Amnd 0001 20R4063 FINAL.pdf
PDF 321 KB Posted
- Attached to
- Renovate Building M255
- Solicitation number
- N4008520R4063
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19-0091_Bldg M255 ACM - LBP FINAL REPORT.pdf | ||
| N4008519B0091 SPECs.pdf | ||
| N4008519B0091 DWGs.pdf | ||
| N4008519B0091 DWGs_Part2of2.pdf | ||
| N4008519B0091 DWGs_Part1.pdf | ||
| Master PPI Form Template.xls | XLS spreadsheet | |
| RFP 20R4063 Renovate Bldg M255.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
AMENDMENT NO. 0001 04/10/20 1634079
ACQ1
NAVAL FACILITIES ENGINEERING COMMAND,
MID-ATLANTIC
9742 MARYLAND AVENUE
NORFOLK, VA 23511-3095
See Item 6
✘ N4008520R4063
03/13/20
N4008520R4063 Renovate Bldg M255
The date and the hour for the receipt of proposals remains 17 April 2020 no later than 2:00 pm
(EDT).
See continuation page(s).
19-0091 Renovate Bldg M255 Solicitation N40085-20-R-4063
Marine Corps Base Camp Lejeune, North Carolina Amendment 0001
Block 14. DESCRIPTION OF AMENDMENT (cont.)
A. The following provides the Government’s responses to preaward inquiries:
REFERENCE
Page Section Para.
QUESTION GOVERNMENT RESPONSE
A-7
Will the existing concrete floor finishes have to be removed before sealing the floor?
Yes, all existing applied floor finishes shall be removed, per
Remarks Note, Existing
Conditions Finish Schedule Sheet
A-3.
A-2 / A-
Is the single partition wall on Drawing
A-2 referring to the plywood wall on
Drawing A-11?
Yes, see the Section Cut Mark on the wall (Sheet A2) 2/A2/A11.
A-3 Will all remaining walls be lead abated to remove the finish as noted on the existing finish schedule on Drawing A-
3?
Yes, lead paint shall be abated.
A-8
A-1/A-9
Is the Cement Fiber Board on Drawing
A-8 to be painted or is it pre-finished?
Drawing A-1 indicates that the existing stucco is to be removed. However, it referenced on Drawing A-9 that the exterior stucco finish remains. Is the intention for all the existing stucco to be removed and replace with new stucco?
The Cement Fiber Board shall be pre-finished. Color chosen from manufacturers standard color selection.
The existing exterior stucco shall be removed and replaced with new, per Photo notes Sheet A-1 and renovated wall sections.
A-7
Will the existing concrete floor finishes have to be removed before sealing the floor?
Yes, all existing applied floor finishes shall be removed, per
Remarks Note, Existing
Conditions Finish Schedule Sheet
A-3.
A. All other contract terms and conditions remain unchanged.