PPI Reponses -0002.pdf.pdf
PDF 98 KB Posted
- Solicitation number
- N4008521R0138
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21R0138_AMENDMENT 0003.pdf | ||
| 21R0138_AMENDMENT 0002.pdf | ||
| Revised PPI Spreadsheet.xlsx | XLSX spreadsheet | |
| 21R0138_AMENDMENT 0001.pdf | ||
| PPI Reponses -0001.pdf | ||
| 52.204-24.pdf | ||
| General Requirements 21R0138.pdf | ||
| Price Schedule Form.pdf | ||
| SECNAV 5512.pdf | ||
| BASE ACCESS INSTRUCTION.pdf | ||
| Wage Determination.pdf | ||
| 1662105 Final Specifications.pdf | ||
| PPI Spreadsheet.xlsx | XLSX spreadsheet | |
| BLANK SPONSOR VERIFICATION SPREADSHEET.xls | XLS spreadsheet | |
| 1662105 Final Drawings.pdf | ||
| 252.223-7999.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page Section Para. Dwg #
1 TST Construction 12/13/2021 M-002 M-002
The intent of the phasing is to provide partial heating/cooling to the "Annex" or "Original" Buildings while the other is loop being worked on. Is the intent to also provide temporary heating/cooling the same phase where New Work will be occuring? Example: do we provide temp cooling in "Annex" building while condenser pipe is being replaced in "Annex" building.
The intent is not to provide temporary heating/cooling in the same phase in which new construction is being performed.
2 TST Construction 12/13/2021 M-002 M-002
There appears to be an unsettled chemical treatment note regarding responsibiltly. Please advise if the mechanical contractor is to provide chemical treatment for the newly installed condenser loops. If so, please provide chemical treatment spec and quantities (especially if chem treatment is to be introduced in Building 230)
Chemical teratment for the newly installed condenser loop piping is not required for this project. Chemical treatment for the closed circuit cooler and the primary geothermal/condenser water loop is part of another previous construction contract referenced on sheet M-401. 0001
3 TST Construction 12/13/2021 Is containerization of condenser water a requirement prior to condenser pipe demo? Yes. 0001
4 TST Construction 12/13/2021 M-401 M-401
Will NAVFAC be responsible for operating all exsiting to remain isolation valves, control valves, globe valves in support of "Annex" and "Original" Bldg construction phasing? (M-401/Notes-4,5,6,7)
Intent is for the mechanical contractor to perform this work with assistance from NAVFAC DDC control personnel. 0001
5 TST Construction 12/13/2021 During the site visit, it was mentioned that Bldg 137 would be unoccupied during the project. Will this be the case? Intent is for the building to be unoccupied. 0001
6 TST Construction 12/13/2021 If the building is unoccupied, will temp conditioning still be required?
No. Intent is to maintain partial heating and cooling based on the loop phasing as indicated on M-002. 0001
7 TST Construction 12/13/2021 M-401
Can you confirm the other " Geothermal Project " work, as mentioned on Page M-401, General Notes # 2, has been completed in the Bldg.137 Mechanical Room and no work on this Page M-401 is necessary.
Appears based on our 12/08/2021 site visit this work has been accomplished. 0001
8 TST Construction 12/13/2021
Does Bldg. 137 Condenser System Loop have any Glycol added into the System ? If so, what percentages of Glycol is required for this Loop ?
Glycol is not required for this condenser loop system. 0001
9 TST Construction 12/13/2021
If no Glycol is in the System, Does the Govt. want us to provide them with a Water Treatment Cost for this System after we complete the project ?
Do not provide any cost for water treatment or glycol. 0001
10 TST Construction 1/19/2022 MD-107
Will the activity relocate the computer equipment, including the equipment in rooms 268 and 270, around the areas we are replacing piping?
The activity will remove and relocate the computer equipment and trainers in Rms 268 and 270. 0003
Project Title: REPLACE CONDENSER WATER LOOP PIPING AT STRIKE WEAPONS
SCHOOL BLDG 137, NAS OCEANA
Solicitation / RFP#: N4008521R0138 - PPI Cut Off Date: 19 Jan 2022
Amend No.
GOVERNMENT RESPONSE
PPI No.
Offeror Date
Submitted
REFERENCE QUESTION