200013_Amend 0002.pdf
PDF 1 MB Posted
- Attached to
- Drain System for Cooling Towers
- Solicitation number
- N4008520R4134
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20-0013_REVISED_09.03.20.pdf | ||
| 200013_Amend 0001.pdf | ||
| 20-0013 SOW.pdf | ||
| N4008520B0013 Dwgs.pdf | ||
| N4008520B0013 Specs.pdf | ||
| RFP 200013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-20-R-4134 Amendment 0002
CONTINUATION SHEET
1. QUESTION: Are there any invert elevations for the underground connections? We need to know how deep our connections will be.
ANSWER: Invert elevations to be determined in the field.
2. QUESTION: Is there any demo associated with the existing pipe? Will it need to be removed or will it be capped and left in place?
ANSWER: Existing piping to remain in place.
6. All other terms and conditions remain unchanged.
| 200013_Amend 0002 without continuation |