 750 GPM Bldg. 4247: 1000 GPM Bldg. 4841: 500 GPM
6. Attachment J-15020000-03 – Deluge Systems – The items says to include the heat detection systems. Can you please provide the following information for each of the systems? Examples Below
a. Type of Releasing Panel
b. Number of Heat Detectors
c. Height of installed heat detectors to be tested Answer 6. This information is not available.
7. Attachment J-15020000-03 – Deluge Systems – Bldg. 137 has Automatic Model C/SupraTech valves with HAD detection. The UFC does not address testing for copper tubing detection systems. Can you please provide the government expectations for testing these systems?
a. Does the government have spare parts for these valves?
Answer 7a: No
b. Please provide a list of any spare parts that may be available from the government.
Answer 7b: None are available through the Government
c. Parts for these valves have been discontinued for many years, how is the repair of these handled.
Answer 7c: Repairs would be handled through either the limit of liability on repairs for PM’s or through IDIQ work, or via a complete separate construction contract.
8. Attachment J-15020000-03 – Foam Systems – The systems are just listed as AFFF. Can you please provide the following information for each of the systems? Examples Below a. Type of Releasing Panel
b. Detection for activation – smoke, heat and number of each
c. Height of Hangar
d. Number of AFFF Tanks and Size/weight of each
e. Method of Foam Activation – Monitor, Closed Overhead sprinkler, open overhead sprinkler.
Answer 8: This information is not available Information may be able to be obtained on an as needed basis, throughout repairs if they are needed.
9. Foam System Testing – Please provide additional details on the expectations for the flowing of the foam systems for testing. How should the testing be done and who is responsible for Environmental clean-up?
Answer 9: Testing will be required to be conducted in accordance with UFC requirements and Manufacturers recommended procedures. Contractor will be responsible for any and all aspects regarding Environmental clean-up.
10. Foam System Testing – If the systems are to be flow tested in accordance with UFC, can you verify that all systems have test headers?
If this acceptable to test the proportioner?
Answer 10: Contractor will be required to verify if the System and its respective components are suitable to Test within UFC requirements and Manufacturers recommended procedures.
SECTION A - SOLICITATION/CONTRACT FORM
The 'issued by' organization has changed from
NAVFAC MID ATLANTIC
FEAD CHERRY POINT
BLDG 163 CURTIS ROAD
PSC BOX 8006
CHERRY POINT NC 28533-0006
to
NAVFACSYSCOM MID-ATLANTIC
FEAD CHERRY POINT
BLDG 163 CURTIS ROAD
PSC BOX 8006
CHERRY POINT NC 28533-0006
(End of Summary of Changes)
File details come from the government source that posted it. Updated .