N4008521B2508 Amendment07.pdf
PDF 62 KB Posted
- Attached to
- Infrastructure Reset Demo Buildings - Package D Federal contract opportunity
- Solicitation number
- N4008521B2508
About this file
This is an amendment to a solicitation for the Infrastructure Reset Demo Buildings - Package D project. The amendment provides clarification for safety, health, and occupational health requirements, stating that one full-time site safety and health officer and one alternate will be required. If multiple sites are working simultaneously, a minimum of one competent person must function as the site safety and health officer at each project site. Proof of competency will be required. The amendment also notes that a hygienist will be required onsite during asbestos abatement activities. All other terms and conditions of the solicitation remain unchanged. The project is for the demolition of various buildings according to the provided plans and specifications. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EMD Decision Memorandum.pdf | ||
| N4008521B2508 Amendment08.pdf | ||
| Amended Section 01 35 29 Safety and Occupational Health Requirements.pdf | ||
| N4008521B2508 Amendment06.pdf | ||
| N4008521B2508 Amendment05.pdf | ||
| Amended Section 02 82 16 Removal of Asbestos Materials.pdf | ||
| N4008521B2508 Amendment04.pdf | ||
| N4008521B2508 Amendment03.pdf | ||
| Contractor_Environmental_Guide.pdf | ||
| N4008521B2508 Amendment02.pdf | ||
| N4008521B2508 Amendment01.pdf | ||
| N4008521B2508 Dwgs.pdf | ||
| N4008521B2508AsbestosSurveyReport.pdf | ||
| N4008521B2508Solicitation.pdf | ||
| N4008521B2508Specs.pdf | ||
| N4008521B2508LeadSurveyReport.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
200004
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4008521B2508 Infrastructure Reset Demo Buildings – Package D
Amendment 0007
This amendment should be acknow ledged w hen your bid is submitted. Failure to acknow ledge may constitute grounds for rejection of a bid.
See Continuation Page(s)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Apr-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521B2508
X 9B. DATED (SEE ITEM 11)
18-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Apr-2021
CODE
NAVFACSYSCOM MID-ATLANTIC
ROICC CAMP LEJEUNE
1005 MICHAEL ROAD
CAMP LEJEUNE NC 28547-2521
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008521B2508
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND 0007
The purpose of this amendment is to provide the following information:
1. Clarification for SSHO requirements have been provided as follows:
a. One Full Time SSHO for the project and 1 Alternate SSHO will be required. If multiple sites are working at the same time, the contractor shall employ a minimum of one competent person at each project site to function as the SSHO. Proof of competency/qualification shall be provided as required in the EM 385-1-1 “01.A.17”. The SSHO and/or Competent Person will be a full time responsbility. SSHO or Competent Person will be present at the site during all work activities.
b. A Hygienist will be required onsite during asbestos abatement.
2. All other terms and conditions remain unchanged.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .