This amendment modifies a solicitation for demolition services. The Navy is seeking contractors to demolish various buildings at Camp Lejeune according to the plans and specifications. The amendment provides responses to contractor questions that clarify requirements around scheduling software, as-built drawings, lead inspection plans, removal of trailers and other structures, availability of utilities, and quantities for asbestos abatement. Contractors must acknowledge any amendments when submitting their bids.

View the file

Other files for this federal contract opportunity

Other files attached to Infrastructure Reset Demo Buildings - Package D, newest first.
File Type Posted
N4008521B2508 Amendment08.pdf PDF
EMD Decision Memorandum.pdf PDF
N4008521B2508 Amendment07.pdf PDF
Amended Section 01 35 29 Safety and Occupational Health Requirements.pdf PDF
N4008521B2508 Amendment06.pdf PDF
N4008521B2508 Amendment05.pdf PDF
Amended Section 02 82 16 Removal of Asbestos Materials.pdf PDF
N4008521B2508 Amendment03.pdf PDF
Contractor_Environmental_Guide.pdf PDF
N4008521B2508 Amendment02.pdf PDF
N4008521B2508 Amendment01.pdf PDF
N4008521B2508AsbestosSurveyReport.pdf PDF
N4008521B2508Solicitation.pdf PDF
N4008521B2508Specs.pdf PDF
N4008521B2508LeadSurveyReport.pdf PDF
N4008521B2508 Dwgs.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

200004

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N4008521B2508 Infrastructure Reset Demo Buildings – Package D

Amendment 0004

This amendment should be acknow ledged w hen your bid is submitted. Failure to acknow ledge may constitute grounds for rejection of a bid.

See Continuation Page(s)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521B2508

X 9B. DATED (SEE ITEM 11)

18-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Apr-2021

CODE

NAVFACSYSCOM MID-ATLANTIC

ROICC CAMP LEJEUNE

1005 MICHAEL ROAD

CAMP LEJEUNE NC 28547-2521

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008521B2508

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMEND 0004

The purpose of this amendment is to provide the following information:

1. RFI responses have been provided as follows.

2. All other terms and conditions remain unchanged.

RFIs Amendment 0004

1. Under Section 01 32 16 it states that a "...current mandated scheduling program can be used". Is Microsoft Project an acceptable scheduling software for these projects?

Yes.

2. Please confirm that Section 01 78 30 is not applicable to these contracts.

Section 01 78 30 paragraph 1.2.1 is applicable. Contractor to provide redlined asbuilts as to what was demoed outside of the footprint of the building.

3. Please provide the applicable lead specification section for this project.

A Lead specification is not required. See architectural Demolition sheets under Lead Inspection Plan Notes.

Revise notes to remove ...”AND SPECIFICATIONS...” to read as follows:

REMOVAL OR ENCAPSULATION OF LEAD PAINT PRIOR TO BUILDING DEMOLITION IS NOT REQUIRED, ALL WORK SHOULD BE CONDUCTED BY WORKERS TRAINED IN "LEAD SAFE WORK PRACTICES" AS OUTLINED BY

THE OCCUPATIONALLY SAFETY AND HEALTH ADMINISTRATION (OSHA).

CONTRACTOR TO REVIEW LEAD INSPECTION REPORT AND SPECIFICATIONS BEFORE COMMENCING

DEMOLITION. IF ADDITIONAL COATINGS ARE FOUND DURING DEMOLITION THAT ARE NOT ON THE SURVEY REPORT, CONTRACTOR TO ASSUME THESE MATERIALS ARE LEAD CONTAINING COATINGS UNTIL SAMPLED

AND TESTED BY ACCREDITED AND LICENSED LEAD PROFESSIONALS.

4. Are there buildings deemed to be unsafe for entry to be able to properly perform asbestos and/or lead abatement prior to demo?

At the time that field work was performed for Asbestos and Lead testing, no buildings were deemed to be unsafe for entry.

5. Is Contractor allowed to remove and haul mobile trailers off site versus demolition on site after proper disconnects are made?

Yes as long as trailers are removed from the site.

6. Can the government provide Contractor with soil reports relating to specifications, Section 01 35 29, Paragraph 1.9.1. Section “M”. Polychlorinated Biphenyls.

No soils reports available.

7. Is there a guideline for the PCB plan? Is there a survey report for the locations and quantities of PCB’s?

No PCBs suspected within area of work.

8. Will fire ant quarantine requirements be applied for each building site?

North Carolina Department of Agriculture and Consumer Services regulations apply for Red Imported Fire Ant quarantine program.

9. Can contractors conduct a pre‐demo inspection to determine if there are or are not any fire ants on any given building demolition site? What kind of certification will be required?

North Carolina Department of Agriculture and Consumer Services regulations apply for Red Imported Fire Ant quarantine program. Assume that there are fire ants present.

10. Will temporary water and electricity services be provided by the government during this contract?

Temporary water and electricity is available. Contractor is responsible for all costs associated with tapping into and using these services.

11. Will Insulation on metal ductwork need to be removed before salvaging for recycling?

All items inside the building are considered to be property of the contractor upon award. Contractor can dispose or retain these items as desired during demolition.

12. Building FC318 is a metal building with caulking at the Side laps that contains Asbestos per the Asbestos survey. As this caulking will not be able to be removed from the metal panels and it is non‐friable, how will the metal panels be disposed of? Will they be considered ACM (Asbestos Containing Materials) or will panels be able to be disposed of in a metals dumpster?

If ACM cannot be removed from metal panels, then panels with ACM (caulk) attached must be treated as ACM and disposed of accordingly.

13. Will NAVFAC consider an alternate proposal for disposal of demolition materials vs costly separation of materials?

Disposal of demolition materials as per specifications.

14. Are all utilities on Camp Lejeune privatized? If so, please provide us with the utility name and contact information.

Both Government owned and private utilities exist on Camp Lejeune. Contractor shall locate all utilities.

Utilities contacts will be provided upon award.

15. GIS Data needs more information.

Reference Specification section 01 78 30 for guidance on GIS Deliverables.

16. Looking at the Demolition Specs 02 41 00 starting at 3.1.10, in many of these sections relating to electrical and mechanical equipment the specifications state “Remove and Salvage”. This is unusual for a total demolition and would increase costs significantly if we are going into every building to try and salvage the items the spec mentions. Can you please specify which equipment needs to be removed and salvaged? Or should we assume that all mechanical and electrical equipment will be removed and salvaged?

All items inside the building are considered to be property of the contractor upon award. Contractor can dispose or retain these items as desired during demolition.

17. Can we expect that the drawbridge to Onslow beach will have the current restrictions during construction? It is currently only lowered for access on the weekdays from 0700‐0800, 1200‐1300, and after 1700.

Onslow Beach Bridge repair contract will be completed prior to award of this contract. Draw bridge will open and close on a 30 minute interval schedule in most cases unless marine vessel requires immediate opening.

18. If the current restrictions for the bridge at Onslow Beach are still in place, can we request that the drawbridge be lowered when we have equipment or dumpers to load/offload?

Onslow Beach Bridge repair contract will be completed prior to award of this contract. Draw bridge will open and close on a 30 minute interval schedule in most cases unless marine vessel requires immediate opening.

19. Are you aware of any foundation piles that will need to be removed at any of the buildings? Or are we to assume that all buildings have a concrete foundation?

All buildings will be assumed to have no piles and have a concrete foundation.

20. When evaluating the Asbestos survey, which quantity should be included for bidding purposes? Should we consider Quantities identified by the Walker Group, Additional Asbestos Containing Materials found on Government provided reports, or materials shown on the drawings or a combination of these? In order to provide the best price for this project we request a specified quantity for abatement in each building.

The combination of all of the above shall be used for asbestos quantities.

21. It was noted that on some of the sites that there were sewer lift stations. Are the sewer lift stations part of the utilities that need to be removed?

Only lift stations indicated on the plans will be removed.

22. Can you clarify which buildings utilities are owned by the Government and which are owned by private companies, i.e. Piedmont Gas and Carolina Power and Light Company?

Gas – Piedmont; Comm – Base, Century Link, Time Warner; All others owned by Base

23. It is understood that for overhead electrical power feeds that the service is disconnected at the first power pole from the building. Are the can transformers on the pole to be removed or kept in place?

This information is provided in the work items.

24. Building FC301 and TC562 were indicated to not currently have ACM but had ACM in the past. Will it be required that we test these buildings before commencing demolition?

The base asbestos report will address the ACM in the building.

(End of Summary of Changes)