Revised_J-0200000-04_ELINS_BLANK.xlsx

XLSX spreadsheet 89 KB Posted

Attached to
Vertical Transportation Equipment Maintenance and Repair
Solicitation number
N4008520R1201
Issued by

View the file

Other files

File Type Posted
AMD_04_20R1201_VTE.pdf PDF
AMD_03_20R1201_VTE.pdf PDF
AMD_02_20R1201_VTE.pdf PDF
AMD_01_20R1201_VTE.pdf PDF
SOL_20R1201_VTE_Maintenance.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTALS

GOVERNMENT ESTIMATE SUMMARY SHEET
N4008520R1201 - VTE SERVICES AT NSA CRANE
Exhibit ACLIN 0001TOTAL RECURRING ITEMS A001 - A012$0.00
Exhibit ACLIN 0002TOTAL NON-RECURRING ITEMS A701 - A702$20,000.00
Exhibit BCLIN 0003TOTAL RECURRING ITEMS B001 - B013$0.00
Exhibit BCLIN 0004TOTAL NON-RECURRING ITEMS B701 - B702$20,000.00
Exhibit CCLIN 0005TOTAL RECURRING ITEMS C001 - C013$0.00
Exhibit CCLIN 0006TOTAL NON-RECURRING ITEMS C701 - C702$20,000.00
Exhibit DCLIN 0007TOTAL RECURRING ITEMS D001 - D013$0.00
Exhibit DCLIN 0008TOTAL NON-RECURRING ITEMS D701 - D702$20,000.00
Exhibit ECLIN 0009TOTAL RECURRING ITEMS E001 - E013$0.00
Exhibit ECLIN 0010TOTAL NON-RECURRING ITEMS E701 - E702$20,000.00

TOTAL PRICE: $100,000.00

ELIN Recurring - Base

Government Estimate EXHIBIT LINE ITEMS CONTRACT NUMBER N4008520R1201 VTE Services EXHIBIT A
BASE PERIOD - RECURRING WORK

PROVIDE PRICES TO PERFORM VERTICAL TRANSPORTATION EQUIPMENT (VTE) SERVICES - RECURRING IN ACCORDANCE WITH SECTION 1502000 SPEC ITEM 3 ELINS A001 - A012

UNIT OFUNITTOTAL
ELINCACDESCRIPTIONQTYISSUEPRICEAMOUNT
CNIC2 VTE: 1 elevator 1 lift
Recurring Work
A001Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

A002 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 2 Each $ - 0

A003Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.32Each$ - 0
A004Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.31Each$ - 0
TOTAL CNIC RECURRING LINE ITEMS - A001 - A004$ - 0
NSWC21 VTE: 15 elevators 6 lifts
Recurring Work
A005Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

A006 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 21 Each $ - 0

A007Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.321Each$ - 0
A008Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.33Each$ - 0
A009Category 5 inspections with a 5 year TRACTION elevator inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.31Each$ - 0
TOTAL NSWC RECURRING LINE ITEMS - A005 - A009$ - 0
CAAA3 VTE: 2 elevators 1 lift
Recurring Work
A010Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

A011 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 3 Each $ - 0

A012 Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.3 3 Each $ - 0

TOTAL CAAA RECURRING LINE ITEMS - A010 - A012 $ - 0

TOTAL RECURRING LINE ITEMS - A001 - A012 $ - 0

Page &P

ELIN Non-recurring - Base

EXHIBIT LINE ITEMS CONTRACT NUMBER N4008520R1201 EXHIBIT A
BASE PERIOD - NON-RECURRING WORK
PROVIDE UNIT PRICES TO PERFORM VERTICAL TRANSPORTATION (VTE) SERVICES - NON-RECURRING WORK IN ACCORDANCE WITH SECTION 1502000 SPEC ITEM 4 ELINS A701 - A702
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

A701Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call or IMP repair. Task order completion times and applicable IMAP CAC's will be specified on each order.150LH$ - 0
A702Material Costs- MUST BE NEGOTIATED BY KO.Price for material to support unit priced labor work (negotiated). Material And Equipment for repairs The contractor shall provide such materials and or equipment for repairs of VTE as required by the government

The Contractors cost for material and equipment procured under this ELIN will be reimbursed at the invoice cost, plus a "Fixed Burden Rate". "Fixed Burden Rate" is defined as additional cost, expressed as a percentage of the invoice cost for the Contractor's handling and Overhead. The invoice cost is the supplier's actual invoice for materials and equipment purchased for incorporation in the contract-related repair. The contractor shall provide a copy of the supplier's invoices for material and equipment procured under this ELIN. Note: The amount listed in the exhibit line items is for proposal valuation purposes only and does not necessarily indicate any quantity of material/equipment required by the Government.

For proposal purposes only, assume the value of material is $20,000 To calculate the amount of ELIN A702 multiply $20,000 by the markup percent + 100%. For example if the percent markup is 10% then $20,000x1.1=$22,000 which is entered in ELIN A70220,000%$ 20,000.00
TOTAL NON-RECURRING LINE ITEMS- A701 - A702
$ 20,000.00

Page &P

SECTION J

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

SECTION J

EXHIBIT A - CLIN 9001

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004

ELIN Recurring - 1ST OPT PERIOD

EXHIBIT LINE ITEMS CONTRACT NUMBER N4008520R1201 EXHIBIT B
1ST OPTION PERIOD - RECURRING WORK

PROVIDE PRICES TO PERFORM VERTICAL TRANSPORTATION EQUIPMENT (VTE) SERVICES - RECURRING IN ACCORDANCE WITH SECTION 1502000 SPEC ITEM 3 ELINS B001 - B013

UNIT OFUNITTOTAL
ELINCACDESCRIPTIONQTYISSUEPRICEAMOUNT
CNIC2 VTE: 1 elevator 1 lift
Recurring Work
B001Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

B002 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 2 Each $ - 0

B003Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.32Each$ - 0
B004Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.30Each$ - 0
TOTAL CNIC RECURRING LINE ITEMS - B001 - B004$ - 0
NSWC21 VTE: 15 elevators 6 lifts
Recurring Work
B005Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

B006 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 21 Each $ - 0

B007Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.321Each$ - 0
B008Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.30Each$ - 0
B009Category 5 inspections with a 5 year TRACTION elevator inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.30Each$ - 0
TOTAL NSWC RECURRING LINE ITEMS - B005 - B009$ - 0
CAAA3 VTE: 2 elevators 1 lift
Recurring Work
B010Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

B011 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 3 Each $ - 0

B012Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.33Each$ - 0
B013Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.30Each$ - 0

TOTAL CAAA RECURRING LINE ITEMS - B010 - B013 $ - 0

TOTAL RECURRING LINE ITEMS - B001 - B013 $ - 0

ELIN Non-recur - 1ST OPT PERIOD

EXHIBIT LINE ITEMS CONTRACT NUMBER N4008520R1201 EXHIBIT B
1ST OPTION PERIOD - NON-RECURRING WORK
PROVIDE UNIT PRICES TO PERFORM VERTICAL TRANSPORTATION (VTE) SERVICES - NON-RECURRING WORK IN ACCORDANCE WITH SECTION 1502000 SPEC ITEM 4 ELINS B701 - B702
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

B701Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call or IMP repair. Task order completion times and applicable IMAP CAC's will be specified on each order.150LH$ - 0
B702Material Costs- MUST BE NEGOTIATED BY KO.Price for material to support unit priced labor work (negotiated). Material And Equipment for repairs The contractor shall provide such materials and or equipment for repairs of VTE as required by the government

The Contractors cost for material and equipment procured under this ELIN will be reimbursed at the invoice cost, plus a "Fixed Burden Rate". "Fixed Burden Rate" is defined as additional cost, expressed as a percentage of the invoice cost for the Contractor's handling and Overhead. The invoice cost is the supplier's actual invoice for materials and equipment purchased for incorporation in the contract-related repair. The contractor shall provide a copy of the supplier's invoices for material and equipment procured under this ELIN. Note: The amount listed in the exhibit line items is for proposal valuation purposes only and does not necessarily indicate any quantity of material/equipment required by the Government.

For proposal purposes only, assume the value of material is $20,000 To calculate the amount of ELIN B702 multiply $20,000 by the markup percent + 100%. For example if the percent markup is 10% then $20,000x1.1=$22,000 which is entered in ELIN B70220,000%$ 20,000.00
TOTAL NON-RECURRING LINE ITEMS- B701 - B702
$ 20,000.00

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

SECTION J

EXHIBIT A - CLIN 9001

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004

ELIN Recurring -2ND OPT PERIOD

EXHIBIT LINE ITEMS CONTRACT NUMBER N4008520R1201 EXHIBIT C
2ND OPTION PERIOD - RECURRING WORK

PROVIDE PRICES TO PERFORM VERTICAL TRANSPORTATION EQUIPMENT (VTE) SERVICES - RECURRING IN ACCORDANCE WITH SECTION 1502000 SPEC ITEM 3 ELINS C001 - C013

UNIT OFUNITTOTAL
ELINCACDESCRIPTIONQTYISSUEPRICEAMOUNT
CNIC2 VTE: 1 elevator 1 lift
Recurring Work
C001Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

C002 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 2 Each $ - 0

C003Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.32Each$ - 0
C004Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.30Each$ - 0
TOTAL CNIC RECURRING LINE ITEMS - C001 - C004$ - 0
NSWC21 VTE: 15 elevators 6 lifts
Recurring Work
C005Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

C006 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 21 Each $ - 0

C007Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.321Each$ - 0
C008Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.30Each$ - 0
C009Category 5 inspections with a 5 year TRACTION elevator inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.30Each$ - 0
TOTAL NSWC RECURRING LINE ITEMS - C005 - C009$ - 0
CAAA3 VTE: 2 elevators 1 lift
Recurring Work
C010Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

C011 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 3 Each $ - 0

C012Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.33Each$ - 0
C013Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.30Each$ - 0

TOTAL CAAA RECURRING LINE ITEMS - C010 - C013 $ - 0

TOTAL RECURRING LINE ITEMS - C001 - C013 $ - 0

ELIN Non-recur - 2ND OPT PERIOD

EXHIBIT LINE ITEMS CONTRACT NUMBER N4008520R1201 EXHIBIT C
2ND OPTION PERIOD - NON-RECURRING WORK
PROVIDE UNIT PRICES TO PERFORM VERTICAL TRANSPORTATION (VTE) SERVICES - NON-RECURRING WORK IN ACCORDANCE WITH SECTION 1502000 SPEC ITEM 4 ELINS C701 - C702
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

C701Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call or IMP repair. Task order completion times and applicable IMAP CAC's will be specified on each order.150LH$ - 0
C702Material Costs- MUST BE NEGOTIATED BY KO.Price for material to support unit priced labor work (negotiated). Material And Equipment for repairs The contractor shall provide such materials and or equipment for repairs of VTE as required by the government

The Contractors cost for material and equipment procured under this ELIN will be reimbursed at the invoice cost, plus a "Fixed Burden Rate". "Fixed Burden Rate" is defined as additional cost, expressed as a percentage of the invoice cost for the Contractor's handling and Overhead. The invoice cost is the supplier's actual invoice for materials and equipment purchased for incorporation in the contract-related repair. The contractor shall provide a copy of the supplier's invoices for material and equipment procured under this ELIN. Note: The amount listed in the exhibit line items is for proposal valuation purposes only and does not necessarily indicate any quantity of material/equipment required by the Government.

For proposal purposes only, assume the value of material is $20,000 To calculate the amount of ELIN C702 multiply $20,000 by the markup percent + 100%. For example if the percent markup is 10% then $20,000x1.1=$22,000 which is entered in ELIN C70220,000%$ 20,000.00
TOTAL NON-RECURRING LINE ITEMS- C701 - C702
$ 20,000.00

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

SECTION J

EXHIBIT A - CLIN 9001

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004

ELIN Recurring - 3RD OPT PERIOD

EXHIBIT LINE ITEMS CONTRACT NUMBER N4008520R1201 EXHIBIT D
3RD OPTION PERIOD - RECURRING WORK

PROVIDE PRICES TO PERFORM VERTICAL TRANSPORTATION EQUIPMENT (VTE) SERVICES - RECURRING IN ACCORDANCE WITH SECTION 1502000 SPEC ITEM 3 ELINS D001 - D013

UNIT OFUNITTOTAL
ELINCACDESCRIPTIONQTYISSUEPRICEAMOUNT
CNIC2 VTE: 1 elevator 1 lift
Recurring Work
D001Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

D002 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 2 Each $ - 0

D003Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.32Each$ - 0
D004Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.30Each$ - 0
TOTAL CNIC RECURRING LINE ITEMS - D001 - D004$ - 0
NSWC21 VTE: 15 elevators 6 lifts
Recurring Work
D005Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

D006 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 21 Each $ - 0

D007Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.321Each$ - 0
D008Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.31Each$ - 0
D009Category 5 inspections with a 5 year TRACTION elevator inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.30Each$ - 0
TOTAL NSWC RECURRING LINE ITEMS - D005 - D009$ - 0
CAAA3 VTE: 2 elevators 1 lift
Recurring Work
D0010Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

D011 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 3 Each $ - 0

D012Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.33Each$ - 0
D013Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.30Each$ - 0

TOTAL CAAA RECURRING LINE ITEMS - D010 - D013 $ - 0

TOTAL RECURRING LINE ITEMS - D001 - D013 $ - 0

ELIN Non-recur - 3RD OPT PERIOD

EXHIBIT LINE ITEMS CONTRACT NUMBER N4008520R1201 EXHIBIT D
3RD OPTION PERIOD - NON-RECURRING WORK
PROVIDE UNIT PRICES TO PERFORM VERTICAL TRANSPORTATION (VTE) SERVICES - NON-RECURRING WORK IN ACCORDANCE WITH SECTION 1502000 SPEC ITEM 4 ELINS D701 - D702
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

D701Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call or IMP repair. Task order completion times and applicable IMAP CAC's will be specified on each order.150LH$ - 0
D702Material Costs- MUST BE NEGOTIATED BY KO.Price for material to support unit priced labor work (negotiated). Material And Equipment for repairs The contractor shall provide such materials and or equipment for repairs of VTE as required by the government

The Contractors cost for material and equipment procured under this ELIN will be reimbursed at the invoice cost, plus a "Fixed Burden Rate". "Fixed Burden Rate" is defined as additional cost, expressed as a percentage of the invoice cost for the Contractor's handling and Overhead. The invoice cost is the supplier's actual invoice for materials and equipment purchased for incorporation in the contract-related repair. The contractor shall provide a copy of the supplier's invoices for material and equipment procured under this ELIN. Note: The amount listed in the exhibit line items is for proposal valuation purposes only and does not necessarily indicate any quantity of material/equipment required by the Government.

For proposal purposes only, assume the value of material is $20,000 To calculate the amount of ELIN D702 multiply $20,000 by the markup percent + 100%. For example if the percent markup is 10% then $20,000x1.1=$22,000 which is entered in ELIN D70220,000%$ 20,000.00
TOTAL NON-RECURRING LINE ITEMS- D701 - D702
$ 20,000.00

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

SECTION J

EXHIBIT A - CLIN 9001

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004

ELIN Recurring - 4TH OPT PERIOD

EXHIBIT LINE ITEMS CONTRACT NUMBER N4008520R1201 EXHIBIT E
4TH OPTION PERIOD - RECURRING WORK

PROVIDE PRICES TO PERFORM VERTICAL TRANSPORTATION EQUIPMENT (VTE) SERVICES - RECURRING IN ACCORDANCE WITH SECTION 1502000 SPEC ITEM 3 ELINS E001 - E013

UNIT OFUNITTOTAL
ELINCACDESCRIPTIONQTYISSUEPRICEAMOUNT
CNIC2 VTE: 1 elevator 1 lift
Recurring Work
E001Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

E002 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 2 Each $ - 0

E003Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.32Each$ - 0
E004Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.30Each$ - 0
TOTAL CNIC RECURRING LINE ITEMS - E001 - E004$ - 0
NSWC21 VTE: 15 elevators 6 lifts
Recurring Work
E005Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

E006 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 21 Each $ - 0

E007Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.321Each$ - 0
E008Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.312Each$ - 0
E009Category 5 inspections with a 5 year TRACTION elevator inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.30Each$ - 0
TOTAL NSWC RECURRING LINE ITEMS - E005 - E009$ - 0
CAAA3 VTE: 2 elevators 1 lift
Recurring Work
E010Develop and implement an Integrated Maintenance Program for Vertical Transportation Equipment Systems. Reference Section 1502000-C 3.1, 3.1.1, 3.1.2, 3.1.312Monthly$ - 0

E011 Periodic Inspect, Test, and Operate VTE systems to support Government certification (semi-annually) Reference Section 1502000-C 3.3 3 Each $ - 0

E012Category 1 with a Periodic Inspect, test, and operate VTE systems to support Government certification (annually). Reference Section 1502000-C 3.33Each$ - 0
E013Category 5 inspections with a 5 year Hydro inspect, test, and operate VTE systemsto support government certification. (5 year) Reference Section 1502000-C-3.32Each$ - 0

TOTAL CAAA RECURRING LINE ITEMS - E010 - E013 $ - 0

TOTAL RECURRING LINE ITEMS - E001 - E013 $ - 0

ELIN Non-recur - 4TH OPT PERIOD

EXHIBIT LINE ITEMS CONTRACT NUMBER N4008520R1201 EXHIBIT E
4TH OPTION PERIOD - NON-RECURRING WORK
PROVIDE UNIT PRICES TO PERFORM VERTICAL TRANSPORTATION (VTE) SERVICES - NON-RECURRING WORK IN ACCORDANCE WITH SECTION 1502000 SPEC ITEM 4 ELINS E701 - E702
ELINCACSHORT DESCRIPTIONFULL DESCRIPTIONEST QTYUNIT OF
ISSUEUNIT
PRICETOTAL

AMOUNT

E701Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service call or IMP repair. Task order completion times and applicable IMAP CAC's will be specified on each order.150LH$ - 0
E702Material Costs- MUST BE NEGOTIATED BY KO.Price for material to support unit priced labor work (negotiated). Material And Equipment for repairs The contractor shall provide such materials and or equipment for repairs of VTE as required by the government

The Contractors cost for material and equipment procured under this ELIN will be reimbursed at the invoice cost, plus a "Fixed Burden Rate". "Fixed Burden Rate" is defined as additional cost, expressed as a percentage of the invoice cost for the Contractor's handling and Overhead. The invoice cost is the supplier's actual invoice for materials and equipment purchased for incorporation in the contract-related repair. The contractor shall provide a copy of the supplier's invoices for material and equipment procured under this ELIN. Note: The amount listed in the exhibit line items is for proposal valuation purposes only and does not necessarily indicate any quantity of material/equipment required by the Government.

For proposal purposes only, assume the value of material is $20,000 To calculate the amount of ELIN E702 multiply $20,000 by the markup percent + 100%. For example if the percent markup is 10% then $20,000x1.1=$22,000 which is entered in ELIN E70220,000%$ 20,000.00
TOTAL NON-RECURRING LINE ITEMS- E701 - E702
$ 20,000.00

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .