20-0013 SOW.pdf

PDF 87 KB Posted

Attached to
Drain System for Cooling Towers
Solicitation number
N4008520R4134
Issued by

View the file

Other files

File Type Posted
20-0013_REVISED_09.03.20.pdf PDF
200013_Amend 0002.pdf PDF
200013_Amend 0001.pdf PDF
N4008520B0013 Dwgs.pdf PDF
N4008520B0013 Specs.pdf PDF
RFP 200013.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work Project # 20-0013

Drain System for Cooling Towers

General Description:

This project will re-route existing cooling tower discharge from stormwater to sanitary sewer at multiple locations across Marine Corps Base Camp Lejeune and Marine Corps Air Station New River. Discharge shall include all bleeds, drains, and overflows.

Reference drawings can be requested from PWD Technical Records at Building 1005 Michael Road.

Cooling Tower Inventory & Discharge Study from July 2017 can also be requested from PWD Technical Records.

Detailed Requirements:

Contractor shall install new sanitary sewer PVC to gravity from the discharge at nineteen (19) cooling towers to existing sanitary sewer at eleven (11) facilities. New pipe shall tie into existing sanitary sewer manholes, lines, lift stations, or include a new doghouse manhole. All fittings shall be provided. Refer to drawings for specific information at each site.

General Notes:

Contractor shall locate all underground utilities prior to ground disturbance. Contract shall preserve and protect all existing utilities and be responsible to any damage to utilities.

Contractor shall repair all sidewalks, drives and areas disturbed by construction activities. Contractor shall restore all areas back to existing conditions and provide sod.