SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 38 PAGES
Fire Station Repairs
01 14 00 SD-01 Preconstruction Submittals
1.3.1.1 GList of Contact Personnel
01 20 00.05 20 SD-01 Preconstruction Submittals
1.3 GEarned Value Report
01 30 00.05 20 SD-01 Preconstruction Submittals
1.3Insurance
1.9 GSalvage Plan
01 31 19.05 20 SD-01 Preconstruction Submittals
1.3.2 GDesign Submittal Packaging
1.5 GPerformance Assessment Plan
(PAP)
1.4.2.1 GCDW Facilitator Experience
Resume
1.4.3.1 GCDW Preliminary Concept
Design
1.4.3.2 GCDW Basis of Design with Cost
Estimate
1.4.2.4 GCDW Concept Design Report
01 31 50 SD-11 Closeout Submittals
1.2Interim DD-1354, Transfer &
Acceptance of Military Real
Property
01 32 16 SD-01 Preconstruction Submittals
1.2Construction schedule
1.3Equipment delivery schedule
01 32 17.00 20 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 38 PAGES
01 32 17.00 20 1.9 GDesignated Project Scheduler
1.2.2.1 GBaseline NAS
1.2.2.2 GConstruction Baseline NAS
SD-07 Certificates
1.4.1 GMonthly Network Analysis
Updates
SD-11 Closeout Submittals
1.4.2 GAs-Built Schedule
01 33 00.05 20 SD-01 Preconstruction Submittals
1.3.1 GSubmittal Register
1.3.1 GSubmittal Register
1.4.7 GSubmittal Register
1.4.7 GSubmittal Register
01 33 10.05 20 SD-01 Preconstruction Submittals
1.5.5 GSubmittal Register
1.11Updated Draft Dd Form 1354
SD-05 Design Data
1.7 GDesign Drawings
1.8 GSpecifications
1.9 GBasis of Design
2.1 GDesign Submittals
SD-11 Closeout Submittals
1.10 GRecord Documents
1.11 GPreliminary Interim DD Form
1.11 GUpdated Interim Dd Form 1354
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 38 PAGES
01 33 10.05 20 1.11 GFinal Dd Form 1354
01 33 29.05 20 SD-01 Preconstruction Submittals
1.5.4 GPreliminary High Performance
and Sustainable Building Checklist
1.5.2Sustainability Action Plan
1.5.4 GPreliminary Sustainability
eNotebook
SD-05 Design Data
1.5.4 GFinal Design High Performance
and Sustainable Building Checklist
1.5.4 GFinal Design Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.4 GFinal High Performance and
Sustainable Building Checklist
1.5.4 GFinal Sustainability eNotebook
1.5.4 GAmended Final Sustainability
eNotebook
1.5.4 GAmended Final High
Performance and Sustainable
Building Checklist
01 35 26.05 20 SD-01 Preconstruction Submittals
1.8.1.1 GAPP - Pre-Design Submittal
1.7.1.1 GAccident Prevention Plan
1.8.1.2 GAPP - Pre-Construction Submittal
1.9 GActivity Hazard Analysis (AHA)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 38 PAGES
01 35 26.05 20 1.7.1.4 GProof of Qualification for Crane
Operators
1.2.18 GTraffic Control Plan
1.18.2.1 GStandard Hand Signals
SD-06 Test Reports
1.4Monthly Exposure Reports
1.13Notifications and Reports
1.13.2 GAccident Reports
1.13.3Crane Reports
3.9.2 GArc Flash Risk/Hazard Analysis
SD-07 Certificates
1.7.1.4Crane Operators/Riggers
1.8.3.2 GStandard Lift Plan
1.8.3.3 GCritical Lift Plan
1.8.3.3 GNaval Architecture Analysis
1.10.1Confined Space Entry Permit
1.10.1Hot Work Permit
3.9.2 GArc Flash Risk/Hazard Analysis
1.7.2.1 GContractor Electrical Energized
Work Permit
1.5 GContractor Safety Self-Evaluation
Checklist
1.13.4Certificate of Compliance
01 45 00.05 20 SD-01 Preconstruction Submittals
1.4.3 GDesign Quality Control (DQC)
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 38 PAGES
01 45 00.05 20 1.4.3 GConstruction Quality Control
(CQC) Plan
1.11 GIndoor Air Quality (IAQ)
Management Plan
1.4.4 GCommissioning Plan
SD-05 Design Data
1.5.2 GDesign Quality Control
Documentation
SD-07 Certificates
1.5.5.1 GPreliminary Inspections and Final
Acceptance Testing
1.5.5.1 GFinal Life Safety/Fire Protection
Certification
1.5.5.2 GICC IBC Special Inspections
Certification
SD-11 Closeout Submittals
1.4.5 GSummary Commissioning Report
01 45 35.05 20 SD-01 Preconstruction Submittals
1.3.12 GStatement of Special Inspections
1.3.14 GStructural Observations
1.6.1 GSIOR
1.6.1 GSpecial Inspections Project
Manual
SD-06 Test Reports
1.6.1Daily Reports
1.6.1Biweekly Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 38 PAGES
01 45 35.05 20 SD-07 Certificates
1.2.1Certified Fabrication Plant
1.2.1Steel Truss Plant Quality
Assurance
1.2.1Steel Joist Institute Membership
1.3.8 GSpecial Inspector of Record
1.3.5 GSpecial Inspector
SD-11 Closeout Submittals
1.6.1Interim Final Report of Special
Inspections
1.6.1 GComprehensive Final Report of
Special Inspections
1.6.4 GFinal Report of Structural
Observations
01 50 00.05 20 SD-01 Preconstruction Submittals
1.10.1.1 GTraffic Control Plan
2.1Backflow Preventers
SD-06 Test Reports
3.3 GBackflow Preventer Tests
SD-07 Certificates
1.7 GBackflow Tester Certification
1.4Backflow Preventers Certificate
01 57 19 SD-01 Preconstruction Submittals
1.7.1Preconstruction Survey
1.13 GSolid Waste Management Permit
1.7.2 GRegulatory Notifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 38 PAGES
01 57 19 1.8 GEnvironmental Protection Plan
3.8.1.2 GStormwater Notice of Intent
1.8.9.1 GDirt and Dust Control Plan
1.7.5 GEmployee Training Records
1.7.4 GEnvironmental Manager
Qualifications
SD-06 Test Reports
3.13.1.1.2Laboratory Analysis
3.8.1.3Inspection Reports
3.13.2.1 GSolid Waste Management Report
1.8.9.5Abrasion blasting
SD-07 Certificates
1.7.5 GEmployee Training Records
1.5.1.2 GECATTS Certificate Of
Completion
1.7.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.8.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.8.1.5 GStormwater Notice of Termination
3.13.1 GWaste Determination
Documentation
3.13.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 38 PAGES
01 57 19 1.7.5 GAssembled Employee Training
Records
1.13 GSolid Waste Management Permit
3.13.2.1 GSolid Waste Management Report
3.14.1 GContractor Hazardous Material
Inventory Log
3.13.3.1 GHazardous Waste/Debris
Management
1.7.2 GRegulatory Notifications
3.13.2.1 GSales Documentation
3.13.2.1Contractor Certification
01 58 00 SD-02 Shop Drawings
1.4.1 GPreliminary Drawing Indicating
Layout And Text Content
01 59 00 SD-03 Product Data
2.1Trailer
01 60 00 SD-07 Certificates
1.2.1Certificate of North Carolina
Licensed Applicator
SD-11 Closeout Submittals
3.2Field Pesticide/Herbicide
Management Record Form
01 74 19.05 20 SD-01 Preconstruction Submittals
3.1 GWaste Management Plan
SD-11 Closeout Submittals
3.2 SRecords
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 38 PAGES
01 78 00 SD-03 Product Data
1.6.1Warranty Management Plan
1.6.4Warranty Tags
3.4Final Cleaning
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.6.1Instructions
SD-10 Operation and Maintenance
Data
3.3 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.2 GRecord Drawings
1.6.1As-Built Record of Equipment and Materials
3.5 GInterim DD FORM 1354
3.5 GChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance
Data
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 38 PAGES
01 78 24.00 20 SD-11 Closeout Submittals
1.4.1 GeOMSI, Progress Submittal
1.4.2 GeOMSI, Prefinal Submittal
1.4.3 GeOMSI, Final Submittal
01 78 30.00 22 SD-11 Closeout Submittals
1.3.6 GGIS Data Deliverables
01 91 00.15 SD-01 Preconstruction Submittals
1.8 GCommissioning Firm
1.8.1 GLead Commissioning Specialist
1.8.2 GTechnical Commissioning
Specialists
SD-05 Design Data
3.1.2 GDesign Phase Commissioning
Plan
SD-06 Test Reports
3.1.3 GDesign Review Report
3.2.2.1 GInterim Construction Phase
Commissioning Plan
3.2.2.2 GFinal Construction Phase
Commissioning Plan
3.2.4.2 GPre-Functional Checklists
1.10Issues Log
3.3 GCommissioning Report
SD-07 Certificates
1.11 GCertificate of Readiness
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 38 PAGES
01 91 00.15 SD-10 Operation and Maintenance
Data
3.2.5 GTraining Plan
3.2.5 GTraining Attendance Rosters
3.2.6 GSystems Manual
SD-11 Closeout Submittals
3.3 SFinal Commissioning Report
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
3.1.17 GDemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.2.1Demolition Plan
3.1.17Demolition Plan
02 82 16 SD-06 Test Reports
1.5.2Air sampling results
1.5.3Pressure differential recordings for local exhaust system
3.3.3.2Clearance sampling
SD-07 Certificates
1.5.1Asbestos hazard abatement plan
SD-11 Closeout Submittals
1.5.4Asbestos Waste Shipment
Record N.C. (DHHS-HHCU) Form
1.5.5Daily log
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 38 PAGES
02 82 16 1.5.6North Carolina permit
1.5.7Modifications to the North
Carolina permit
1.5.8Asbestos Inspection Reporting
Form
02 82 33.12 SD-03 Product Data
1.5.4Vacuum filters
1.5.1Respirators
SD-06 Test Reports
1.4.4Monitoring Results
SD-07 Certificates
1.4.1Qualifications of CIH
1.4.2Testing laboratory
1.5.3Rental equipment notification
1.4.3Preparation of Surfaces Coated with Lead-Contaminated Paint
Work Plan
1.3.4Respiratory protection program
1.3.5Hazard communication program
3.4disposal facility
1.3.6Hazardous waste management plan
1.5.4Vacuum filters
SD-11 Closeout Submittals
3.4manifest
1.3.1medical examinations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 38 PAGES
02 82 33.12 1.3.3.1training certification
02 82 33.13 SD-03 Product Data
1.6.4Vacuum filters
1.6.1Respirators
SD-06 Test Reports
1.4.4Monitoring Results
SD-07 Certificates
1.4.1Qualifications of CIH
1.4.2Testing laboratory
1.4.3Materials coated with lead-containing paint removal work plan
1.6.3Rental equipment notification
1.3.8work plan
1.3.4Respiratory protection program
1.3.5Hazard communication program
3.4.4disposal
1.3.6Hazardous waste management plan
1.6.4Vacuum filters
SD-11 Closeout Submittals
3.4.4disposal
1.3.1medical examinations
1.3.3.1training certification
07 61 15.00 20 SD-02 Shop Drawings
2.1 GRoofing panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 38 PAGES
07 61 15.00 20 2.3 GGutter / Downspout System
SD-03 Product Data
2.1 GRoofing panels
2.2 GAttachment clips
2.3.1Closures
2.3Accessories
2.4Underlayment
2.3Fasteners
3.2Gaskets
2.3.2.1Sealing
3.2.2Compounds
1.8 Gwarranty
2.3.4Sealant Tape
SD-04 Samples
2.1Roofing panels
2.3Accessories
SD-05 Design Data
1.5 GLoad calculations
SD-06 Test Reports
1.3.2.8Leakage Test Report
1.3.2.9Wind Uplift Test Report
2.1.1.2Factory Finish and Color
Performance Requirements
2.5 GPanel finish
3.5 GManufacturer's field inspection
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 38 PAGES
07 61 15.00 20 1.6.2Technical representative
1.6.3Qualification of Installer
2.1.1.5Coil stock
SD-08 Manufacturer’s Instructions
2.3.3Sealant
3.3Installation
SD-11 Closeout Submittals
3.7Information card
08 91 00 SD-02 Shop Drawings
1.4Wall louvers
1.5Wall louvers
SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.4Wall louvers
1.5Wall louvers
09 67 23.13 SD-03 Product Data
1.2.1Manufacturer's Catalog Data
SD-04 Samples
1.5.2Hardboard Mounted
SD-05 Design Data
1.2.2Design Mix Data
SD-07 Certificates
1.5.1Listing of Product Installations
1.5Referenced Standards
Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 38 PAGES
09 67 23.13 SD-11 Closeout Submittals
1.6Warranty
10 14 00.20 SD-02 Shop Drawings
1.3.2Detail Drawings
SD-03 Product Data
3.1Installation
1.5Warranty
SD-04 Samples
1.3.1Interior Signage
SD-10 Operation and Maintenance
Data
3.1Approved Manufacturer's
Instructions
3.1.2Protection and Cleaning
10 22 13 SD-02 Shop Drawings
1.4Wire Mesh Partitions
SD-03 Product Data
1.4Wire Mesh Partitions
22 00 00 SD-03 Product Data
2.1 SRecycled Content for Steel Pipe
2.4Fixtures
2.4.2 GFlush valve water closets
2.4.2 SWaterSense Label for Flush
Valve Water Closet
2.4.3 GFlush valve urinals
2.4.3 SWaterSense Label for Urinal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 38 PAGES
22 00 00 2.4.4 SWaterSense Label for Urinal
2.4.5 GWall hung lavatories
2.4.6 GCountertop lavatories
2.4.5 SWaterSense Label for Lavatory
Faucet
2.4.6 SWaterSense Label for Lavatory
Faucet
2.4.7Kitchen sinks
2.4.8Mop sinks
2.4.12Mop sinks
2.4.9 GDrinking-water coolers
2.4.9 SEnergy Star Label for
Drinking-Water Cooler
2.4.10 SEnergy Star Label for
Drinking-Water Cooler
2.9 GWater heaters
2.9 SEnergy Star Label for Gas
Storage Water Heater
2.10 GPumps
3.6.1.1 GBackflow prevention assemblies
2.6.2 GShower Faucets
2.6.2 SWaterSense Label for Shower
Faucets
2.3.1Wall Faucets
SD-06 Test Reports
3.6Tests, Flushing and Disinfection
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 38 PAGES
22 00 00 3.6.1.1 GTest of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
23 03 00.00 20 SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment for
Motors
2.1.2 SReduce Volatile Organic
Compounds (VOC)
23 05 93 SD-01 Preconstruction Submittals
1.3.2Records of Existing Conditions
1.5.1Independent TAB Agency and
Personnel Qualifications
1.5.3.2 GTAB Design Review Report
SD-02 Shop Drawings
1.3.2 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.1.3 GTAB Related HVAC Submittals
SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 38 PAGES
23 05 93 1.5.3.3Prerequisite HVAC Work
Checkout List
1.5.3.3Prerequisite HVAC Work
Checkout List
1.5.3.3Prerequisite HVAC Work
Checkout List
3.7 GProportional Balancing
3.7 GSeason 1
3.7 GSeason 2
SD-07 Certificates
1.5.1Independent TAB Agency and
Personnel Qualifications
1.5.3.2DALT and TAB Submittal and
Work Schedule
1.5.3.3TAB Pre-Field Engineering
Report
1.5.5Instrument Calibration
Certificates
3.7DALT and TAB Procedures
Summary
3.7Completed Pre-Final DALT Work
Checklist
3.3.2Advance Notice of Pre-Final
DALT Field Work
3.7Proportional Balancing
3.7Season 1
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 38 PAGES
23 05 93 3.7Season 2
23 07 00 SD-03 Product Data
2.1Piping insulation
2.1.8Piping insulation finishes
2.2Heating, ventilating, and air conditioning systems insulation
2.1.1 SRecycled content for insulation
materials
2.2.3Duct insulation finishes
2.4Accessory materials
2.3Adhesives, sealants, and coating compounds
SD-07 Certificates
2.3 SIndoor air quality for adhesives
23 09 23.13 SD-02 Shop Drawings
1.4.1.1 GControl System Drawings Title
Sheet
1.4.1.2 GList of I/O Points
1.4.1.3 GControl System Components List
1.4.1.4 GControl System Schematics
1.4.1.5 GHVAC Equipment Control Ladder
Diagrams
1.4.1.6 GComponent Wiring Diagrams
1.4.1.7 GTerminal Strip Diagrams
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 38 PAGES
23 09 23.13 1.4.1.8 GBACnet Communication
Architecture Schematic(Network
Riser)
1.4.1.4 GSequence of Operations
2.1.3.13 GControl Panel Layout
SD-03 Product Data
2.1.3 GDirect Digital Controllers
2.1.3.12 GBACnet Gateways
2.1.6 GNotebook Computer Software
2.1.5 GNotebook Computer
2.2 GSensors and Input Hardware
2.3 GOutput Hardware
2.4.2 GSurge and Transient Protection
2.6 GIndicators
2.5.1Duct smoke detectors
2.7 GVariable Frequency (Motor)
Drives
SD-05 Design Data
3.5.2 GPerformance Verification Testing
Plan
SD-06 Test Reports
3.5.11 GPerformance Verification Testing
Report
3.5.12 GBus Waveform Report
SD-07 Certificates
1.6.6 GContractor's Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 38 PAGES
23 09 23.13 3.6 GContractor's Training
Certifications
SD-10 Operation and Maintenance
Data
1.4 GBACnet Direct Digital Control
Systems
3.4 GControls System Operators
Manuals
2.7.2 GVFD Service Manuals
SD-11 Closeout Submittals
3.6.1 GTraining Documentation
23 35 00.00 10 SD-02 Shop Drawings
1.4.1 GDetail Drawings
3.4Exhaust System Installation
SD-03 Product Data
1.4.2Related Submittals
2.4Ductwork Components
2.1 GMaterials and Equipment
1.6Spare Parts
3.5Field Instructions
3.6Final Acceptance Tests
3.5Onsite Training
1.4.2Exhaust System Specialist
SD-06 Test Reports
3.6Final Acceptance Tests
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 38 PAGES
23 35 00.00 10 3.3Inspection
SD-10 Operation and Maintenance
Data
1.2Exhaust System
3.5Operation and Maintenance
Manuals
23 73 33 SD-03 Product Data
2.1.4 GSplit-system heat pumps
2.1.2 SEnergy Star Label for Heat Pump
Product
2.1.6Exhaust fans
2.1.7Exhaust fans
2.3.7Fire dampers
2.5.9Expansion tanks
2.6Heat tape
2.5.1Pipe hangers and supports
2.5.7Flexible pipe connectors
2.3.3Dampers
2.3.4Diffusers, registers, and grilles
2.3.5Outside air intake louvers
2.3.8Flexible round ducts
2.4.6Valves
2.3 SIndoor Air Quality for Duct
Sealants
2.4Pipe and fittings
2.1.1 GDedicated Outside Air Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 38 PAGES
23 73 33 2.1.2 GMini-Split Heat Pump Systems
2.1.3 GGas-Fired Unit Heater
2.1.5Electric Unit Heaters
2.5.10Air Separation And Sediment
Removal Tanks
SD-06 Test Reports
2.1.1 GDedicated Outside Air Systems
SD-08 Manufacturer’s Instructions
1.3.1Installation manual
SD-10 Operation and Maintenance
Data
2.1.1 GDedicated Outside Air Systems
2.1.2Mini-Split Heat Pump Systems
2.1.4Split-system heat pumps
2.1.5Electric Unit heaters
2.1.6Exhaust fans
2.1.7Exhaust fans
2.3.7Fire dampers
SD-11 Closeout Submittals
2.1.1 GDedicated Outside Air Systems
1.3.2Air filter inventory
3.1.1 SIndoor Air Quality During
Construction
26 08 00 SD-06 Test Reports
3.1Acceptance tests and inspections
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 38 PAGES
26 08 00 1.4.1Qualifications
1.4.3Acceptance test and inspections procedure
26 12 19.10 SD-02 Shop Drawings
1.4.1 GPad-mounted transformer
drawings
SD-03 Product Data
2.2 GPad-mounted transformers
SD-06 Test Reports
3.5.1Acceptance checks and tests
SD-07 Certificates
1.4.2Transformer losses
SD-09 Manufacturer’s Field
Reports
2.6.2design tests
2.6.3routine and other tests
SD-10 Operation and Maintenance
Data
1.5.1 GTransformer(s)
SD-11 Closeout Submittals
2.6.1Transformer test schedule
26 20 00 SD-02 Shop Drawings
2.11 GPanelboards
2.14 GTransformers
SD-03 Product Data
2.10Receptacles
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 38 PAGES
26 20 00 2.11.2 GCircuit breakers
2.9Switches
2.14 GTransformers
2.12 GEnclosed circuit breakers
2.15Motor controllers
2.16Manual motor starters
2.22 GSurge protective devices
SD-06 Test Reports
3.2.2600-volt wiring test
3.2.5Grounding system test
3.2.3Transformer tests
3.2.4Ground-fault receptacle test
SD-07 Certificates
2.13Fuses
SD-09 Manufacturer’s Field
Reports
2.23.1Transformer factory tests
SD-10 Operation and Maintenance
Data
1.5.1 GElectrical Systems
26 24 13 SD-02 Shop Drawings
1.5.2 GSwitchboard Drawings
SD-03 Product Data
2.2 GSwitchboard
SD-06 Test Reports
2.5.2Switchboard Design Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 38 PAGES
26 24 13 2.5.3Switchboard Production Tests
3.5.1Acceptance Checks and Tests
SD-10 Operation and Maintenance
Data
1.6.1 GSwitchboard Operation and
Maintenance
SD-11 Closeout Submittals
1.6.2Assembled Operation and
Maintenance Manuals
2.5.1Equipment Test Schedule
3.5 GRequired Settings
2.7 GService Entrance Available Fault
Current Label
26 27 14.00 20 SD-02 Shop Drawings
1.4.1 G SInstallation Drawings
SD-03 Product Data
2.1.4 G SElectricity meters
2.1.3 GCurrent transformer
2.1.2 GPotential transformer
2.2 Gcommunications
3.1.2 GConfiguration Software
SD-06 Test Reports
3.2.1Acceptance checks and tests
3.2.2System functional verification
3.2.1Building meter installation sheet, per building
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 38 PAGES
26 27 14.00 20 3.2.1Completed meter installation schedule
3.2.1Completed meter data schedule
2.1.1Meter configuration template
3.2.1 GMeter configuration report
SD-10 Operation and Maintenance
Data
1.5.1 GElectricity Meters and
Accessories
SD-11 Closeout Submittals
3.2.2System functional verification
26 29 23 SD-02 Shop Drawings
1.5.1Schematic diagrams
1.5.2Interconnecting diagrams
SD-03 Product Data
2.1 GVariable frequency drives
2.3Wires and cables
1.5.3Equipment schedule
SD-06 Test Reports
3.2.1VFD Test
3.2.2Performance Verification Tests
SD-08 Manufacturer’s Instructions
1.5.4Installation instructions
SD-10 Operation and Maintenance
Data
2.1 GVariable frequency drives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 38 PAGES
26 32 13 SD-02 Shop Drawings
1.5.1.1 GEngine-Generator set and
auxiliary equipment
SD-03 Product Data
1.3.1 GEngine-generator set data
1.3.2Engine-generator set efficiencies
1.3.3Diesel engine data
1.3.4Generator and exciter data
2.1Diesel engine-generator set
2.2Auxiliary systems and equipment
SD-05 Design Data
1.3.5 GCapacity calculations for
engine-generator set
1.3.6Calculations for brake mean effective pressure
1.3.7Torsional vibration stress analysis computations
1.3.8Capacity calculations for batteries
SD-06 Test Reports
3.5.1Acceptance checks and tests
3.5.2Functional acceptance tests
3.4.4Functional acceptance test procedure
SD-07 Certificates
1.5.2Vibration isolation system
1.5.3Fuel system
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 38 PAGES
26 32 13 3.3Start-up engineer
3.6.1Instructor's
SD-09 Manufacturer’s Field
Reports
2.6.1Engine tests
2.6.2Generator tests
2.6.3Assembled engine-generator set tests
SD-10 Operation and Maintenance
Data
2.1 GDiesel engine-generator set
2.2 GAuxiliary systems and equipment
3.4.3 GPreliminary assembled operation
and maintenance manuals
SD-11 Closeout Submittals
1.8.2 GPosted operating instructions
3.6.2Training plan
26 36 23.00 20 SD-02 Shop Drawings
1.4.2 GAutomatic Transfer Switch
Drawings
SD-03 Product Data
2.1 GAutomatic Transfer Switches
SD-06 Test Reports
3.3.1Acceptance Checks and Tests
3.3.2Functional Acceptance Tests
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 38 PAGES
26 36 23.00 20 1.4.1Proof of Listing
SD-10 Operation and Maintenance
Data
2.1 GAutomatic Transfer Switches
26 41 00 SD-02 Shop Drawings
1.4.1.1 GOverall lightning protection
system
1.4.1.2 GEach major component
SD-06 Test Reports
1.4.3 GLightning Protection and
Grounding System Test Plan
3.2.1 GLightning Protection and
Grounding System Test
SD-07 Certificates
1.2.3 GLightning Protection System
Installers Documentation
1.4.2 GComponent UL Listed and
Labeled
1.4.4 GLightning protection system
inspection certificate
3.1.1 GRoof manufacturer's warranty
26 51 00.00 22 SD-01 Preconstruction Submittals
1.7.1LED Luminaire Warranty
SD-02 Shop Drawings
1.6.1.1 GLED Luminaire drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 38 PAGES
26 51 00.00 22 2.1 GLED Luminaires
2.5 GLighting contactor
2.6 GTime switch
2.7 GPhotocell
2.8 GExit signs
2.9 GEmergency lighting equipment
2.11 GOccupancy sensors
SD-06 Test Reports
1.6.2LED Luminaire - IESNA LM-79
Test Report
1.6.3LED Light Source - IESNA LM-80
Test Report
3.3Operating test
SD-07 Certificates
1.7.1Luminaire Useful Life Certificate
SD-10 Operation and Maintenance
Data
1.4.1 GLighting Control System
26 56 00 SD-01 Preconstruction Submittals
1.5.2 GPhotometric Plan
1.7.1LED Luminaire Warranty
SD-02 Shop Drawings
1.5.1.1 GLuminaire drawings
1.5.1.2 GPoles
SD-03 Product Data
2.2 GLED Luminaires
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 38 PAGES
26 56 00 2.2.2 GLuminaire Light Sources
2.2.3 GLuminaire Power Supply Units
(Drivers)
2.3.1 GPhotocell
2.4.1 GAluminum poles
2.5Brackets
SD-05 Design Data
1.5.3Design Data for luminaires
SD-06 Test Reports
1.5.4LED Luminaire - IES LM-79 Test
Report
1.5.5LED Light Source - IES LM-80
Test Report
3.2Operating test
SD-07 Certificates
1.7.1Luminaire Useful Life Certificate
27 10 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications drawings
1.6.1.2 GTelecommunications Space
Drawings
SD-03 Product Data
2.4 GTelecommunications cabling
2.5.6 GPatch panels
2.6 GTelecommunications
outlet/connector assemblies
2.5.2 GEquipment support frame
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 38 PAGES
27 10 00 2.5.3 GConnector blocks
SD-06 Test Reports
3.5.1 GTelecommunications cabling
testing
SD-07 Certificates
1.6.2.1 GTelecommunications Contractor
1.6.2.2 GKey Personnel
1.6.2.3 GManufacturer Qualifications
1.6.3 GTest plan
SD-09 Manufacturer’s Field
Reports
2.13.1 GFactory reel tests
SD-10 Operation and Maintenance
Data
1.10.1 GTelecommunications cabling and
pathway system
SD-11 Closeout Submittals
1.10.2 GRecord Documentation
27 54 00.00 20 SD-02 Shop Drawings
1.6.1 Gwiring diagrams and installation
details
1.4.4 Gsystem components
SD-03 Product Data
2.2.2 GAttenuators
2.3.1 GAmplifiers
2.3.2 GCables
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 38 PAGES
27 54 00.00 20 2.3.3 GTerminators
2.3.4 GSplitters/combiners
2.3.5 GLine Taps
2.3.6 GOutlets
2.3.7 GConnectors
2.3.8 GTilt compensator
2.4.1 GGrounding block
SD-05 Design Data
1.6.2CATV System Loss Calculations
SD-06 Test Reports
1.6.3Operational test plan
1.6.4Operational test procedures
3.2.1System pretest
3.2.2Acceptance tests
SD-08 Manufacturer’s Instructions
1.6.5Connector Installation
33 71 01 SD-03 Product Data
2.6 GConductors
2.5 GInsulators
2.2.1 GWood Poles
2.12 GCutouts
2.11 GSurge arresters
2.7Guy strand
2.9Anchors
SD-06 Test Reports
1.4.2Field Test Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 38 PAGES
33 71 01 3.2Field Quality Control
1.4.1Ground resistance test reports
SD-07 Certificates
2.2.1Wood poles
2.3.1Composite crossarms
33 71 02 SD-03 Product Data
2.5 GMedium voltage cable
2.7 GMedium voltage cable joints
2.6 GMedium voltage cable
terminations
2.12 GPrecast concrete structures
2.12.2 GManhole frames and covers
2.12.3 GHandhole frames and covers
2.12.4 GComposite/fiberglass handholes
2.13 GCable supports
SD-06 Test Reports
2.15.1Arc-proofing test
2.15.1Arc-proofing test
2.15.2Medium voltage cable qualification and production tests
3.14.1Field Acceptance Checks and
Tests
3.3Cable Installation Plan and
Procedure
SD-07 Certificates
1.4.1Cable splicer/terminator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 38 PAGES
33 71 02 1.4.2Cable Installer Qualifications
33 82 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications Outside
Plant
1.6.1.2 GTelecommunications Entrance
Facility Drawings
SD-03 Product Data
2.8 GWire and cable
2.5 GCable splices, and connectors
2.3 GClosures
2.2.1 GBuilding protector assemblies
2.2.2 GProtector modules
2.4 GCross-connect terminal cabinets
1.8.2 GSpare Parts
SD-06 Test Reports
3.4.1 GPre-installation tests
3.4.2 GAcceptance tests
1.6.3 GOutside Plant Test Plan
SD-07 Certificates
1.6.2.1 GTelecommunications Contractor
1.6.2.2 GKey Personnel
1.6.2.3 GManufacturer's Qualifications
SD-08 Manufacturer’s Instructions
2.2.1 GBuilding protector assembly
installation
3.1.8.1 GCable tensions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 38 PAGES
33 82 00 3.1.10.2 GFiber Optic Splices
SD-09 Manufacturer’s Field
Reports
2.16.1 GFactory Reel Test Data
SD-10 Operation and Maintenance
Data
1.6.1.1 GTelecommunications outside
plant (OSP)
SD-11 Closeout Submittals
1.8.1 GRecord Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR