19-0063 ACM-LBP Report - FINAL.pdf

PDF 3 MB Posted

Attached to
RENOVATE M602 Federal contract opportunity
Solicitation number
N4008520R4049
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to RENOVATE M602, newest first.
File Type Posted
60025304 M-3 Rev.pdf PDF
60025295 FA-2 Rev.pdf PDF
60025309 E-1 Rev.pdf PDF
60025299 P-3 Rev.pdf PDF
60025278 LS-1 Rev.pdf PDF
60025279 LS-2 Rev.pdf PDF
60025288 A5 Rev.pdf PDF
32 31 13.53 High Security Chain Link Fences.pdf PDF
Amnd 0002 20R4049.pdf PDF
60025281 C-1 Rev.pdf PDF
60025289 A6 Rev.pdf PDF
60025324 E-16 Rev.pdf PDF
60025283 C-3 Rev.pdf PDF
60025306 M-5 Rev.pdf PDF
60025285 A2 Rev..pdf PDF
60025314 E-6 Rev.pdf PDF
60025300 P-4 Rev.pdf PDF
60025282 C-2 Rev.pdf PDF
60025286 A3 Rev.pdf PDF
60025283A C-4 Rev.pdf PDF
60025322 E-14 Rev.pdf PDF
Amnd 0001 20R4049.pdf PDF
Master PPI Form Template.xls XLS spreadsheet
N4008519B0063 DWGs.pdf PDF
RFP 19-0063 Renovate M602.pdf PDF
N4008519B0063 SPECs.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SURVEY REPORT FOR ASBESTOS

AND

LEAD-BASED PAINT

Prepared For:

TALLEY & SMITH ARCHITECTURE, INC.

409 EAST MARION STREET

SHELBY, NORTH CAROLINA 28150

Regarding:

DELIVERY ORDER NO. 0032

RENOVATE BLDG. M 602

MARINE CORPS BASE – CAMP JOHNSON

JACKSONVILLE, NORTH CAROLINA

Prepared By:

ALLIED CONSULTING & ENVIRONMENTAL SERVICES, LLC

POST OFFICE BOX 2426

SHELBY, NORTH CAROLINA 28151

PHONE (704) 600-6255

FAX (704) 482-5596

ISSUE DATE: OCTOBER 22, 2019

ACES PROJECT: 2019-06-045

SURVEY REPORT

FOR ASBESTOS AND LEAD-BASED PAINT

Prepared for:

TALLEY & SMITH ARCHITECTURE, INC.

409 EAST MARION STREET

SHELBY, NORTH CAROLINA 28150

Regarding:

DELIVERY ORDER NO. 0032

RENOVATE BLDG. M 602

ACES Project No.: 2019-06-045

October 22, 2019

Prepared by: Reviewed by:

DeWitt Whitten, CHMM, REM, CES, REPA Robert L. Smith, AIA, LEED AP General Manager Managing Partner NC Licensed Asbestos Inspector #10706 NC Licensed LBP Risk Assessor #120118

TABLE OF CONTENTS

1.0 INTRODUCTION

2.0 GENERAL BACKGROUND INFORMATION

2.1 ASBESTOS

2.2 LEAD-BASED PAINT

2.3 PROJECT SCOPE

3.0 METHODOLOGY

3.1 ASBESTOS

3.2 LEAD-BASED PAINT

4.0 FINDINGS AND RECOMMENDATIONS

4.1 NON-ASBESTOS CONTAINING MATERIALS

4.2 ASBESTOS CONTAINING MATERIALS & PRESUMED ASBESTOS CONTAINING MATERIALS

4.3 LEAD-BASED PAINT

4.4 RECOMMENDATIONS - ACM & PACM

4.5 RECOMMENDATIONS - LEAD-BASED PAINT

5.0 LIMITATIONS

Appendix 1 Figures Appendix 2

Asbestos Analytical Results Chain of Custody

Appendix 3 Asbestos Report by Others

Appendix 4 XRF Field Data Sheets

Renovate Bldg. M 602 October 22, 2019 Marine Corps Base – Camp Johnson ACES Project: 2019-06-045 1

SURVEY REPORT

FOR ASBESTOS AND LEAD-BASED PAINT

RENOVATE BLDG. M 602

1.0 INTRODUCTION

As authorized by Talley & Smith Architecture, Inc. on June 19, 2019, personnel of Allied Consulting and Environmental Services, LLC (ACES) performed a non-invasive survey for suspect asbestos containing materials (ACM) and a limited lead-based paint (LBP) survey for building M- 602 at the Marine Corps Base – Camp Johnson in Jacksonville, North Carolina on June 25, 2019.

The surveys were conducted for the purpose of identifying asbestos containing materials and lead-based painted materials that may be impacted by the proposed renovation of the Building M-602.

2.0 GENERAL BACKGROUND INFORMATION

2.1 Asbestos

The term “asbestos” refers to a group of naturally-occurring, fibrous minerals that are commercially mined throughout the world, primarily in Canada, Russia, and South Africa.

Asbestos has been used in hundreds of products. Collectively, these products are referred to as asbestos-containing materials (ACMs). Asbestos gained wide use because it is plentiful, readily available, low in cost, and because of its unique properties – fire resistance, high tensile strength, resistance, and insulating characteristics.

As an insulator, asbestos received wide spread use for thermal insulation and condensation control. Asbestos is added to a variety of building materials to enhance strength. It is found in concrete and concrete-like products. Asbestos cement products are used as siding and roofing shingles, wallboard, as corrugated or flat sheets for roofing and partition walls, and as piping.

Asbestos has also been added to asphalt, vinyl, and other materials to make products like roofing cements, felts and shingles, exterior siding materials, floor tiles, joint compounds, and mastics/adhesives. Asbestos also proved valuable as a component of acoustical plaster. This material was troweled-on or sprayed-on to ceilings or walls. As a decorative product, asbestos was frequently used to texture ceilings, walls, and other painted surfaces. Asbestos is still mined commercially and used in many common products, including brake shoes, roofing materials, and flooring products. It is important to realize that commercially available products containing asbestos can still be purchased. It is a common misconception that asbestos is no longer used.

The three most commonly encountered types of asbestos are sometimes referred to by their predominant color. Chrysotile (white) is by far the most frequently used asbestos mineral, constituting approximately 95% of all commercial and industrial applications. Chrysotile fibers

Marine Corps Base – Camp Johnson ACES Project: 2019-06-045 2 are long and flexible and can be spun or woven into cloth. Amosite (brown) and crocidolite (blue) are used in approximately 4-5% of asbestos-containing products.

The U.S. Environmental Protection Agency promulgated the National Emission Standards for Hazardous Air Pollutants (NESHAP) [40 CFR Part 61], which addresses the application, removal, and disposal of asbestos-containing materials (ACM). Under NESHAP, the following categories are defined for asbestos-containing materials:

Friable - When dry, can be crumbled, pulverized, or reduced to powder by hand pressure.

Nonfriable - When dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.

Category I Nonfriable ACM - Packings, gaskets, resilient floor coverings, and asphalt roofing products containing more than 1% asbestos.

Category II Nonfriable ACM – Any material excluding Category I Nonfriable ACM containing more than 1% asbestos.

Regulated Asbestos Containing Material (RACM) – RACM include one of the following:

1) Friable ACM

2) Category I Nonfriable ACM that has become friable.

3) Category I Nonfriable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading.

4) Category II Nonfriable ACM that has a high probability of becoming, or has become, friable by the forces expected to act on the material in the course of demolition or renovation operations.

Under NESHAP, the following actions are required:

1) Prior to the commencement of demolition or renovation activities, the building owner must inspect the affected facility or part of the facility where the demolition or renovation activities will occur for the presence of asbestos.

2) Remove all RACM from the facility before any activity begins that would break up, dislodge, or similarly disturb the material or preclude access for subsequent removal.

3) RACM need not be removed if:

a) It is Category I nonfriable ACM that is not in poor condition.

b) It is on a facility component that is encased in concrete or other similar material and is adequately wet whenever exposed.

c) It was not accessible for testing and was therefore not discovered until after demolition began and because of the demolition the material cannot be safely removed.

Marine Corps Base – Camp Johnson ACES Project: 2019-06-045 3

d) It is Category II non-friable ACM and the probability is low that the material will become crumbled, pulverized, or reduced to powder during demolition.

The Occupational Safety and Health Administration (OSHA) has established three sets of regulatory standards pertaining to asbestos exposure:

29 CFR 1910.1001 General Industry

29 CFR 1926.1101 Construction Industry

29 CFR 1910.134 Respiratory Protection

The construction industry standard covers activities involving asbestos demolition, removal, alteration, repair, maintenance, installation, cleanup, transportation, disposal, and storage.

The general industry standard covers other activities where asbestos exposure is possible.

Addressed under the OSHA standards are building owner / employer responsibilities regarding the identification of identified or presumed asbestos containing materials (PACM), notification to tenants / employees of the presence of asbestos, employee training, and work procedures.

2.2 Lead-based Paint

Lead-based paint is paint containing lead, a heavy metal, which is used as pigment. Lead chromate (PbCrO4 - "chrome yellow") and lead carbonate(PbCO3 - "white lead") are the most common lead compounds used as pigments. Lead is also added to paint to speed drying, increase durability, retain a fresh appearance, and resist moisture that causes corrosion. Paint with significant lead content is still used in industry and by the military. For example, leaded paint is sometimes used to paint roadway markings and parking lot lines.

Although lead improves paint performance, it is a dangerous substance. It is especially damaging to children under age six whose bodies are still developing. Lead causes nervous system damage, hearing loss, stunted growth, and delayed development. It can cause kidney damage and affects every organ system of the body. It also is dangerous to adults, and can cause reproductive problems for both men and women. One myth related to lead-based paint is that the most common cause of poisoning was eating leaded paint chips. In fact, the most common pathway of childhood lead exposure is through ingestion of lead dust through normal hand-to-mouth contact during which children swallow lead dust dislodged from deteriorated paint or lead dust generated during remodeling or painting. Lead dust from remodeling or deteriorated paint lands on the floor near where children play and can ingest it.

Paint containing more than 0.06% (600 ppm) lead was banned for residential use in the United States in 1978 by the U.S. Consumer Product Safety Commission (16 Code of Federal Regulations CFR 1303). The U.S. Government defines "lead-based paint" as any "paint, surface coating that contains lead equal to or exceeding one milligram per square centimeter (1.0 mg/cm2) or 0.5% by weight." These definitions are used to enforce regulations that apply to certain activities conducted in housing constructed prior to 1978, such as abatement, or the permanent elimination of a "lead-based paint hazard." Construction activities that involve LBP are addressed OSHA in 29 CFR 1926.62 (Lead in Construction).

http://en.wikipedia.org/wiki/Paint http://en.wikipedia.org/wiki/Lead http://en.wikipedia.org/wiki/Heavy_metals http://en.wikipedia.org/wiki/Lead%28II%29_chromate http://en.wikipedia.org/wiki/Lead%28II%29_chromate http://en.wikipedia.org/wiki/Lead http://en.wikipedia.org/wiki/Chromium http://en.wikipedia.org/wiki/Oxygen http://en.wikipedia.org/wiki/Chrome_yellow http://en.wikipedia.org/wiki/Lead%28II%29_carbonate http://en.wikipedia.org/wiki/Lead http://en.wikipedia.org/wiki/Carbon http://en.wikipedia.org/wiki/Oxygen http://en.wikipedia.org/wiki/White_lead http://en.wikipedia.org/wiki/Kidney http://en.wikipedia.org/wiki/Consumer_Product_Safety_Commission

Marine Corps Base – Camp Johnson ACES Project: 2019-06-045 4

2.3 Project Scope

The scope of this survey included the interior and exterior of Building M-602 as designated on drawings furnished by Talley & Smith Architecture, Inc., the proposed scope of work provided to ACES, and as discussed in our conversation on June 15, 2019. It is our understanding that the building will be renovated in the near future.

3.0 METHODOLOGY

3.1 Asbestos

For this project, a visual, non-invasive survey and sampling for suspect asbestos containing materials (ACM) was conducted at the above referenced building. ACES personnel submitted a total of ten (10) bulk samples of suspect ACM that may be impacted by the planned renovation project. Samples were collected by a NC Licensed Asbestos Inspector (DeWitt Whitten - #10706) and submitted to a NVLAP Accredited Asbestos Laboratory (EMSL in Charlotte, NC).

Samples were analyzed using Polarized Light Microscopy (PLM) by EPA Method 600/R-93/116.

Due to some materials consisting of more than one layer, a total of twenty-two (22) samples were analyzed by the laboratory. Samples included the following materials: roofing materials, drywall, spackling, and floor tile and associated mastic. Please refer to the Sample Location Plan (Figure No. 1) and the Chain of Custody sheet in Appendices 1 and 2, respectively, for the approximate sample locations and the specific materials sampled.

During the survey, ACES personnel also reviewed a previously prepared report for Building M- 602 provided by personnel of the Camp Lejeune Marine Corps’ Environmental Protection office.

The report was dated March 29, 2019 (print date). For the purpose of this report, the materials listed in the report are considered presumed asbestos containing materials. These materials are discussed further in Section 4.3 of this report. A copy of the provided report prepared by others is presented in Appendix 3.

3.2 Lead-based Paint

A North Carolina Lead-based Paint Risk Assessor (Mr. DeWitt Whitten, Risk Assessor #120118) performed a limited lead-based paint (LBP) survey of the interior and exterior painted surfaces at thirty-seven (37) locations for Building M-602. Please refer to the Sample Location Plans (Figure No. 2) and the XRF Field Data Sheets in Appendices 1 and 4, respectively, for the approximate test locations and the specific materials sampled. The testing was conducted using a INNOV-X Portable X-ray Fluorescence (XRF) Analyzer to screen surface coatings that may contain lead. The sampling for lead-based paint was not a comprehensive surface by surface testing of the paint (e.g. a HUD level survey), but consisted of testing representative painted surfaces for the presence of LBP. Surfaces tested included exterior and interior walls, exterior and interior doors and door frames, columns, soffits, fascia boards, and window components.

Marine Corps Base – Camp Johnson ACES Project: 2019-06-045 5

4.0 FINDINGS AND RECOMMENDATIONS

4.1 Non-asbestos Containing Materials

Seventeen (17) samples of the twenty-two (22) samples analyzed by EMSL did not contain asbestos (i.e. greater than one percent asbestos).

4.2 Asbestos Containing Materials & Presumed Asbestos Containing Materials (PACM)

Asbestos was detected in five (5) of the twenty-two (22) samples analyzed by EMSL as shown in Table 1.

TABLE 1 – SUMMARY OF KNOWN ACM

SAMPLE ID ACM DESRIPTION APPROX. QUANTITY

FT-1, FT-2 Mastic associated with 12x12 Floor tile 2,500 sq. ft.

FT-3, FT-4 Red Floor tile and associated mastic 200 sq. ft.

In addition, an asbestos report prepared by others indicated that friable and/or non-friable ACM was present in the building as shown in Table 2.

TABLE 2 – SUMMARY OF PRESUMED ACM

ACM/PACM DESRIPTION REPORTED LOCATION APPROX. QUANTITY

12” Beige with Olive Floor Tile and Adhesive

East Center Main Room; West End Room 1,700 sq. ft.

12” Beige Floor Tile and Adhesive East End Room; West Center Room 850 sq. ft.

9” Brown Floor Tile and Adhesive East Center Main Room & Southwest Storage 215 sq. ft.

Interior Caulking Windows Throughout 370 lin. ft.

Exterior Caulking Windows and Doors, Outer/New and Inner/Residual 425 lin. ft.

4.3 Lead-based Paint

The results of the testing (Appendix 3) revealed that lead-based paint was present at nine (9) locations associated with Building M-602 as shown in Table 3.

TABLE 3 – SUMMARY OF LEAD-BASED PAINT FINDINGS

FACILITY ID. XRF TEST NO. INT./EXT. FEATURE SUBSTRATE COLOR XRF RDG.1

M-602 189 Interior Wall Clay block Tan 1.24

M-602 192 Interior Wall Clay block Black 1.06

M-602 195 Interior Overhead Beam Wood Tan 1.66

M-602 196 Interior Ceiling Wood White 1.03

M-602 201 Interior Column Concrete Tan > 1.0

M-602 208 Interior Door casing Wood Tan > 5.0

M-602 214 Exterior Fascia White Metal 2.67

M-602 218 Exterior Gable White Wood > 5.0

M-602 219 Interior Gable fascia White Vinyl > 5.0

NOTE: 1) units in milligrams per square centimeter (mg/cm2)

Marine Corps Base – Camp Johnson ACES Project: 2019-06-045 6

4.4 Recommendations - ACM & Presumed ACM

Asbestos containing materials (ACM) and Presumed Asbestos Containing Materials (PACM) were identified in the building. In their current condition, the materials are considered non-friable and/or friable ACM/PACM. For the purposes of renovation, the identified ACM and PACM should be considered Regulated Asbestos Containing Materials (RACM). These materials and any other suspect ACM where present should be removed prior to the renovation of the facilities by accredited personnel in accordance with applicable local, state, and federal regulations and guidelines. Disposal of the removed RACM should be disposed of in accordance with applicable local, state, and federal regulations/guidelines.

All ACM waste materials resulting from the renovation activities should be collected and disposed of in accordance with applicable state and federal regulations, the project specifications, and the “Marine Corps Base (MCB) Camp Lejeune Contractor Environmental Guidelines”.

4.5 Recommendations - Lead-based Paint

Lead-based paint (LBP), i.e. paint that contains lead equal to or exceeding one milligram per square centimeter (1.0 mg/cm2), was identified at nine (9) locations on the painted surfaces tested at the building as shown in Table 3. ACES recommends that the lead paint on the various surfaces not be disturbed as a part of the repair/renovation activities unless necessary as a result of the repair and/or renovation. If the painted surfaces must be disturbed, removal of the LBP should be performed in accordance with local, state, and federal regulations.

In addition, lead was identified on other painted surfaces but the concentration did not meet the definition of LBP. For painted surfaces where LBP was not present but lead was present and would be impacted by the renovation activities, the necessary protection for the potential exposure to lead that may be present should be addressed as outlined in applicable Occupational Safety and Health Administration (OSHA) regulatory standards.

All waste materials from the renovations should be collected and disposed of in accordance with applicable state and federal regulations, the project specifications, and the “Marine Corps Base (MCB) Camp Lejeune Contractor Environmental Guidelines”.

5.0 LIMITATIONS

This report has been prepared for the exclusive use of Talley & Smith Architecture, Inc. and their agents with regard to Building M-602 located at Camp Johnson in Jacksonville, North Carolina. This report has been prepared in accordance with generally accepted environmental practices. No other warranty, expressed or implied, is made. Our observations are based upon conditions readily visible at the time of our site visit. We have not verified the completeness or accuracy of the information provided by others.

Materials identified as presumed ACM should be considered to contain asbestos or additional sampling and analysis should be performed to confirm or deny the presence of asbestos.

Marine Corps Base – Camp Johnson ACES Project: 2019-06-045 7

During the site visit, accessible areas were visually surveyed for the presence of suspect asbestos containing materials (ACM) and lead-based paints (LBP). Inaccessible areas, such as above ceilings or behind walls may have not been surveyed; therefore, all ACM and/or LBP may not have been identified. Areas inspected were those designated by the scope of services. As with any similar survey of this nature, actual conditions exist only at the precise locations from which bulk samples were collected and/or LBP samples measured. Certain inferences are based on the results of this sampling and related testing to form a professional opinion of conditions in areas beyond those from which the samples were collected. No other warranty, expressed or implied, is made.

Under this scope of services, ACES assumes no responsibility regarding response actions (e.g.

O&M Plan, encapsulation, abatement, removal, worker notification, etc.) initiated as a result of these findings. It is important to note that the Building Owner has a number of responsibilities and obligations as found under 40 CFR 745 (also known as Title X) including notification and/or disclosure of all information concerning LBP to workers and buyers. ACES assumes no liability for the duties and responsibilities of the Building Owner with respect to compliance with these regulations. Compliance with regulations and response actions are the sole responsibility of the Building Owner and should be conducted in accordance with local, state and/or federal requirements, and should be performed by appropriately qualified and licensed personnel, as warranted.

ACES, by virtue of providing the services described in this report, does not assume the responsibility of the person(s) in charge of the site, or otherwise undertake responsibility for reporting to any local, state, or federal public agencies any conditions at the site that may present a potential danger to public health, safety, or the environment. It is the client’s responsibility to notify the appropriate local, state, or federal public agencies as required by law, or otherwise to disclose, in a timely manner, any information that may be necessary to prevent any danger to public health, safety, or the environment. The contents of this report should not be construed in any way as a recommendation to purchase, sell, or further develop the project site.

APPENDIX 1

FIGURES

APPENDIX 2

ASBESTOS ANALYTICAL RESULTS

CHAIN OF CUSTODY

EMSL Analytical, Inc.

10801 Southern Loop Blvd Pineville, NC 28134

Tel/Fax: (704) 525-2205 / (704) 525-2382 http://www.EMSL.com / charlottelab@emsl.com

411906398EMSL Order:

Customer ID: ALLC25

Customer PO:

Project ID:

Attention: Phone:Dewitt Whitten (704) 232-0152

Fax:Allied Consulting & Environmental Svs

Received Date:P.O. Box 2426 06/26/2019 12:50 PM

Analysis Date:Shelby, NC 28151 07/02/2019

Collected Date: 06/26/2019

Project: M602/2019-06-045

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

RS-1

411906398-0001

None DetectedQuartz

Ca Carbonate

Non-fibrous (Other)

8%

5%

77%

Glass10%Black

Fibrous

Homogeneous

Roof Shingle

RS-2

411906398-0002

None DetectedQuartz

Ca Carbonate

Non-fibrous (Other)

5%

20%

70%

Glass5%White/Black/Green

Fibrous

Homogeneous

Roof Shingle

RF-1

411906398-0003

None DetectedNon-fibrous (Other)30%Cellulose70%Black

Fibrous

Homogeneous

Roof Felt

RF-2

411906398-0004

None DetectedNon-fibrous (Other)40%Cellulose60%Black

Fibrous

Homogeneous

Roof Felt

DW-1-Drywall

411906398-0005

None DetectedNon-fibrous (Other)95%Cellulose5%Gray

Fibrous

Homogeneous

Drywall & Spackling

DW-1-Joint Compound

411906398-0005A

None DetectedCa Carbonate

Non-fibrous (Other)

30%

70%

White

Non-Fibrous

Homogeneous

Drywall & Spackling

DW-1-Tape

411906398-0005B

None DetectedNon-fibrous (Other)15%Glass85%White

Non-Fibrous

Homogeneous

Drywall & Spackling

DW-2-Drywall

411906398-0006

None DetectedNon-fibrous (Other)89%Cellulose

Glass

10%

1%

Brown/Gray

Fibrous

Homogeneous

Drywall & Spackling

DW-2-Joint Compound

411906398-0006A

None DetectedCa Carbonate

Non-fibrous (Other)

40%

60%

White

Non-Fibrous

Homogeneous

Drywall & Spackling

DW-2-Tape

411906398-0006B

None DetectedCellulose100%Tan

Fibrous

Homogeneous

Drywall & Spackling

S-3-Joint Compound

411906398-0007

None DetectedCa Carbonate

Non-fibrous (Other)

30%

70%

White

Non-Fibrous

Homogeneous

Spackling

S-3-Tape

411906398-0007A

None DetectedNon-fibrous (Other)1%Cellulose99%Tan

Fibrous

Homogeneous

Spackling

FT-1-Floor Tile

411906398-0008

None DetectedCa Carbonate

Non-fibrous (Other)

30%

70%

White

Non-Fibrous

Homogeneous

12x12 Floor Tile &

Mastic

FT-1-Mastic

411906398-0008A

5% ChrysotileNon-fibrous (Other)95%Black

Fibrous

Homogeneous

12x12 Floor Tile &

Mastic

FT-2-Floor Tile

411906398-0009

None DetectedCa Carbonate

Non-fibrous (Other)

40%

60%

Tan

Non-Fibrous

Homogeneous

12x12 Floor Tile &

Mastic

FT-2-Mastic

411906398-0009A

4% ChrysotileCa Carbonate

Non-fibrous (Other)

5%

90%

Cellulose1%Black

Non-Fibrous

Homogeneous

12x12 Floor Tile &

Mastic

Initial report from: 07/03/2019 08:13:36

Page 1 of 2ASB_PLM_0008_0001 - 1.78 Printed: 7/3/2019 8:13 AM

EMSL Analytical, Inc.

10801 Southern Loop Blvd Pineville, NC 28134

Tel/Fax: (704) 525-2205 / (704) 525-2382 http://www.EMSL.com / charlottelab@emsl.com

411906398EMSL Order:

Customer ID: ALLC25

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

FT-3-White Floor Tile

411906398-0010

None DetectedCa Carbonate

Non-fibrous (Other)

30%

70%

White

Non-Fibrous

Homogeneous

12x12 Floor Tile &

Mastic

FT-3-Mastic

411906398-0010A

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

12x12 Floor Tile &

Mastic

FT-3-Red Floor Tile

411906398-0010B

6% ChrysotileCa Carbonate

Non-fibrous (Other)

30%

64%

Red

Non-Fibrous

Homogeneous

12x12 Floor Tile &

Mastic

FT-3-Mastic

411906398-0010C

2% ChrysotileNon-fibrous (Other)98%Black

Non-Fibrous

Homogeneous

12x12 Floor Tile &

Mastic

FT-4-Floor Tile

411906398-0011

None DetectedCa Carbonate

Non-fibrous (Other)

40%

60%

White

Non-Fibrous

Homogeneous

12x12 Floor Tile &

Mastic

FT-4-Mastic

411906398-0011A

2% ChrysotileCa Carbonate

Non-fibrous (Other)

5%

91%

Cellulose2%Black

Non-Fibrous

Homogeneous

12x12 Floor Tile &

Mastic

Analyst(s)

Anupriya Tyagi (13)

Katherine Sluder (9)

Lee Plumley, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis . The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 "Interim

Method"), but augmented with procedures outlined in the 1993 ("final") version of the method. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . Interpretation and use of test results are the responsibility of the client. All samples received in acceptable condition unless otherwise noted. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. EMSL recommends gravimetric reduction for all non -friable organically bound materials prior to analysis. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Pineville, NC NVLAP Lab Code 200841-0, VA 3333 00312

Initial report from: 07/03/2019 08:13:36

Page 2 of 2ASB_PLM_0008_0001 - 1.78 Printed: 7/3/2019 8:13 AM

OrderID: 411906398

APPENDIX 3

ASBESTOS REPORT BY OTHERS

ASBESTOS INSPECTION REPORT of:

Building # M602

MCB CAMP LEJEUNE

Friday, March 29, 2019

Print Date

Friday, March 29, 2019 Page 1 of 8Print Date:

INSPECTION SUMMARY

BLDG #:

OCCUPANT:

YEAR BUILT:

BUILDING COMMENTS:

M602

WATER SURVIVAL SCHOOL, SOI

HAZ RANK 3/GREEN [AH AUG2016]

TILE AND MASTIC

AUG2016

ACM REMAINS

APR2014

ACM TILE AND ATTIC TSI DEBRIS REMOVED, ACM TILE AND MASTIC REMAINS

MAR2010 1C

ACM TSI DEBRIS, WEST ATTIC LIMITED, PVS. ACM REMAINS, ADDL SAMPLING, ADDL ACM INCLUDES:

9" BROWN TILE AND MASTIC, AND DEBRIS

INTERIOR AND EXTERIOR CAULKING

NOV07

PVS. ACM REMAINS, SAMPLE CONFIRMED, ADDL SAMPLING, ACM INCLUDES:

MISC. SEALANT/ INSULATION SEALANT, BLACK

JAN04

PVS. ACM REMAINS, NO ADDL SAMPLING, NO SIGNIFICANT CHANGES

INSPECT OCT00

ACM INCLUDES

MUDDED FITTING DEBRIS

FLOOR TILE MASTIC

ASBESTOS MANAGER: Billy Parkin 451-5837

Friable ACM(s) identified

Non-friable ACM(s) identified

NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

No friable ACM records found in database

NOTIFICATION OF ACM IN BUILDING

12" BEIGE w/ OLIVE FLOOR TILE AND

ADHESIVE

1,700 SFEAST CENTER MAIN ROOM (OVER

HM21); WEST END ROOM (SEE ALSO

HM04)

10/12/2000

12" BEIGE FLOOR TILE AND ADHESIVE 850 SFEAST END ROOM UNDER HM02; WEST

CENTER ROOM UNDER CARPET (SEE

ALSO HM02)

10/12/2000

9" BROWN FLOOR TILE AND ADHESIVE 215 SFEAST CENTER MAIN ROOM AND

SOUTHWEST STORAGE (UNDER HM02)-

(SEE ALSO HM26 EXT. DEBRIS)

3/31/2010

Friday, March 29, 2019 Page 2 of 8Print Date:

INTERIOR CAULKING, 370 LFWINDOWS THROUGHOUT 3/31/2010

EXTERIOR CAULKING, 425 LFWINDOWS AND DOORS, OUTER/ NEW

AND INNER/ RESIDUAL

3/31/2010

FLOOR TILE AND ADHESIVE, UNDER OTHER 850 SFEAST END ROOM UNDER HM02; WEST

CENTER ROOM UNDER CARPET (SEE

ALSO HM02)

11/29/2007

12" BEIGE w/ OLIVE FLOOR TILE AND

ADHESIVE

1,700 SFEAST CENTER MAIN ROOM (OVER

HM21); WEST END ROOM (SEE ALSO

HM04)

1/7/2004

12" BEIGE FLOOR TILE AND ADHESIVE 850 SFEAST END ROOM UNDER HM02; WEST

CENTER ROOM UNDER CARPET (SEE

ALSO HM02)

1/7/2004

12" BEIGE w/ OLIVE FLOOR TILE AND

ADHESIVE

1,700 SFEAST CENTER MAIN ROOM (OVER

HM21); WEST END ROOM (SEE ALSO

HM04)

11/29/2007

12" BEIGE w/ OLIVE FLOOR TILE AND

ADHESIVE

1,700 SFEAST CENTER MAIN ROOM (OVER

HM21); WEST END ROOM (SEE ALSO

HM04)

3/31/2010

12" BEIGE FLOOR TILE AND ADHESIVE 850 SFEAST END ROOM UNDER HM02; WEST

CENTER ROOM UNDER CARPET;

SOUTHWEST FOYER (SEE ALSO HM02)

3/31/2010

12" BEIGE w/ OLIVE FLOOR TILE AND

ADHESIVE

1,700 SFEAST CENTER MAIN ROOM (OVER

HM21); WEST END ROOM (SEE ALSO

HM04)

4/24/2014

12" BEIGE FLOOR TILE AND ADHESIVE 850 SFEAST END ROOM UNDER HM02; WEST

CENTER ROOM UNDER CARPET (SEE

ALSO HM02)

4/24/2014

9" BROWN FLOOR TILE AND ADHESIVE 215 SFEAST CENTER MAIN ROOM AND

SOUTHWEST STORAGE (UNDER HM02)-

(SEE ALSO HM26 EXT. DEBRIS)

4/24/2014

INTERIOR CAULKING, 370 LFWINDOWS THROUGHOUT 4/24/2014

EXTERIOR CAULKING, 425 LFWINDOWS AND DOORS, OUTER/ NEW

AND INNER/ RESIDUAL

4/24/2014

12" BEIGE w/ OLIVE FLOOR TILE AND

ADHESIVE

1,700 SFEAST CENTER MAIN ROOM (OVER

HM21); WEST END ROOM (SEE ALSO

HM04)

8/25/2016

12" BEIGE FLOOR TILE AND ADHESIVE 850 SFEAST END ROOM UNDER HM02; WEST

CENTER ROOM UNDER CARPET (SEE

ALSO HM02)

8/25/2016

9" BROWN FLOOR TILE AND ADHESIVE 215 SFEAST CENTER MAIN ROOM AND

SOUTHWEST STORAGE (UNDER HM02)-

(SEE ALSO HM26 EXT. DEBRIS)

8/25/2016

INTERIOR CAULKING, 370 LFWINDOWS THROUGHOUT 8/25/2016

EXTERIOR CAULKING, 425 LFWINDOWS AND DOORS, OUTER/ NEW

AND INNER/ RESIDUAL

8/25/2016

Friday, March 29, 2019 Page 3 of 8Print Date:

Tested Non ACM or REMOVED Materials

DESCRIPTION LOCATION Date

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

HEALTH ASPECTS:

Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.

CONDITIONS TO AVOID:

Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos Program Manager.

REPORTS OF DAMAGE:

Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:

ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:

The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the RECORDKEEPING:

CARPET ADHESIVE EAST AND CENTRAL OFFICES,

SOUTHWEST FOYER (OVER FLOOR

TILES)

10/12/2000

DRYWALL AND JOINT MATERIAL INTERIOR WALLS 10/12/2000

MUDDED FITTING DEBRIS ATTIC, WEST END 10/12/2000

WALLBOARD/ SHEATHING ATTIC, EAST AND WEST GABLE ENDS 10/12/2000

ELECTRICAL WRAPPED WIRING ATTIC DEBRIS, ABANDONED

ELECTRICAL

10/12/2000

EXTERIOR SURFACING MATERIAL, STUCCO EXTERIOR PERIMETER FOUNDATION

COATING

11/29/2007

PIPE INSULATION SEALANT EXTERIOR OVERHEAD SOUTHWEST

STEAM LINE w/LAGGING AT ELBOWS

11/29/2007

MISCELLANEOUS SEALANT EAST CENTER INTERIOR WALL,

BLOCK/COLUMN JOINT

3/31/2010

MISCELLANEOUS SEALANT EXTERIOR OVERHEAD SOUTHWEST

STEAM LINE AT METAL JACKET JOINTS

11/29/2007

FIBERGLASS INSULATION SEALANT WEST END STORAGE, WEST STEAM

PIPING

3/31/2010

LAGGING PAPER ON FIBERGLASS WEST END STORAGE, WEST STEAM

PIPING

3/31/2010

FLOOR TILE DEBRIS SOUTH CENTER EXTERIOR, BELIEVED

REMOVED HM21 MATERIAL

3/31/2010

MUDDED FITTING DEBRIS ATTIC, WEST END 11/29/2007

MUDDED FITTING DEBRIS ATTIC, WEST END 3/31/2010

PIPE INSULATION SEALANT EXTERIOR OVERHEAD SOUTHWEST

STEAM LINE w/LAGGING AT ELBOWS

3/31/2010

MISCELLANEOUS SEALANT EXTERIOR OVERHEAD SOUTHWEST

STEAM LINE AT METAL JACKET JOINTS

3/31/2010

DRYWALL AND JOINT MATERIAL INTERIOR WALLS 3/31/2010

MUDDED FITTING DEBRIS ATTIC, WEST END 1/7/2004

Friday, March 29, 2019 Page 4 of 8Print Date:

p j g g py y building.

CAMP LEJEUNE Asbestos Program Manager Phone: (910) 451-5837

Friday, March 29, 2019 Page 5 of 8Print Date:

SAMPLES COLLECTED

Sample Sample Date

HA Sample Location Chr

Amo

Oth

Description

M602-01-00ri03 1/7/200401 N/A 9 9 9MUDDED FITTING

DEBRIS

M602-01-00ri09 3/31/201001 N/A 19 19 19MUDDED FITTING

DEBRIS

M602-01-01 10/12/200001 WEST END OF ATTIC 25 5 0MUDDED FITTING

DEBRIS

M602-01-02 10/12/200001 WEST END OF ATTIC 10 20 0MUDDED FITTING

DEBRIS

M602-01-10 11/29/200701 ATTIC, NW DEBRIS 45 15 0MUDDED FITTING

DEBRIS

M602-02-00ri03 1/7/200402 N/A 9 9 912" BEIGE w/ OLIVE

FLOOR TILE AND

ADHESIVE

M602-02-00ri13 4/24/201402 N/A 9 9 912" BEIGE w/ OLIVE

FLOOR TILE AND

ADHESIVE

M602-02-00ri16 8/25/201602 N/A 9 9 912" BEIGE w/ OLIVE

FLOOR TILE AND

ADHESIVE

M602-02-01 10/12/200002 WEST END RM, SW 6 0 012" BEIGE w/ OLIVE

FLOOR TILE AND

ADHESIVE

M602-02-10 11/29/200702 WEST END OFFICE, SOUTH

CNTR

4 0 012" BEIGE w/ OLIVE

FLOOR TILE AND

ADHESIVE

M602-02-20 3/31/201002 EAST END OFFICE, NW 3 0 012" BEIGE w/ OLIVE

FLOOR TILE AND

ADHESIVE

M602-02-20tem 3/31/201002 EAST END OFFICE, NW 0 0 012" BEIGE w/ OLIVE

FLOOR TILE AND

ADHESIVE

M602-02-21 3/31/201002 EAST CNTR CLASS, NW 3 0 012" BEIGE w/ OLIVE

FLOOR TILE AND

ADHESIVE

M602-02-22 3/31/201002 SOUTH CNTR HEAD, SW 3 0 012" BEIGE w/ OLIVE

FLOOR TILE AND

ADHESIVE

M602-03-01 10/12/200003 SW ENTRY FOYER 0 0 0CARPET ADHESIVE YELLOW

M602-03-02 10/12/200003 WEST CNTR OFFICE, NE 0 0 0CARPET ADHESIVE YELLOW

Friday, March 29, 2019 Page 6 of 8Print Date:

HA Sample Location Chr

Amo

Oth

Description

M602-04-00ri03 1/7/200404 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

M602-04-00ri13 4/24/201404 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

M602-04-00ri16 8/25/201604 N/A 9 9 912" BEIGE FLOOR TILE

AND ADHESIVE

M602-04-01 10/12/200004 SW ENTRY FOYER 5 0 012" BEIGE FLOOR TILE

AND ADHESIVE

M602-04-02 10/12/200004 WEST CNTR OFFICE, NE 10 0 012" BEIGE FLOOR TILE

AND ADHESIVE

M602-04-10 11/29/200704 EAST END OFFICE, SW 4 0 012" BEIGE FLOOR TILE

AND ADHESIVE

M602-04-20 3/31/201004 EAST END OFFICE, NW

(UNDER HM02)

3 0 012" BEIGE FLOOR TILE

AND ADHESIVE

M602-04-20tem 3/31/201004 EAST END OFFICE, NW

(UNDER HM02)

0 0 012" BEIGE FLOOR TILE

AND ADHESIVE

M602-05-01 10/12/200005 SW ENTRY FOYER 0 0 0DRYWALL AND JOINT

MATERIAL

M602-05-02 10/12/200005 EAST CNTR RM, SW STORAGE 0 0 0DRYWALL AND JOINT

MATERIAL

M602-05-03 10/12/200005 CNTR HALL WALL 0 0 0DRYWALL AND JOINT

MATERIAL

M602-05-20 3/31/201005 SW FOYER, WEST WALL 0 0 0DRYWALL AND JOINT

MATERIAL

M602-06-01 10/12/200006 ATTIC, 0 0 0WALLBOARD/

SHEATHING

BROWN

M602-07-01 10/12/200007 ATTIC, EAST CNTR 0 0 0ELECTRICAL WRAPPED

WIRING

M602-10-10 11/29/200710 EAST END, SOUTH 0 0 0EXTERIOR SURFACING

MATERIAL, STUCCO

WHITE

M602-10-11 11/29/200710 WEST END, SOUTH 0 0 0EXTERIOR SURFACING

MATERIAL, STUCCO

WHITE

M602-11-00ri09 3/31/201011 N/A 9 9 9PIPE INSULATION

SEALANT

BLACK

M602-11-10 11/29/200711 SW EXT. OVHD 5 0 0PIPE INSULATION

SEALANT

BLACK

M602-12-00ri09 3/31/201012 N/A 9 9 9MISCELLANEOUS

SEALANT

BLACK

Friday, March 29, 2019 Page 7 of 8Print Date:

HA Sample Location Chr

Amo

Oth

Description

M602-12-10 11/29/200712 SW EXT. OVHD 6 0 0MISCELLANEOUS

SEALANT

BLACK

M602-20-20 3/31/201020 EAST CNTR RM, EAST CNTR 0 0 0MISCELLANEOUS

SEALANT

BEIGE

M602-21-00ri13 4/24/201421 N/A 9 9 99" BROWN FLOOR TILE

AND ADHESIVE

M602-21-00ri16 8/25/201621 N/A 9 9 99" BROWN FLOOR TILE

AND ADHESIVE

M602-21-20 3/31/201021 EAST CNTR RM, SE 6 0 09" BROWN FLOOR TILE

AND ADHESIVE

M602-21-20tem 3/31/201021 EAST CNTR RM, SE 6.84 0 09" BROWN FLOOR TILE

AND ADHESIVE

M602-22-00ri13 4/24/201422 N/A 9 9 9INTERIOR CAULKING, WHITE

M602-22-00ri16 8/25/201622 N/A 9 9 9INTERIOR CAULKING, WHITE

M602-22-20 3/31/201022 SOUTH CNTR HEAD, SOUTH

WINDOW

4 0 0INTERIOR CAULKING, WHITE

M602-22-21 3/31/201022 WEST STORAGE, WEST CNTR

WINDOW

3 0 0INTERIOR CAULKING, WHITE

M602-23-20 3/31/201023 WEST END RM, WEST CNTR 0 0 0FIBERGLASS

INSULATION SEALANT

GRAY

M602-24-20 3/31/201024 WEST END RM, WEST CNTR 0 0 0LAGGING PAPER ON

FIBERGLASS

M602-25-00ri13 4/24/201425 N/A 9 9 9EXTERIOR CAULKING, WHITE

M602-25-00ri16 8/25/201625 N/A 9 9 9EXTERIOR CAULKING, WHITE

M602-25-20 3/31/201025 NORTHSIDE, EAST WINDOW 3 0 0EXTERIOR CAULKING, WHITE

M602-25-21 3/31/201025 NORTHSIDE, EAST WINDOW 0 0 0EXTERIOR CAULKING, WHITE

M602-25-22 3/31/201025 SOUTHSIDE, WEST WINDOW 3 0 0EXTERIOR CAULKING, WHITE

M602-25-23 3/31/201025 SOUTHSIDE, WEST WINDOW 0 0 0EXTERIOR CAULKING, WHITE

M602-25-24 3/31/201025 SOUTHSIDE, WEST DOORS 4 0 0EXTERIOR CAULKING, WHITE

M602-25-25 3/31/201025 SOUTHSIDE, WEST DOORS 0 0 0EXTERIOR CAULKING, WHITE

M602-26-20 3/31/201026 SOUTH EXT., CNTR WEST 5 0 0FLOOR TILE DEBRIS BROWN

Friday, March 29, 2019 Page 8 of 8Print Date:

APPENDIX 4

XRF FIELD DATA SHEETS

P A

G E

_1

O F_

2_

X R

F

LB

P T

ES

TI

N G

D A

TA

S

H

EE

T

O

JE

C T

N A

M E/

A D

D R

ES

S/

U N

IT

N

O

B ld g.

, C am p J o h n so n , J ac ks o n vi lle

, N C

O

JE

C

T N

D

TE

Ju n e

F M

O D

EL

/S

ER

IA

L N

O

IN

N

O V

X L

B P

IN

SP

EC

TO

R N

A M

E/ N

O

D eW it t

W h it te n , N

C R

A

SI

G

N A

TU

E

SA

M

P

LE

SU

ST

R

A

TE

C

O M

P O

N

EN

T C

O

LO

R

TE

ST

L O

C A

TI

N

V

EL

F R

EA

D

U

IT

S3 C

LA

SS

IF

IC

A

TI

O N la y

B lo ck

W al l T

Se e

Fi gu re

1st

1.

m g/ cm in d o w s ill

Se e

Fi gu

0.

cm d o w a p ro n e

Fi gu

.0 cm y

B lo l B k Se e Fi gu cm d o w e

Fi gu cm d o w a p e

Fi gu cm ve rh ea d b ea e Fi gu cm ei lin g e Fi gu cm o lu e

Fi gu cm lu e

Fi gu cm l T

Se e

Fi gu cm l T

Se e

Fi gu cm lu e

Fi gu cm d o w e

Fi gu cm d o w a p e

Fi gu cm l T

Se e

Fi gu cm lu e

Fi gu cm lu

Fi gu cm lu

Fi gu cm o r ca si n g T

Se e

Fi gu cm

M m et

W

W h it ed m g/ cm m ill ig ra m s/ sq u ar e ce n ti m er

N

N eg at iv w o d

B lu

G en

P o si ti d ry w l

Y

Ye llo w

Ta

B ri k

B r

B ro

C o n cr

G ra y

O ff -w h

U

C o n cr et e M as o n ry

U

O ra ge

P

P la st

P u rp le

C ar

G E

_2

O F_

2_

F

LB

P T

ES

TI

N G

D A

TA

S

H

EE

O

JE

C T

N A

M E/

A D

D R

ES

S/

U N

IT

N ld g.

, C am p J o h n so n , J ac ks o n vi lle

, N

O

JE

C

T N

TE

Ju n e

F M

O D

EL

/S

ER

IA

L N

O

IN

N

O V

X L

B P

SP

EC

TO

R N

A M

E/ N

O

D eW it t

W h it te n , N

C R

A

SI

N A

TU

E

SA

P

SU

ST

R

A

TE

C

O M

P O

N

EN

T C

O

LO

R

TE

ST

L O

C A

TI

EL

F R

EA

D

U

IT

S3 C

LA

SS

IF

IC

A

TI

O N o r T

Se e

Fi gu cm d o w e

Fi gu cm d o w s u rr o u e Fi gu cm o r ca si n g B k Se e Fi gu cm

St u cc l T

Se e

Fi gu cm

Fa sc ia e

Fi gu cm o r su rr o u e Fi gu cm o r fr am

Fi gu cm o r T

Se e

Fi gu cm ab e

Fi gu cm yl ab le f as ci a

T Se e Fi gu cm l T

Se e

Fi gu cm d o w a p e

Fi gu cm d o w s u rr o u e Fi gu cm d o w a p e

Fi gu cm d o w s u rr o u e Fi gu cm l T

Se e

Fi gu cm

M m

W

W h ed m g/ cm m ill ig ra m s/ sq u ar e ce n ti m

N

N eg at iv w o

B lu

G en

P o si ti d ry w l

Y

Ye llo

Ta

B ri

B

B ro

C o n cr

G ra y

O ff -w h

U

C o n cr et e M as o n ry

U

O ra ge

P

P la st

P u rp

C ar

File details come from the government source that posted it. Updated .